Walnut Tree Viaduct

Last updated

Walnut Tree Viaduct
Walnut Tree Viaduct in 1960s (retouched).jpg
The Walnut Tree Viaduct prior to demolition in the 1960s
Coordinates 51°32′14″N3°15′42″W / 51.53722°N 3.26167°W / 51.53722; -3.26167 Coordinates: 51°32′14″N3°15′42″W / 51.53722°N 3.26167°W / 51.53722; -3.26167
Carries Barry Railway
Crosses River Taff
Locale Taffs Well, Cardiff, South Wales
Owner Barry Railway
Great Western Railway
British Railways
Cardiff Council
Preceded byWalnut Tree Tunnel 490 yards (450 m)
Followed byPenrhos Lower Junction
Characteristics
Material Brick columns
Steel lattice girders spans
Total length1,548 feet (472 m)
Height120 feet (37 m)
No. of spans7
History
Architect Sir James Szlumper
DesignerSir James Szlumper
Engineering design bySir James Szlumper
Construction start1901
Construction end1901
Closed1969
Location
Walnut Tree Viaduct

Walnut Tree Viaduct was a railway viaduct located above the southern edge of the village of Taffs Well, South Wales. Originally built to carry the Barry Railway across a narrow gorge through which the River Taff, Taff Vale Railway and Cardiff Railway passed, it was deconstructed in 1969, leaving only two of the support columns visible from the A470 road.

Contents

Background

During the Industrial Revolution, and the mass-extraction of coal from South Wales, there was a resultant growth in construction of railways into the South Wales Coalfield. The Taff Vale Railway so monopolised the trade of shipping coal to Cardiff Docks, that mine owners were desperate for competitor railway companies to both improve speeds of shipping, provide access to new markets, and hence reduce shipping rates.

The first section of the Taff Vale Railway (TVR) to move iron from Merthyr Tydfil to Cardiff Docks opened in 1840, and included Taffs Well railway station. Following 1858, the Rhymney Railway (RR) had connected with the TVR, south of Taffs Well station at Walnut Tree Junction, a name given to the northern area of Radyr village. Almost two miles further south, Radyr station was situated, followed by Penarth Junction, later renamed Radyr Junction.

However, by 1880 the TVR and RVR were so congested with coal traffic, that a group of coal mine owners, iron makers and industrialists led by David Davies of Ocean Collieries, had all suffered from the capacity and monopoly issues created by two companies:

In light of the geographic restrictions of the valley south of Pontypridd, Davies proposed development of a secondary route which terminated at Barry, where a dock infrastructure could be developed without the mud flat or tidal restrictions which gave Cardiff's Tiger Bay its name. This would create a competitive edge to the development, and due to being later developed to a more easily accessible docks, a resultant efficiency advantage over Cardiff.

The Barry Dock and Railway Bill was introduced in the 1883 Parliamentary session but was defeated by opposition, particularly from the Bute Docks and Taff Vale Railway. [1] The Bill was introduced again the following year and the Barry Dock and Railway Company Act was passed on 14 August 1884 for the construction of a dock between Barry and Barry Island. The name was changed to the Barry Railway Company by an Act of 5 August 1891.

Llanbradach branch

By 1889 the main line of the BRC connected Barry Docks to Hafod Junction, on the Taff Vale line, south-east of Trehafod railway station, within the Rhondda Valley. However, Davis also wanted access to the Rhymney Valley and the industrial hub of Dowlais at Merthyr Tydfil, so proposed a direct branch line to Llanbradach from Tynycaeau Junction on the Cadoxton-Trehafod main line.

Having already engineered the main line of the BRC, Chief Engineer Sir James Szlumper proposed that the new Llanbradach branch run from the BRC main line at Tynycaeau Junction near St Fagans, direct to the a junction with the Brecon and Merthyr Railway (BMR) at Llanbradach first known as Barry Junction (BMR) and later, Duffryn Isaf Junction. There would be no stations, allowing the freight trains to run unimpeded at full speed, but taking into account gradients and stopping for pinning down wagon brakes as necessary but hence maximising traffic revenue.

After passing through the Lesser Garth hill via the Walnut Tree Tunnel (490 yards (450 m)), a siding served Dolomite Quarry, before the line curved right to reach the viaduct which bridged the River Taff valley via the congested geographical squeeze-point just north of Radyr, known as Walnut Tree. The height and form of the viaduct at this point not only needed to cope with the congested valley bottom, crossing the River Taff, but also at its north-eastern end, curve onto a shelf of rock on the eastern hillside followed by a deep cutting for ¼ mile. The railway then climbed the eastern hillside to finally route north-east to reach the Rhymney Railway via Penrhos Lower Junction, allowing access to Caerphilly.

The BRC Llanbradach extension continued along the eastern side of the Taff valley, to then span the RR and the TVR via the Penrhos Viaduct, and then the Penyrheol Viaduct. Finally the line circumvented the west side of the town of Caerphilly, and crossed the Rhymney valley north of Energlyn by means of the Llanbradach Viaduct, near Pwll-y-pant, constructed to ease the gradient onto the BMR junction south of Maesycwmmer. The section from Penrhos lower Junction to the Brecon & Merthyr Junction was known as the B&M Extension.

The line from Tynycaeau Junction to Penrhos Junction was officially named the Penrhos Branch by the GWR and Successor BR Western Region and given the Engineer's Line reference PRS. The former Barry Railway's Cadoxton-Trehafod main line was given the ELR, CTD. These abbreviations still hold for remaining structures and land remaining from BR days and now in the care of the Historic Railways Estate/Highways England.

Construction

Facing similar problems to those that Chief Engineer Charles Liddell with the Taff Vale Extension of the Newport, Abergavenny and Hereford Railway (NA&HR) had at the Crumlin Viaduct in spanning the Ebbw River, Szlumper surveyed the earlier structure and came to the same conclusions:

His recommendation therefore like Liddell to the board of the BRC was for steel lattice girders spans, set atop brick-built supporting columns. The final structure, which took less than 12 months to build, opened in 1901. [2] At its maximum 120 feet (37 m) high, the seven spans created a structure of 1,548 feet (472 m) long, which curved slightly at its western end to enable the line to bend onto the rock shelf. [3]

Closure and demolition

Residual brick support of the Walnut Tree Viaduct, decorated in honour of the Queen's Silver Jubilee, 1977 Remains of railway viaduct - geograph.org.uk - 514531.jpg
Residual brick support of the Walnut Tree Viaduct, decorated in honour of the Queen's Silver Jubilee, 1977

The Llanbradach branch (or B&M Extension) enjoyed a short but productive life north of Penrhos Lower Junction as it was de-commissioned by the later owning Great Western Railway in the early 1930s, with all three viaducts on that section removed and sold for scrap by the end of 1937. Today, all that remains is a single brick arch towards the western end of where the Llanbradach Viaduct was sited. A short section of track bed remains near Energlyn, while the rest of the trackbed was incorporated into the A468 road Caerphilly bypass.

Later renamed the 'Penrhos Branch' by the GWR, post-nationalisation it came under the control of British Railways. On 31 March 1963, a fire destroyed Tynycaeau Junction signal box and BR decided not to rebuild it, and hence the Penrhos Branch section from the Walnut Tree tunnel southwards to Tynycaeau Junction was maintained as its original double track but given 'long siding' status and as Steetley Dolomite workings had always necessitated a run-round by the steam locomotive, which could not be performed at the Walnut Tree West rail connection due to the permanent way layout, the loco' had to travel 'light engine' for a round trip of 7¼ miles by running to Tynycaeau Junction and crossing over from down to up line near the former junction with the Cadoxton-Wenvoe-Pontypridd line. With the signal box out of action at Tynycaeau, the crossover was modified to sprung points from down to up line. Eventually even that section was curtailed and sleeper stops placed on both lines at the Walnut Tree tunnel north portal. [4] The double track south of Walnut Tree tunnel had been lifted by August 1965. The remaining branch was later worked as a single-track long siding from Penrhos to the Steetley Dolomite limestone quarry, just south of the viaduct, the permanent way layout having been modified. [5] The last train to the quarry ran over the viaduct in 1967. [6] The remaining permanent way to Penrhos yard and Junction was not lifted until the decommissioning of the whole line in 1969. By the late 1990s the tunnel was gated and by the year 2000 the quarry had breached the tunnel lining, leaving a 50 yards (46 m) air gap in its structure. [4]

After Welsh Office and Cardiff Council approved the dual carriageway improvement to the A470 road, British Railways agreed to close the remaining line, [7] with two of the Walnut Tree Viaduct brick pillars in direct alignment of the road improvement. After dominating the southern end of Taffs Well for nearly 70 years, contractors started demolition of the Walnut Tree Viaduct in 1969. [3] [6] Delayed by the need to demolish all but one of the piers and one pillar by hand due to the congested valley bottom, by 1974 they had finished their work. [3]

Today

Only the Walnut Tree tunnel abutment, an angled pillar and Taff Bank pier remain, all visible from the village and the A470. The Taff Bank pier was used in 1977 for displaying a message commemorating the Silver Jubilee of Elizabeth II, with the wording still visible today. Parts of the remaining track bed are now incorporated into the Taff Trail. [8]

Related Research Articles

<span class="mw-page-title-main">Taff Vale Railway</span> Railway company and line in South Wales

The Taff Vale Railway (TVR) was a standard gauge railway in South Wales, built by the Taff Vale Railway Company to serve the iron and coal industries around Merthyr Tydfil and to connect them with docks in Cardiff. It was opened in stages in 1840 and 1841.

<span class="mw-page-title-main">Cardiff Railway</span>

From 1839 the Trustees of the Marquis of Bute, operated a large dock operation in Cardiff, the "Bute Docks". This was very successful, but was overwhelmed by the huge volume of coal exported through Cardiff. At the same time it was seen that railway companies, especially the Taff Vale Railway (TVR), were making money conveying the coal to the docks.

The Rhymney Railway was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition.

The Brecon and Merthyr Tydfil Junction Railway (B&MR) was a railway company in Wales. It was originally intended to link the towns in its name. Finding its access to Merthyr difficult at first, it acquired the Rumney Railway, an old plateway, and this gave it access to Newport docks. This changed its emphasis from rural line to mineral artery.

<span class="mw-page-title-main">Grangetown railway station</span> Railway station in Cardiff, Wales

Grangetown railway station is a railway station serving the Grangetown district of Cardiff, Wales. It is located on the Vale of Glamorgan Line 1 mile (1.5 km) south west of Cardiff Central towards Bridgend via Barry, Penarth and Barry Island.

<span class="mw-page-title-main">Taffs Well railway station</span> Railway station in Rhondda Cynon Taf, Wales

Taffs Well railway station is a railway station serving the village of Taff's Well, Rhondda Cynon Taf, Wales, as well as neighbouring Gwaelod-y-Garth, Cardiff. It is located on the Merthyr Line and the Rhondda Line. Passenger services are provided by Transport for Wales.

<span class="mw-page-title-main">Eastbrook railway station</span> Railway station in the Vale of Glamorgan, Wales

Eastbrook railway station is a railway station serving the Eastbrook area of Dinas Powys, a village near Cardiff, South Wales. It is located on Network Rail's Barry Branch 3+12 miles (5.6 km) south of Cardiff Central towards Barry Island and Bridgend.

<span class="mw-page-title-main">Rhymney railway station</span> Railway station in Caerphilly, Wales

Rhymney railway station serves the town of Rhymney in Wales. Situated on the Valley Lines network 23 miles (37 km) north of Cardiff Central, it is the terminus of the Rhymney Line. The station has sidings to the west of its single platform which are used for the overnight stabling of the diesel multiple unit trains

<span class="mw-page-title-main">Cadoxton railway station</span> Railway station in the Vale of Glamorgan, Wales

Cadoxton railway station is a railway station serving Cadoxton and Palmerstown near Barry, Vale of Glamorgan, South Wales. It is located on the Barry Branch 6½ miles (10 km) south of Cardiff Central. The line continues to the terminus of the Barry Branch at Barry Island but from Barry Junction the line also continues as the Vale of Glamorgan branch to Bridgend via Rhoose for Cardiff International Airport bus link and then Llantwit Major.

<span class="mw-page-title-main">Trehafod railway station</span> Railway station in Rhondda Cynon Taf, Wales

Trehafod railway station is a railway station serving the township of Trehafod in Rhondda Cynon Taf, Wales. It is located on the Rhondda Line.

<span class="mw-page-title-main">Aber railway station</span> Railway station in Caerphilly, Wales

Aber railway station is a railway station serving the town of Caerphilly, south Wales. It is a stop on the Rhymney Line 8+14 miles (13.3 km) north of Cardiff Central on the Valley Lines network.

<span class="mw-page-title-main">Caerphilly railway station</span> Railway station in Caerphilly, Wales

Caerphilly railway station is a railway station serving the town of Caerphilly, south Wales. It is a stop on the Rhymney Line of the Valley Lines network. The station is located at Station Road in the south of the town. Facilities include a small shop and a ticket kiosk. A self-service ticket machine was installed near the entrance to the station on 22 December 2008. Several advertising murals depicting holiday travel in various parts of South Wales have been placed on the northbound side of the station in order to improve the 'look' of the station.

<span class="mw-page-title-main">Barry Railway Company</span> Former railway and docks company in South Wales

The Barry Railway Company was a railway and docks company in South Wales, first incorporated as the Barry Dock and Railway Company in 1884. It arose out of frustration among Rhondda coal owners at congestion and high charges at Cardiff Docks as well the monopoly held by the Taff Vale Railway in transporting coal from the Rhondda. In addition, the Taff Vale did not have the required capacity for the mineral traffic using the route, leading to lengthy delays in getting to Cardiff.

The Pontypridd, Caerphilly and Newport Railway was built to bring the coal output of the Aberdare and Rhondda valleys directly to Alexandra Docks at Newport.

<span class="mw-page-title-main">Llanbradach</span> Human settlement in Wales

Llanbradach is a village within the historic boundaries of Glamorgan, South Wales less than three miles north of the town of Caerphilly. It is part of the community of Llanbradach and Pwll-y-Pant.

The Llantrisant and Taff Vale Junction Railway was a railway company that constructed a standard gauge line in South Wales, connecting Llantrisant and the Taff Vale Railway near Treforest. It ran through thinly populated country, and linked to a number of iron mines, collieries and other mineral sites. It opened in stages in 1863 and 1864. In 1865 through passenger trains from the Cowbridge Railway ran over the line, to Pontypridd, although for some time there were no passenger stations on its own network. At the Llantrisant end, it was reliant on broad gauge railway companies which were not always friendly to it. The company leased its line to the Taff Vale Railway in 1870.

Rail transport in Cardiff has developed to provide connections to many other major cities in the United Kingdom, and to provide an urban rail network for the city and its commuter towns in southeast Wales. Today, there are three train operating companies in Cardiff: Great Western Railway, CrossCountry and Transport for Wales.

<span class="mw-page-title-main">Hengoed Viaduct</span> Multi-arched railway viaduct over a river

Hengoed Viaduct is a disused railway viaduct located above the village of Maesycwmmer, in Caerphilly county borough, South Wales. Grade II* listed, it was originally built to carry the Taff Vale Extension of the Newport, Abergavenny and Hereford Railway (NA&HR) across the Rhymney River, and is now part of National Cycle Route 47.

<span class="mw-page-title-main">Wenvoe Tunnel</span> Disused tunnel on the defunct Barry Railway

Wenvoe Tunnel is a disused tunnel on the defunct Barry Railway that runs under Culverhouse Cross in the Vale of Glamorgan in south Wales, on the western outskirts of Cardiff. It was opened in 1889 on a line used to carry coal to Barry Docks. The line also had a sparse passenger service and closed after March 1963.

References

  1. Watson, Richard. "The Birth of Barry – When Coal was King 2". Legacies - South East Wales. BBC. Retrieved 12 January 2009.
  2. The Courtney Haydon Collection. "Walnut Tree Viaduct". THE RAILWAY CORRESPONDENCE AND TRAVEL SOCIETY. Retrieved 28 December 2012.
  3. 1 2 3 "Taffs Well". Rhondda-Cynon-Taf.gov.uk. Retrieved 28 December 2012.
  4. 1 2 "Walnut Tree Tunnel". forgottenrelics.co.uk. Retrieved 28 December 2012.
  5. "Penrhos Branch". trackbed.com. Retrieved 28 December 2012.
  6. 1 2 John Wiltshire (29 September 1969). "Demolition of Walnut Tree Viaduct". John Wiltshire. Retrieved 28 December 2012.
  7. "Walnut Tree Viaduct". wikimapia.org. Retrieved 28 December 2012.
  8. "Llanbradach Viaduct". Caerphilly.gov.uk. Retrieved 28 December 2012.