Vaishno Devi Square is an elevated metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. [1] This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022. [2] [3]
Vaishno Devi Square track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound | Towards → Prajapati Nagar | |
Platform 2 Westbound | Towards ← Lokmanya Nagar Next Station: Ambedkar Square | |
Side platform | Doors will open on the left | ||
L2 | ||
This section is empty. You can help by adding to it. (August 2023) |
Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad and Gandhinagar in Gujarat state of India. Currently the System is 58.66 km (36.450 mi) and has 38 stations.
The Delhi Metro is a rapid transit system which serves Delhi and its adjoining satellite cities of Ghaziabad, Faridabad, Gurugram, Noida, Bahadurgarh and Ballabhgarh in the National Capital Region of India. The system consists of 10 colour-coded lines serving 256 stations, with a total length of 350.42 kilometres (217.74 mi). It is India's largest and busiest metro rail system and the second-oldest, after the Kolkata Metro. The metro has a mix of underground, at-grade, and elevated stations using broad-gauge and standard-gauge tracks. The metro makes over 4,300 trips daily.
Nagpur Metro is a rapid transit system for the city of Nagpur, Maharashtra, India. Phase I of the metro project cost was estimated to cost ₹8,650 crore but the final project cost incurred was ₹9,279 crore (US$1.1 billion). In February 2014, the Government of Maharashtra gave approval for the Metro project, while the Government of India's Ministry of Urban Development had given "In Principle" approval for the project. On 20 August 2014, Union Cabinet gave approval for the development of the project, and the Prime Minister laid the foundation stone on 21 August. Construction began on 31 May 2015, with trial run beginning on 30 September 2017.
The Orange Line, also known as the North–south corridor, of the Nagpur Metro is a metro route of mass rapid transit system in Nagpur, India. It consists of 20 metro stations from Automotive Square to Metro City with a total distance of 22.293 km. Most of the line is elevated. It is the first line of the Nagpur Metro and was inaugurated by Prime Minister Narendra Modi on 7 March 2019, and opened to the public the next day on International Women's Day.
The Aqua Line, also known as the East-West corridor, of the Nagpur Metro is a metro route of the mass rapid transit system in Nagpur, India. It was opened on 28 January 2020.
The Blue Line of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 18 metro stations, starting from Vastral Gam and ending at Thaltej Gam, with a total distance of 21.23 km (13.19 mi), with most of the it being elevated.
Automotive Square is the elevated northern terminal metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Nari Road is an elevated metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Indora Square is an elevated metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Kadvi Square is an elevated metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Gaddi Godam Square is an elevated metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Ambedkar Square is an elevated metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Telephone Exchange is an elevated metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Chitar Oli Square is an elevated metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Agrasen Square is an elevated metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Dosar Vaishya Square is an elevated metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Nagpur Railway Station is an important elevated metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. This metro stations holds the main Nagpur Junction railway station. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.
Prajapati Nagar is the elevated eastern terminal metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India. This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.