Wachusett station

Last updated

Wachusett
First revenue train at Wachusett station (1), September 2016.JPG
The first revenue train at Wachusett station in September 2016
General information
Location55 Authority Drive
Fitchburg, Massachusetts
Coordinates 42°33′12″N71°50′52″W / 42.5534°N 71.8477°W / 42.5534; -71.8477
Line(s) Pan Am Southern Freight Main Line
Platforms1 side platform
Tracks3 (2 mainline plus 1 station siding)
ConnectionsAiga bus trans.svg MART: Wachusett Commuter Shuttle, 11
Aiga bus trans.svg Wachusett Mountain shuttle (winter)
Construction
Parking359 spaces ($3.00 fee)
Bicycle facilities10 spaces
AccessibleYes
History
OpenedSeptember 30, 2016 [1]
Passengers
2018132 (weekday average boardings) [2]
Services
Preceding station MBTA.svg MBTA Following station
Terminus Fitchburg Line Fitchburg
Former services
Preceding station Boston and Maine Railroad Following station
South Ashburnham
toward Troy
Boston – Troy Fitchburg
toward Boston
Location
Wachusett station

Wachusett station is a commuter rail station on the MBTA Commuter Rail Fitchburg Line. It is northwest of the intersection of Massachusetts Route 2 and Route 31 in Fitchburg, Massachusetts. It serves as the northwestern terminus for Fitchburg Line trains. The opening of Wachusett extended service 4.5 miles (7.2 km) west from Fitchburg on the Pan Am Southern main line, lengthening the Fitchburg Line to 54 miles (87 km). The station was expected to draw 400 daily riders; by 2018, daily ridership was 132.

Contents

After years of planning and discussion, work on the station began with site preparation in December 2012. Construction began in mid-2013. The station opened for limited weekday service on September 30, 2016, to satisfy the terms of the federal grant that funded it; full service began on November 21, 2016. At 54 miles (87 km) from North Station, Wachusett is the outermost MBTA station in Massachusetts; only Wickford Junction in Rhode Island is farther from Boston.

History

Former service

Freight wreck at Westminster station in 1914 Westminster freight wreck (1), April 1914.jpg
Freight wreck at Westminster station in 1914

The first portion of the Vermont and Massachusetts Railroad opened on September 1, 1847 as an extension of the Fitchburg Railroad. [3] [4] Two stations were located near the modern Wachusett site: [5] :163

Westminster station, serving Westminster, Massachusetts, was located on Bartherick Road off State Road (Route 2A), about 1.4 miles (2.3 km) west of the modern station site. [6] It was among the original stations opened with the railroad. [7] The station building burned in 1908. [8] In April 1914, 17 cars of an eastbound freight derailed and damaged the replacement station building. [9]

Wachusett station was located south of Princeton Road (Route 31) in the Crockerville section of Fitchburg, Massachusetts, about 0.3 miles (0.48 km) northeast of the modern station. [6] It opened by 1865. [10] A freight wreck at the station in July 1905 killed two men. [11]

The Boston and Maine Railroad (B&M) acquired the Fitchburg Railroad in 1900. [5] Westminster station closed between 1917 and 1929; Wachusett was served only by a single westbound train by 1929, and was closed between 1942 and 1946. [12] [13] [14] [15] All passenger service west of Fitchburg was terminated by the B&M in 1960. [5] :203 MBTA Commuter Rail service was extended west from Fitchburg to Gardner in January 1980 with no intermediate stations. [1] A possible infill station in Westminster was included in a 1981 fare tariff. [16] Service was cut back to Fitchburg at the end of 1986. [1] The derelict Wachusett freight depot, located just south of the station, was demolished in 2005 or 2006. [17]

Planning for restoration

Restoring service to this station in Gardner, which had previously run from 1980 to 1986, was considered but rejected in favor of a shorter extension to Wachusett Former MBTA platform, Gardner MA.jpg
Restoring service to this station in Gardner, which had previously run from 1980 to 1986, was considered but rejected in favor of a shorter extension to Wachusett

Restoring commuter rail service past Fitchburg has been considered since 1987. In 2000, the Massachusetts State Legislature passed a bill that directed the MBTA to "conduct a feasibility study regarding the reestablishment of the commuter rail line to the cities of Gardner and Athol on the existing Fitchburg/Gardner/Athol spur line" as one of many expansion and improvement projects. [18]

However, restoration of service all the way to Gardner, much less Athol, was deemed impractical for several reasons. Gardner is 64 miles (103 km) and Athol 81 miles (130 km) by rail for North Station – outside normal commuting distances. [5] The line between Fitchburg and Gardner would cost $104.2 million to double track, and speeds are limited due to the grades going through the Wachusett Mountain range. Because the Route 2 expressway is faster along the corridor than rail service would be, the station at Gardner would have attracted just 50 riders per day. [19] The Fitchburg Commuter Rail Line Service Expansion Study was released in February 2005; it recommended a shorter interim extension to a new park-and-ride station off Route 2 in West Fitchburg, with possible extension to Gardner later. [20]

Funding and design

Entrance to the station construction site in January 2013. Signs noting the contributions of the Federal Transit Administration (part of US DOT) are displayed. MBTA construction site, Fitchburg MA.jpg
Entrance to the station construction site in January 2013. Signs noting the contributions of the Federal Transit Administration (part of US DOT) are displayed.

On February 17, 2010, the US Department of Transportation awarded a $55.5M TIGER grant for the station in West Fitchburg and a new layover facility in the town of Westminster. [21] In June 2010, the MBTA and Pan Am Railways reached an agreement for trackage rights and fees on several lines, including MBTA access to Wachusett station and the layover on the Pan Am Southern mainline partially owned by Pan Am Railways. [22] The project officially began with a publicized groundbreaking on October 18, 2010, and was originally scheduled to be completed by the first quarter of 2012. [23] [24] However, by February 2012, the station was just at 30% design phase, with track and signals to reach 30% design by late spring. As of then, the estimated completion date was October 2013. [25]

The new station includes a single gently curving, high-level side platform 800 feet (240 m) long, located on a siding that allows trains to pull fully clear of the more-curved Pan Am Southern mainline. The station has a parking lot with 359 spaces as well as a Montachusett Regional Transit Authority (MART) bus dropoff area and a kiss-and-ride area. [26]

On March 16, 2012, a kickoff event was held for a "smart growth corridor" consisting of 12,500 acres (5,100  ha ) acres within a 2.5-mile (4.0 km) bikeable radius of the station. [27] In October 2012, $3.6 million in federal funds was given to the now-$63 million project to cover a budget shortfall due to design and site issues. The station was then expected to be completed by the end of 2013 and to open in Spring 2014. [28]

Layover yard controversy

Wachusett Layover under construction in November 2015 Wachusett Layover construction from the southwest, November 2015.jpg
Wachusett Layover under construction in November 2015

Although the station itself was not the subject of significant controversy, the proposed layover facility 1.5 miles (2.4 km) to the west met with community opposition in Westminster over noise pollution effects. [29] The layover, with six 1,000-foot (300 m) tracks, replaced a similar, smaller yard in East Fitchburg. [26] Work on the layover began in late 2012; on December 28, 2012, the town issued a stop work order over allegations that the MBTA had not obtained the proper permits. [30] In March 2013, the town filed a complaint to the Inspector General of the US Department of Transportation, alleging that delays in the project were a result of the MBTA misleading town officials rather than ordinary construction delays, and asking the DOT to stop work on the project pending an investigation. [31] [32] By early 2014, the MBTA proceeded with construction of the layover yard. [33]

Construction

Station under construction in December 2014 Wachusett station construction, December 2014.JPG
Station under construction in December 2014

The MBTA begin soliciting bids for pre-construction site preparation for the station and the associated layover yard in June 2012. [34] A $3.75 million contract was awarded and notice to proceed given on November 26, 2012. [35] Site preparation work began in early December. Bidding on a nominally-$27.592 million contract for the primary station and layover yard construction opened in February 2013. [36] Bids came in lower than expected; a $22.9 million contract was awarded on May 22, 2013, for construction to be completed by the end of 2014. [37] Track and signal work and bridge repairs were placed in separate contracts. [38]

Notice to proceed for construction was given on June 14, 2013. [36] A second publicized groundbreaking was held on August 12, 2013. [39] In January 2014, an MBTA presentation stated that service would begin in "early 2015". [33] By October 2014, the planned completion date slipped to later in 2015, partially due to a bonding company taking over for the original contractor which went out of business. [40] [41]

In October 2014, MART announced that it would run dedicated bus service from Gardner to Wachusett station when the station opened. [40] By the end of 2014, retaining walls for ramps to the platforms and concrete bases for light poles in the parking lot were in place. Track and signal work on the Pan Am Southern mainline began in Spring 2015. [38] In January 2015, the opening was delayed further to Fall 2016. [38]

On July 11, 2016, the MassDOT Board approved spending an additional $19 million to finish the station by the end of September, bringing the total cost of the extension to $93.3 million. The additional cost included replacement for several Pan Am Southern-owned bridges which were in poorer shape than originally thought, and night and weekend work to speed completion. Service to the station had to begin by September 30, or the state risked a revocation of the $59.2 million in federal funds. [41] Limited service began on September 30, 2016, with two weekday round trips; full service began with the schedule change on November 21, 2016. [1]

The station was estimated to draw 400 daily riders upon opening. [42] By February 2017, ridership averaged 45 to 75 passengers per day, but was growing. [43] This increased to 132 in a 2018 count. [2] At 54 miles (87 km) from North Station, Wachusett is the outermost MBTA station in Massachusetts; only Wickford Junction in Rhode Island is further from Boston. [44] During winter months a free shuttle bus is offered to the Wachusett Mountain Ski Area. The shuttle is timed to connect with an MBTA "ski train", which includes a passenger car with ski racks. [45]

Related Research Articles

<span class="mw-page-title-main">Porter station</span> Transit station in Cambridge, Massachusetts, US

Porter station is a Massachusetts Bay Transportation Authority (MBTA) transit station in Cambridge, Massachusetts. It serves the Red Line rapid transit line, the MBTA Commuter Rail Fitchburg Line, and several MBTA bus lines. Located at Porter Square at the intersection of Massachusetts and Somerville Avenues, the station provides rapid transit access to northern Cambridge and the western portions of Somerville. Porter is 14 minutes from Park Street on the Red Line, and about 10 minutes from North Station on commuter rail trains. Several local MBTA bus routes also stop at the station.

<span class="mw-page-title-main">North Station</span> Train station in Boston, Massachusetts, US

North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Lowell Line</span> MBTA Commuter Rail line

The Lowell Line is a railroad line of the MBTA Commuter Rail system, running north from Boston to Lowell, Massachusetts. Originally built as the New Hampshire Main Line of the Boston & Lowell Railroad and later operated as part of the Boston & Maine Railroad's Southern Division, the line was one of the first railroads in North America and the first major one in Massachusetts.

<span class="mw-page-title-main">Framingham/Worcester Line</span> MBTA commuter railroad line

The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts to Worcester, Massachusetts through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third longest and third busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.

<span class="mw-page-title-main">Fitchburg Line</span> MBTA Commuter Rail line

The Fitchburg Line is a branch of the MBTA Commuter Rail system which runs from Boston's North Station to Wachusett station in Fitchburg, Massachusetts. The line is along the tracks of the former Fitchburg Railroad, which was built across northern Massachusetts, United States, in the 1840s. Winter weekend service includes a specially equipped seasonal "ski train" to Wachusett Mountain.

<span class="mw-page-title-main">South Acton station (MBTA)</span> Railroad station in Acton, Massachusetts

South Acton station is an MBTA Commuter Rail station in Acton, Massachusetts. It serves the Fitchburg Line. It is located off Route 27 near Route 2 in the South Acton area. It is the busiest station on the Fitchburg line, averaging 991 weekday boardings. It serves as a park and ride station for Acton and other suburbs of Boston, with a 287-space parking lot owned by the town.

<span class="mw-page-title-main">Haverhill Line</span> MBTA Commuter Rail line

The Haverhill Line is a branch of the MBTA Commuter Rail system, running north from downtown Boston, Massachusetts through the cities and towns of Malden, Melrose, Wakefield, Reading, Wilmington, Andover, North Andover, Lawrence, and Haverhill.

<span class="mw-page-title-main">Readville station</span> Railway station in Boston, Massachusetts, US

Readville station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station located in the Readville section of the Hyde Park neighborhood of Boston, Massachusetts. It is served by the MBTA Commuter Rail Fairmount, Franklin/Foxboro, and Providence/Stoughton Lines. Readville is the outer terminus for most Fairmount service, though some trips continue as Franklin/Foxboro Line trains. The station is located at a multi-level junction, with the Attleboro Line tracks at ground level and the Dorchester Branch above. Franklin/Foxboro Line trains that run on the Northeast Corridor use a connecting track with a separate platform. An MBTA maintenance and storage yard and a CSX Transportation freight yard are located near the station.

<span class="mw-page-title-main">Ayer station</span> Railway station in Ayer, Massachusetts, US

Ayer station is an MBTA Commuter Rail station located off Main Street in the Ayer Main Street Historic District of Ayer, Massachusetts. It serves the Fitchburg Line. There are three tracks through the station, two of which are served by a pair of low-level side platforms, which are not accessible. There is a shelter on the inbound platform.

<span class="mw-page-title-main">Littleton/Route 495 station</span> Rail station in Littleton, Massachusetts, US

Littleton/Route 495 station is an MBTA Commuter Rail station in Littleton, Massachusetts. It serves the Fitchburg Line. The station is located at the intersection of Grimes Lane and Foster Street near Route 2 and I-495 and serves as a park-and-ride station for both highways.

<span class="mw-page-title-main">Rockport station</span>

Rockport station is an MBTA Commuter Rail station in Rockport, Massachusetts. It is the terminus of the Rockport branch of the Newburyport/Rockport Line. The station complex consists of a single side platform with one revenue track plus 4 layover tracks for parked trains and a short stretch of auxiliary track.

<span class="mw-page-title-main">Montachusett Regional Transit Authority</span> Public transportation organization for Montachusett Region, Massachusetts

The Montachusett Regional Transit Authority (MART) is a public, nonprofit organization established under Chapter 161B of the Massachusetts General Laws to provide public transportation to the Montachusett Region. MART is one of Massachusetts' 15 regional transit authorities and provides public transportation to 21 communities within the Montachusett region consisting of the cities of Fitchburg, Leominster and Gardner, and the towns of Athol, Ashburnham, Ashby, Ayer, Bolton, Boxborough, Hardwick, Harvard, Hubbardston, Lancaster, Littleton, Lunenburg, Royalston, Shirley, Sterling, Stow, Templeton, Westminster, and Winchendon.

<span class="mw-page-title-main">North Leominster station</span> Railroad station in Leominster, Massachusetts, US

North Leominster station is an MBTA Commuter Rail station in Leominster, Massachusetts. It serves the Fitchburg Line. It is located at 34 Nashua Street, east of Main Street. The station, which is accessible, has two side platforms to serve the line's two tracks. There is a small freight yard adjacent to the parking lot and mainline tracks on the south end of the inbound platform. A garage opened in 2014 to nearly triple parking capacity at the station, which serves as a park-and-ride stop for Route 2 and I-190, to a total of 436 spaces.

<span class="mw-page-title-main">Fitchburg Intermodal Transportation Center</span> Regional rail and bus station

The Fitchburg Intermodal Transportation Center is a regional rail and bus station located in downtown Fitchburg, Massachusetts. It is a stop on the MBTA Commuter Rail Fitchburg Line and a hub for Montachusett Regional Transit Authority local and intercity bus routes.

<span class="mw-page-title-main">Union Station (Worcester, Massachusetts)</span> Railway station in Worcester, Massachusetts, US

Union Station is a railway station located at Washington Square in downtown Worcester, Massachusetts. It is the western terminus of the MBTA Commuter Rail Framingham/Worcester Line and a stop for the Amtrak Lake Shore Limited service. A bus terminal adjacent to the station is the hub for Worcester Regional Transit Authority (WRTA) local bus service; it is also used by PVTA, MART, Peter Pan, and Greyhound intercity buses.

<span class="mw-page-title-main">Union Square station (Somerville)</span> Light rail station in Somerville, Massachusetts, US

Union Square station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located in the Union Square neighborhood of southeastern Somerville, Massachusetts. The accessible terminal station has a single island platform serving the two tracks of the Union Square Branch, which parallels the Fitchburg Line. It opened on March 21, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line.

<span class="mw-page-title-main">Gardner station</span> Former train station in Massachusetts

Gardner station is a former station stop on the MBTA Commuter Rail Fitchburg Line, located in Gardner, Massachusetts. Passenger service to Union Station ran from 1851 until 1960, and commuter service also briefly ran from 1980 to 1986. Restoration of passenger service was considered in the early 2000s, but was rejected due to low cost-effectiveness.

References

  1. 1 2 3 4 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  2. 1 2 Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  3. "Railroad". Vermont Temperance Herald. September 7, 1847. p. 2 via Newspapers.com.
  4. Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. p. 87.
  5. 1 2 3 4 Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 163–5, 200, 203. ISBN   0942147022.
  6. 1 2 "Atlas Plate No. 18" (Map). Atlas of Massachusetts. 1:63,360. George H. Walker & Co. 1891. pp. 170–171 via David Rumsey Map Collection.
  7. Heywood, William Sweetzer (1893). History of Westminster Massachusetts (first named Narragansett no. 2) from the date of the original grant of the township to the present time, 1728-1893; with a biographic-genealogical register of its principal families. Lowell, Massachusetts: Vox Populi Press. p. 232.
  8. "Westminster Reconnaissance Report" (PDF). Massachusetts Department of Conservation and Recreation. June 2006. p. 22. Archived from the original (PDF) on May 7, 2019.
  9. "Train Accidents in April". Railway Age Gazette. Vol. 56, no. 23. June 5, 1914. p. 1236 via Google Books.
  10. "Explanatory". Rutland Weekly Herald. December 14, 1865. p. 6 via Newspapers.com.
  11. "GEORGE E. POWERS FREE.: B & M Conductor Who Figured in Wachusett Wreck Pardoned". Boston Daily Globe. October 19, 1906. p. 13 via Newspapers.com. Open Access logo PLoS transparent.svg
  12. Local Train Service. Boston and Maine Railroad. September 30, 1917. pp. 83–89 via Wikimedia Commons.
  13. Time Tables. Boston and Maine Railroad. September 29, 1929. pp. 46–49 via Wikimedia Commons.
  14. Boston and Maine Modern Transportation. Boston and Maine Railroad. May 24, 1942. pp. 34–37 via Wikimedia Commons.
  15. Northern New England Travel Guide. Boston and Maine Railroad. April 28, 1946. pp. 30–35 via Wikimedia Commons.
  16. Massachusetts Bay Transportation Authority (May 16, 1981). "Public Hearing Notice". Boston Globe. p. 46 via Newspapers.com.
  17. Commonwealth of Massachusetts Executive Office of Economic Affairs; United States Department of Agriculture Farm Service Agency, Google Earth aerial imagery, Google Inc. The freight depot is visible in April 29, 2005 imagery but is gone in September 10, 2006 imagery.
  18. "An Act Providing for an Accelerated Transportation Development and Improvement Program for the Massachusetts Bay Transportation Authority". Session Laws: 2000. Massachusetts State Legislature. June 30, 2000. Retrieved July 5, 2015.
  19. Central Transportation Planning Staff (January 2004). "Chapter 5C: Service Expansion" (PDF). 2004 Program for Mass Transportation. Boston Metropolitan Planning Organization. pp. 56–57. Archived from the original (PDF) on July 19, 2011.
  20. McMahon Associates (February 2005). "Fitchburg Commuter Rail Line Service Expansion Study" (PDF). Massachusetts Bay Transportation Authority. pp. 27–28. Archived from the original (PDF) on March 18, 2006.
  21. U.S. Department of Transportation (February 17, 2010). "Transportation Investment Generating Economic Recovery (TIGER) Grants" (PDF). p. 8.
  22. "Massachusetts" (PDF). Atlantic Northeast Rails & Ports. 10 (6B): 10–12. July 1, 2010.
  23. "Patrick-Murray Administration, U.S. Transportation Secretary LaHood, Congressman Olver Kick off Wachusett Commuter Rail Extension Project" (Press release). Massachusetts Bay Transportation Authority. October 18, 2010.
  24. Montachusett Regional Transit Authority. "Fitchburg Commuter Rail Extension Project: Environmental Notification Form" (PDF). Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs. Archived from the original (PDF) on March 6, 2012.
  25. Meeting of the MART Advisory Board: Tentative Agenda (Report). Montachusett Regional Transit Authority. February 16, 2012. Design is at approximately 30% completion for Jacobs and HNTB is expected to complete the 30% track and signal design by late spring... Project completion is expected in October 2013.
  26. 1 2 "MBTA Wachusett Commuter Rail Extension Project". Massachusetts Bay Transportation Authority. Archived from the original on March 15, 2016. Retrieved December 4, 2012.
  27. Owen, Paula J. (March 17, 2012). "Input is sought on smart growth corridor". Worcester Telegram & Gazette. Retrieved March 17, 2012.
  28. Hartwell, Michael (October 3, 2012). "MART to get $3.6M in federal money to extend Wachusett rail line". Sentinel and Enterprise. Retrieved October 4, 2012.
  29. Melanson, Alana (February 7, 2012). "Layover-station critic in Westminster calls for study". Sentinel and Enterprise. Retrieved February 21, 2012.
  30. Owen, Paula J. (December 28, 2012). "Westminster orders MBTA to stop work on station". Worcester Telegram & Gazette. Retrieved December 28, 2012. Selectmen today issued a cease and desist order on alleged unlawful earth removal at the construction site of the proposed Massachusetts Bay Transportation Authority layover station in Westminster Business Park.
  31. Flanagan, Joseph E.; et al. (March 25, 2013), Re: MBTA Wachusett Extension Project (Massachusetts) Award No. MA-78-0002, Town of Westminster
  32. Owen, Paula J. (March 27, 2013). "Littleton train station to have big impact". Worcester Telegram and Gazette. Retrieved March 16, 2016.
  33. 1 2 "Fitchburg Commuter Rail Line Improvement Project: Project Update" (PDF). Massachusetts Bay Transportation Authority. January 2014. p. 16. Archived from the original (PDF) on August 11, 2016.
  34. "Construction Bid Solicitation". Massachusetts Bay Transportation Authority. June 11, 2012. Archived from the original on October 26, 2014. Retrieved June 11, 2012.
  35. "Awarded Contract: D40CN01". Massachusetts Bay Transportation Authority. November 26, 2012. Archived from the original on March 3, 2016. Retrieved December 3, 2012.
  36. 1 2 "Construction Bid Solicitation #D40CN02". Massachusetts Bay Transportation Authority. February 15, 2013. Archived from the original on March 3, 2016. Retrieved February 22, 2013.
  37. Owen, Paula J. (May 23, 2013). "Contract awarded for Westminster layover train station". Worcester Telegram & Gazette. Retrieved May 24, 2013.
  38. 1 2 3 "Fitchburg Commuter Rail Line Improvement Project: Project Update" (PDF). Massachusetts Bay Transportation Authority. January 2015. p. 38. Archived from the original (PDF) on March 3, 2016.
  39. Jessen, Klark (August 12, 2013). "West Fitchburg: New Wachusett Rail Station" (Press release). Massachusetts Department of Transportation. Archived from the original on August 20, 2013. Retrieved August 13, 2013.
  40. 1 2 Petalas, Kimberly (October 24, 2014). "MART announces plan for commuter rail access for Gardner residents". Leominster Champion. Archived from the original on October 26, 2014.
  41. 1 2 Dumcius, Gintautas (July 11, 2016). "Massachusetts spending more on Wachusett commuter rail project to cover delays and remain on-time". Mass Live. Retrieved July 12, 2016.
  42. Montachusett Regional Planning Commission (August 24, 2011). "Transit" (PDF). 2012 Regional Transportation Plan. Montachusett Metropolitan Planning Organization. p. 32. Archived from the original (PDF) on February 7, 2017. Retrieved December 4, 2012.
  43. Barnes, George (February 25, 2017). "Ridership, interest grow at new Fitchburg T station". Worcester Telegram. Retrieved March 21, 2017.
  44. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  45. "Ski Train To Wachusett". Wachusett Mountain Ski Area. 2016. Archived from the original on April 11, 2013. Retrieved December 11, 2016.

Commons-logo.svg Media related to Wachusett station at Wikimedia Commons