Valhall oil field

Last updated
Valhall
Valhall A oljeplatform.jpg
Valhall A oil platforms
North Sea location map.svg
Red pog.svg
Location of Valhall
Country Norway
LocationCentral North Sea
Block2/8,2/11
Offshore/onshoreoffshore
Coordinates 56°16′41.3904″N3°23′43.1916″E / 56.278164000°N 3.395331000°E / 56.278164000; 3.395331000 Coordinates: 56°16′41.3904″N3°23′43.1916″E / 56.278164000°N 3.395331000°E / 56.278164000; 3.395331000
Operator Aker BP
Partners Aker BP 90.0%
Pandion Energy 10.0%
Field history
Discovery1975
Start of development1981
Start of production1982
Production
Current production of oil8,000 barrels per day (~4.0×10^5 t/a)
Producing formations Tor Formation, Hod Formation

Valhall is an oil field in the Norwegian sector of the North Sea. Discovered in 1975, production began in 1982 and is expected to continue until 2050. Valhall is located in 70 metres of water. It produces from chalk in the Tor and Hod Formations of Late Cretaceous age. The reservoir depth is approximately 2 400 metres.

Contents

Development

The field was originally developed with three facilities (QP, DP and PCP) but now the complex consists of five separate steel platforms that are bridge-connected. There are also two unmanned flank platforms, one in the south and one in the north, both around 6 kilometres from the field centre.

Quarters Platform (QP)

The QP was built in 1979 and started being used in July 1981. It was bridge linked to PCP. It had accommodation for 208 people. This module is undergoing deconstruction at the demolition yard in Leirvik, NOR.

VALHALL-A Quarters Platform (QP) VALHALL-A QP 1.jpg
VALHALL-A Quarters Platform (QP)
VALHALL-A Quarters Platform (QP) VALHALL-A QP 2.jpg
VALHALL-A Quarters Platform (QP)

Drilling Platform (DP)

The DP is situated centrally and has 30 well slots. The platform started operation on 17 December 1981 with the first covered derrick. It was bridge linked to PCP.

Production Platform (PCP)

The PCP is built to process 168,000 barrels (26,700 m3) of oil and 350 million cubic feet (9,900,000 m3) of gas per day. The platform is 65 metres high and weighs 21,000 tons. The oil production is piped to 2/4-J at the Ekofisk Center and goes to Teesside in England. The gas is transported directly via the Norpipe pipeline to Emden in Germany. The platform also processes oil and gas that comes from the Hod oil field.

Riser Platform (RP)

The RP (Ekofisk 2/4 G) was installed in April and June 1981. It received oil and gas from PCP through two 36.8 km long 20-inch diameter pipelines. It delivered the oil and gas to Ekofisk Tank to which it was bridge linked.

Wellhead Platform (WP)

The WP was installed in April 1996 and first oil production started in June the same year. WP has 19 well slots. A central location and spare available capacity make it possible for the Valhall complex to also receive oil and gas from several adjacent fields.

Water Injection Platform (WP)

The WIP is a fixed steel platform, bridge linked to the existing Valhall WP. Water injection is expected to increase oil recovery from 31% to 38%. The integrated topsides has water injection facilities, seawater and produced water treatment facilities and power generation. The platform-based drilling rig's configuration allows for drilling and maintenance of wells on the new platform (24 wells total) and on the existing WP platform (19 wells total). The IP has integrated connections to the onshore operating centre.

Valhall Flank Development (VFD)

The VFD consists of two identical unmanned wellhead platforms each equipped with 16 drilling slots and located about 6 km (one to the North and one to the South) from the existing Valhall Facilities where wellstreams will be processed.

Initially about eight wells will be drilled from each platform. There is room for future water injection at either wellhead platform. The two wellhead platforms are powered from Valhall and monitored from the existing Valhall facilities via a fiber optic cable.

Drilling commenced on the South Flank by West Epsilon in October 2002 and continued until August 2003 when it moved to drill the North Flank. The South Flank started production 8 May 2003. While the North Flank came on stream 7 January 2004.

New field centre

Due to subsidence of the field centre and a desire to operate more efficiently a new field centre is being developed for Valhall. The new field centre will probably extend the life of the field to 2050.

Production & Hotel (PH) Facility

The PH facility is an integrated processing and accommodation platform, with a power from shore module and bridges linking it to the existing Valhall platforms. The topsides weigh 18,500 tonnes, the jacket structure weighs 8,400 tonnes and there are 180 single cabins on the platform. [1]

Front-end engineering and design work was undertaken by Fabricom and Wood Group, with the deck constructed by Heerema. [2] [3] The ten-storey living quarters module was constructed by SLP Engineering, with Alphastrut supplying a lightweight aluminium support system. [2] [4] [5] The steel jacket substructure was fabricated and installed by Kværner. [6]

The steel jacket for the PH platform was installed in June 2009, with the main deck and living quarters module added in July 2010 and the power from shore module becoming operational in June 2011. [7] Production from the PH platform commenced in January 2013 and is expected to reach 65,000 barrels of oil a day. [1]

See also


Related Research Articles

The Brae field is a Scottish oil field. The name comes from a Scots language word for hillside. The field was discovered in 1974 by well 16/7-1 drilled by a semi-submersible rig Odin Drill for operator Pan Ocean.

<span class="mw-page-title-main">Ekofisk oil field</span> Norwegian North Sea oil field

Ekofisk is an oil field in block 2/4 of the Norwegian sector of the North Sea about 320 km (200 mi) southwest of Stavanger. Discovered in 1969 by Phillips Petroleum Company, it remains one of the most important oil fields in the North Sea. This was the first discovery of oil after the drilling of over 200 exploration wells in the North Sea "triggered" by the Groningen gas field discovery. In 1971, Phillips started producing directly to tankers from four subsea wells. Oil production is planned to continue until at least 2050.

Oseberg is an offshore oil field with a gas cap in the North Sea located 140 km (87 mi) northwest of the city of Bergen on the southwestern coast of Norway. The field, which is 25 km long by 7 km wide, was discovered in 1979 and its development is known to be one of the significant milestones in emergence of Norway's independent oil and gas industry. The Oseberg field was named after Oseberg ship, one of Norway's most significant archeological discoveries. The ancient Viking ship from the early 9th century was discovered in a 1904 historical excavation of a burial mound at the Oseberg Farm, south of Oslo.

The Clair oilfield is an offshore oil field in Scottish territorial waters 75 kilometres (47 mi) west of Shetland in water depths of up to 140 metres (460 ft). The field is the largest oilfield on the UK Continental Shelf with an estimated 8 billion barrels of oil-in-place, according to the BP Plc’s website. It extends over an area of some 220 square kilometres (85 sq mi), covering five licence blocks.

Norpipe is a subsea oil and natural gas pipelines system in the North Sea. It supplies oil from the Norwegian Ekofisk and associated fields in the North Sea to the United Kingdom and natural gas to Germany.

<span class="mw-page-title-main">Vetco</span>

Vetco was established in July 2004 and operated through its subsidiaries Vetco Gray and Vetco Aibel AS. Vetco was the result of a consortium consisting of the private equity firms Candover, 3i and JP Morgan Partners taking over ABB's oil and gas division; ABB Offshore Systems. Vetco was made out of companies that have serviced the upstream oil and gas industry since 1903. These companies are suppliers of products, systems and services for onshore and offshore drilling and production, project management, engineering, procurement and construction services, process systems and equipment, maintenance, modification and operations. Vetco was headquartered in London UK, and employed over 10000 people in more than 30 countries worldwide.

Amethyst is a natural gas field in the Southern North Sea, about 30 miles (48 km) east of the Yorkshire coast. Gas lies in a Permian sandstone reservoir around 2,700 metres (8,900 ft) below the seabed. The gasfield is operated by BP.

The Eastern Trough Area Project, commonly known as ETAP, is a network of nine smaller oil and gas fields in the Central North Sea covering an area up to 35 km in diameter. There are a total of nine different fields, six operated by BP and another three operated by Shell, and together, they are a rich mix of geology, chemistry, technology and equity arrangements.

NorSea Com-1, now called Tampnet, is a submarine telecommunications cable system in the North Sea linking the UK and Norway, and connecting five off-shore platforms.

The Magnus oilfield is a large oilfield in the United Kingdom's zone of North Sea. It is located 160 kilometres (99 mi) north-east of the Shetland Islands. The field is located mainly in Block 211/12a. Resources are estimated to total 1.54 billion barrels of oil, of which 869 million barrels are recoverable reserves.

Azeri is an offshore oil field in the Caspian Sea, located 100 km (62 mi) east of Baku, Azerbaijan and is a part of the larger Azeri-Chirag-Guneshli (ACG) project. The Azeri field includes Central Azeri, West Azeri, East Azeri production platforms compression and water injection platform (C&WP). The field was discovered in 1988 and originally it was named after 26 Baku Commissars.

Heimdal is an offshore natural gas field in the North Sea located 212 kilometres (132 mi) northwest of the Stavanger, Norway. Heimdal serves as a connection hub for processing and distribution of natural gas from satellite fields.

Ula is an offshore oil field located in the southern Norwegian section of North Sea along with Gyda, Tambar and Tambar East fields making up the UGT area, usually attributed to DONG Energy's main areas of exploration and production activity.

Tambar is an offshore oil field located in the southern Norwegian section of North Sea along with Ula and Gyda fields making up the UGT area, usually attributed to DONG Energy's main areas of exploration and production activity. The Ula field was discovered in 1983 and came online in 2001. Tambar was discovered in 1983 and became operational in July 2001. It contains confirmed 46.9 million m3 of oil.

<span class="mw-page-title-main">Buzzard oil field</span>

The Buzzard Oil Field is an oil field located in the North Sea Blocks 19/10, 19/5a, 20/6 and 20/1s. It was discovered in 2001 by PanCanadian, and developed initially by PanCanadian's successor EnCana and then by Nexen. The oil field was initially operated and owned by Nexen which is now a subsidiary of China's CNOOC.

The Golden Eagle oilfield is an offshore oil field in Scottish territorial waters in water depths of up to 114 metres (374 ft). Located around 70 miles (110 km) north-east of Aberdeen, it occupies licence block 20/1N. The nearby Peregrine field and Solitaire field also form part of the Golden Eagle Area Development.

Alvheim Field is a Norwegian oil and gas field located in the northern part of the North Sea near the border with the British sector, consisting mainly of Boafält, Kneler Field and Kameleon Field. Parts of the Boafält are located in the British sector at block 9/15. The reservoir consists of early-tier sandstone. The depth of the area is 120–130 meters. The production ship is located approximately 12 km west of Heimdal Gassenter, at 59.56684°N 1.99731°E.

<span class="mw-page-title-main">Montrose oil field</span> UK offshore crude oil field

The Montrose oil field is a significant crude oil producing field in the UK sector of the central North Sea, 210 km east of Aberdeen. Production of oil started in 1976 and a major upgrade in 2016 extended the field life to beyond 2030.

The Caister Murdoch System (CMS) was a major natural gas collection, processing and transportation system in the UK sector of the southern North Sea. It comprised 11 platforms, 8 subsea wellhead completions and interconnecting pipelines centered about 155 km east of Flamborough Head Yorkshire. It operated from 1993 to 2018.

References

  1. 1 2 "BP starts production from new Valhall platform in Norwegian North Sea | Media | Norway". Archived from the original on 2015-02-26. Retrieved 2015-02-26.
  2. 1 2 "Valhall Oilfield, North Sea".
  3. "BP Valhall main deck leaves Heerema Zwijndrecht". hfg.heerema.com.
  4. "Alphastrut Flooring & Cable Management System Fitted In BP Valhall". www.alphastrut.com.
  5. "Murray Metals to expand through Alphastrut deal". HeraldScotland.
  6. "Valhall offshore platform contract to Aker Kvaerner - Aker Solutions". Archived from the original on 2015-02-26. Retrieved 2015-02-26.
  7. "Valhall Oilfield – a timeline".

Norwegian Petroleum Directorate: Facts 2012 - Valhall

[1]

  1. FREMO MINGE, FILIP. "Technical Drawings and Documentation of the Valhall Platforms". INDUSTRIMINNE.NO. Norwegian Petroleum Museum.