Veresen

Last updated
Veresen Inc.
Company typePublic company
IndustryNatural Gas/Pipelines
Defunct2017 (2017)
FateAcquired by Pembina Pipeline
Headquarters,
Key people
Don L. Althoff, CEO; Stephen W. C. Mulherin, Chairman
Website www.vereseninc.com [ dead link ]

Veresen Inc. was a Calgary, Alberta-based energy infrastructure company with three main lines of business: pipelines, natural gas and power generation. It was a publicly-traded company on the Toronto Stock Exchange, and was known as Fort Chicago Energy Partners L.P. In 2017, it was acquired by Pembina Pipeline for $9.7 billion. [1]

Contents

Business segments

Pipelines

Natural gas

Power generation

Move into renewable energy

Beginning in the spring of 2010, Fort Chicago began aggressively moving into the renewable energy sector, with a particular focus on British Columbia.

Pristine Power

In September 2010, Fort Chicago reached an agreement to purchase Pristine Power, which develops biomass and hydro power projects. Prior to this transaction, Fort Chicago had an 11.4% stake in Pristine.

In September 2009, Pristine Power increased its ownership position from 10% to 47% in the Klinaklini project proposed by Kleana Power. The deal was structured as a nominal down payment with future payments coming after various milestones, notably the signing of a PPA (however the project was unsuccessful in 2008 Call). With this deal, Pristine increased its ownership position in several other projects, including Machmell River, and expected that its generation portfolio would double to 282 MW.

ENMAX Power Corporation

In September 2010, Fort Chicago reached an agreement to purchase three BC-based hydro assets of ENMAX, the City of Calgary's municipally-owned electric utility.

British Columbia based hydro assets
  • Furry Creek Hydro, in operation since 2004 with a 3 km penstock which drops 366 meters to an 11 MW Pelton wheel. The plant is 40 km north of Vancouver accessed by the Sea to Sky highway.
  • Clowhom Hydro has two run-of-river hydroelectric plants located northeast of Sechelt, BC. Upper Clowhom has a 1900-meter penstock leading to an 11 MW turbine. Similarly Lower Clowhom has a 1200-meter penstock leading to an identical 11 MW turbine. [7]
  • Culliton Creek Hydro Facility is a run-of-river hydroelectric project commissioned in May 2016, located 20 km north of Squamish, BC. A 3 km penstock delivers water downstream to the powerhouse housing two 7.5 MW turbines. (Veresen owns a 50% interest) [8]

References and footnotes

  1. "Pembina Pipeline offers $9.7B for friendly takeover of competitor Veresen". CBC News. Retrieved 2018-02-20.
  2. "Alliance Pipeline". Archived from the original on 2010-01-05. Retrieved 2010-01-17.
  3. "AEGS". Archived from the original on 2010-01-05. Retrieved 2010-01-17.
  4. "Alton Gas Storage | Fort Chicago". Archived from the original on 2010-01-08. Retrieved 2010-01-17.
  5. Sickenger, Ted (25 March 2016). "Jordan Cove LNG finds potential gas buyer, says there is need for the project". The Oregonian . Retrieved 25 March 2016.
  6. "Fort Chicago's Power Business | Fort Chicago". Archived from the original on August 11, 2010. Retrieved January 17, 2010.
  7. "Clowhom – Canadian Projects".
  8. "Culliton Creek Hydro Facility generating power for B.C. | BC Gov News". 26 May 2016.

Related Research Articles

<span class="mw-page-title-main">Power station</span> Facility generating electric power

A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.

<span class="mw-page-title-main">TC Energy</span> Canadian energy company

TC Energy Corporation is a major North American energy company, based in the TC Energy Tower building in Calgary, Alberta, Canada, that develops and operates energy infrastructure in Canada, the United States, and Mexico. The company operates three core businesses: Natural Gas Pipelines, Liquids Pipelines and Energy.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

<span class="mw-page-title-main">TransAlta</span> Canadian electricity generation company

TransAlta Corporation is an electricity power generator and wholesale marketing company headquartered in Calgary, Alberta, Canada. It is a privately owned corporation and its shares are traded publicly. It operates 76 power plants in Canada, the United States, and Australia. TransAlta operates wind, hydro, natural gas, and coal power generation facilities. The company has been recognized for its leadership in sustainability by the Dow Jones Sustainability North America Index, the FTSE4Good Index, and the Jantzi Social Index. TransAlta is Canada's largest investor-owned renewable energy provider.

<span class="mw-page-title-main">History of the petroleum industry in Canada (natural gas liquids)</span>

Canada's natural gas liquids industry dates back to the discovery of wet natural gas at Turner Valley, Alberta in 1914. The gas was less important than the natural gasoline - "skunk gas" it was called, because of its distinctive odour - that early producers extracted from it. That natural gas liquid (NGL) could be poured directly into an automobile's fuel tank.

<span class="mw-page-title-main">Run-of-the-river hydroelectricity</span> Hydroelectric power station

Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, so the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.

FortisBC is a Canadian owned, British Columbia based regulated utility providing natural gas, and electricity. FortisBC has approximately 2,600 employees serving more than 1.2 million customers in 135 B.C. communities and 58 First Nations communities across 150 Traditional Territories.

Kakabeka Generating Station is a hydroelectric facility operated by Ontario Power Generation on the bank of the Kaministiquia River, 2 km (1.2 mi) downstream from Kakabeka Falls in the community of Kakabeka Falls, Ontario, 30 km (19 mi) west of Thunder Bay. The plant provides energy to the city of Thunder Bay and area. The station is one of ten hydroelectric stations in Ontario Power Generation's Northwest Plant Group, and is remotely operated from Thunder Bay.

Natural gas was Canada's third largest source of energy production in 2018, representing 22.3% of all energy produced from fuels in the country. By contrast, the share of fuel-based energy production from natural gas in 2013 was 17.0%, indicating a growth rate of approximately 1.06% per year.

<span class="mw-page-title-main">Energy in Armenia</span>

Energy in Armenia is mostly from natural gas. Armenia has no proven reserves of oil or natural gas and currently imports most of its gas from Russia. The Iran-Armenia Natural Gas Pipeline has the capacity to equal imports from Russia.

Martin Next Generation Solar Energy Center is the solar parabolic-trough component of an integrated solar combined cycle (ISCC) 1150 MW plant, in western Martin County, Florida, United States, just north of Indiantown. The project was built by Florida Power & Light Company (FPL). Lauren Engineers & Constructors (Abilene, TX) was the EPC contractor for the project. Its construction began in 2008 and was completed by the end of 2010.

The Clowhom River is a short, 19.8-kilometre (12.3 mi) river in British Columbia. It flows into the head of the Salmon Inlet about 26.2 km west of Squamish.

<span class="mw-page-title-main">Capital Power</span> Canadian power generation

Capital Power is a North American independent power generation company based in Edmonton, Alberta, Canada. It develops, acquires, owns and operates power generation facilities using a variety of energy sources.

The Jordan Cove Energy Project was a proposal by Calgary-based energy company Pembina to build a liquefied natural gas export terminal within the International Port of Coos Bay, Oregon. The natural gas would have been transported to the terminal by the Pacific Connector Gas Pipeline. The proposal has been met with objections from landowners, Tribes, and commercial entities since 2010 and was cancelled in late 2021.

Pembina Pipeline is a Canadian corporation that operates transportation and storage infrastructure delivering oil and natural gas to and from parts of Western Canada. Since 2003, storage has also included ethylene at one location. Western Canada is the source of all products transported by Pembina pipeline systems which include the Syncrude pipeline, Horizon pipeline, and Cheecham oilsands pipelines.

<span class="mw-page-title-main">Energy in Jordan</span>

Energy in Jordan describes energy and electricity production, consumption and import in Jordan. Jordan is among the highest in the world in dependency on foreign energy sources, with 92.3% of the country's energy supply being imported.

Island Generating Station is a natural gas-fired station owned by Capital Power Corporation, in Campbell River, British Columbia, Canada. The plant operates as a co-generation facility under a 20-year power purchase agreement with BC Hydro while steam is supplied to Elk Falls Mill.

Independent power producer (IPP) projects have had a significant presence in British Columbia since the 1980s. Their relationship with BC Hydro grew from the province's need to supply growing energy demands and implementation of the 2002 Energy Strategy, which mandated that BC Hydro would purchase its energy supply from IPPs rather than generating the supply itself. There are a variety of power projects in BC, with the most popular being hydroelectricity and biomass projects. In recent years, more attention has been placed on the environmental effects of IPP projects and the social implications it has to residents living around the project development sites. Despite the decline in demand for new IPP projects, in 2016 they supplied 20,000 GWh, one-third of BC Hydro's total.