Crumlin Viaduct

Last updated

Crumlin Viaduct
Crumlin Viaduct from A472 geograph-2986887-by-Ben-Brooksbank.jpg
Crumlin Viaduct in 1957
Coordinates 51°40′49″N3°08′23″W / 51.6804°N 3.1396°W / 51.6804; -3.1396
Carries Taff Vale Extension
Crosses Ebbw River
Locale Monmouthshire
Owner Newport, Abergavenny and Hereford Railway
British Railways
Characteristics
Material Wrought iron, stone pillars and supports
Total length1,650 ft (502.9 m) (1,066 ft (324.9 m) + 584 ft (178.0 m))
Height200 feet (61 m)
Highest railway viaduct in the United Kingdom throughout its working life
Longest span150 feet (46 m)
No. of spans7 (Ebbw) + 3 (Kendon)
History
Architect Charles Liddell
Designer Thomas W. Kennard
Engineering design by Falkirk Iron Co
Fabrication by Falkirk Iron Co
Construction start1853
Construction end1857
Construction cost£62,000 (£41 7s per foot) [1] (£6.262m at 2014 prices) [2]
Opened1 June 1857
Closed1964
Location
Crumlin Viaduct
The viaduct passing over Crumlin Low Level Station Crumlin (Low Level) station and Crumlin Viaduct geograph-2986824-by-Ben-Brooksbank.jpg
The viaduct passing over Crumlin Low Level Station

The Crumlin Viaduct was a railway viaduct located above the village of Crumlin in South Wales, originally built to carry the Taff Vale Extension of the Newport, Abergavenny and Hereford Railway (NA&HR) across the Ebbw River.

Contents

Hailed as "one of the most significant examples of technological achievement during the Industrial Revolution", [3] [4] in its 107 years of service until being dismantled in 1965, it remained: the least expensive bridge for its size ever constructed; the tallest railway viaduct in the United Kingdom; [3] the third tallest viaduct in the world, after the aqueduct at Spoleto, Italy, and the timber viaduct in Portage, New York state. [3]

Background

During the Industrial Revolution, and the mass-extraction of coal from South Wales, there was a resultant growth in construction of railways into the South Wales Coalfield. The Taff Vale Railway so monopolised the trade of shipping coal to Cardiff Docks, that mine owners were desperate for competitor railway companies to both improve speeds of shipping, provide access to new markets, and hence reduce shipping rates.

The London and North Western Railway had developed a route for the industrialised West Midlands and Northwest England, by controlling the Llanfihangel Railway and the Grosmont Railways as feeder lines into the Hereford Railway, and hence onwards via the joint GWR/LNWR controlled Shrewsbury and Hereford Railway. This allowed shipment of goods from Pontypool and the Ebbw Valley to Hereford. However, access to the productive Rhymney Valley and Rhondda Valley coalfields was at best restricted, through having to route trains south to Cardiff along the TVR, then along the South Wales Railway to Newport via the GWR, before being able to access LNWR controlled track.

The UK Parliament approved an Act of Parliament on 3 August 1846, the construction of the Taff Vale Extension, which would connect Coedygric North Junction at Pontypool with the TVR/GWR at Quakers Yard, and hence allow direct and LNWR controlled access. The LNWR approved the required capital expenditure, and merged the existing three railways and the extension project in the new Newport, Abergavenny and Hereford Railway.

Construction

The route for the Taff Vale Extension required the construction of two significant viaducts across two major river valleys: one across the Ebbw River; and one across the Rhymney River, the Hengoed Viaduct.

The Ebbw Valley posed two significant challenges through its geography: [5]

Chief Engineer Charles Liddell concluded that stone would be a poor choice for construction of a suitable bridge, as additional stone would need to be shipped to the valley, and the height of the resulting structure would result in an unstable and high-maintenance bridge. Further, the solidity of a stone structure would create additional compressed wind flow around the rail tracks, resulting in a possible safety hazard for passengers and train crew. Overall, the required over-engineered result would also have been very expensive. His recommendation therefore to the board was for a cast iron structure. [5]

Two tender responses were received by August 1852, with Liddell's recommendation for a design by Scottish civil engineer Thomas W. Kennard, using an amended design using the Warren truss. [6] [7] Contracts were signed in December 1852, with a stipulated completion date of 1 October 1857. After further experimentation of his design system at his father's Blaenavon Ironworks, the iron structures were cast at Kennard's Falkirk Ironworks and shipped to Newport Docks. [3]

Kennard began construction in October 1853 by building the Crumlin Viaduct Works on the east bank. Here castings from Falkirk were brought together with wrought iron from Blaenavon, and all fitting and fabrication work took place. After shortening the spur from the Monmouthshire and Brecon Canal, and with the natural land between the two valleys acting as the ninth pier, the first girder was hoisted into place on 3 December 1854. [3] The completed structure linking Pontypool Clarence Street railway station in the north via the Bryn Tunnel (398 yards (364 m)) to the viaduct east end, came by the end of May 1857. [5]

Testing began that same month, in front of the Board of Trade Inspector, Colonel Wynne. Six locomotives loaded with pig iron or lead weighing a total of 370 long tons (380 t) were placed in charge of locomotive driver "Mad Jack" of Pontypool, who before making his first crossing had visited every public house in Crumlin. Mad Jack was actually John Thomas Jenkins, a locomotive driver born in 1821. He raced across the viaduct despite being told to go slowly. Upon completing the crossing he told the angry engineer "when eternity looks you straight in the face, you may as well go at full speed to meet it!" He died at 65 still in service with London and North Western Railways. After a series of tests, during which a deflection of less than 1.5 inches (38 mm) was measured, the bridge was approved for use in the same month. [3]

Operations

Lithograph 1860 Crumlin Viaduct - on the Newport, Abergavenny & Hereford Railway Extension to Taff Vale.jpeg
Lithograph 1860

The viaduct was opened on Whit Monday, 1 June 1857 by Lady Isabella Fitzmaurice, with the first train crossing the bridge and entering the Bryn Tunnel in June 1854, [5] but it could not proceed further as Kennard's construction team had not yet finished the Hengoed Viaduct, which he had won the contract to design and act as civil engineer on. The final Crumlin viaduct, at 200 feet (61 m) high and 1,650 feet (500 m) across its two spans and ten trusses in length (1,066 feet (325 m) and 584 feet (178 m)), remained the highest railway viaduct in Great Britain throughout its working life. Nearby were the Crumlin railway stations, both at high (viaduct) and valley levels.

As Liddell predicted, the location proved to be susceptible to high winds and resultant swaying, resulting in continual expensive maintenance. The NA&HR route, due to a combination of its height and steepness, proved to be one of the most expensive railway lines in all of the UK to operate. It was therefore no surprise when, following the post-World War II nationalisation, British Railways reduced the entire extension line to single track after 1947.

Closure and demolition

As a result of the Beeching Axe, the last booked westbound scheduled passenger train ran over the viaduct on Saturday 13 June 1964, the 8.55pm from Pontypool Road to Aberdare (High Level), arriving at 10.09pm, which was booked to stop at Crumlin (High Level) at 9.20pm. The very last eastbound train over the Vale of Neath line was the 8.45pm from Neath (General) to Aberdare (High Level) which on Saturdays was extended from Aberdare to Pontypool Road arriving there at 11.18pm, calling at Crumlin (High Level) at 10.54pm. but apparently ran only as far as Aberdare on that date.

Preservation of the historic viaduct was discussed, and the structure was scheduled as being of architectural and historical interest by the Ministry of Housing and Local Government. [3] But while the stone Hengoed Viaduct survived, a structural survey of the cast iron Crumlin Viaduct showed its poor state, and resultant need for high investment to secure its future, let alone ongoing maintenance costs. The decision was therefore made to dismantle it because, by then, housing had extended into the lower valley area. [5]

In the period between closure of the NA&HR and dismantling operation beginning, scenes for the Universal Pictures film Arabesque , which starred Sophia Loren and Gregory Peck, were shot both on and around the viaduct. Its demolition, by Bird's of Swansea, began in June 1965 and took nine months, with the help of a Bailey bridge. [3]

The iron parts of the bridge had been completely dismantled by the end of 1967, and only the stone and cast concrete abutments now remain visible on the valley sides. [3] [5]

The abutments are visible at: 51°40′51.19″N3°08′14.55″W / 51.6808861°N 3.1373750°W / 51.6808861; -3.1373750 , 51°40′47.48″N3°08′30.07″W / 51.6798556°N 3.1416861°W / 51.6798556; -3.1416861 & 51°40′44.16″N3°08′36.79″W / 51.6789333°N 3.1435528°W / 51.6789333; -3.1435528

Related Research Articles

<span class="mw-page-title-main">Taff Vale Railway</span> Railway company and line in South Wales

The Taff Vale Railway (TVR) was a standard gauge railway in South Wales, built by the Taff Vale Railway Company to serve the iron and coal industries around Merthyr Tydfil and to connect them with docks in Cardiff. It was opened in stages in 1840 and 1841.

<span class="mw-page-title-main">Crumlin, Caerphilly</span> Human settlement in Wales

Crumlin is a town, community and electoral ward in Caerphilly county borough in South Wales. It is situated in the Ebbw River valley, 5 miles (8.0 km) west of Pontypool, within the historic boundaries of Monmouthshire.

The Rhymney Railway (RR) was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition.

<span class="mw-page-title-main">Hengoed railway station</span> Railway station in Caerphilly, Wales

Hengoed railway station serves the village of Hengoed in the county borough of Caerphilly, South Wales. It is a stop on the Rhymney Line of the Valley Lines network.

<span class="mw-page-title-main">Pontypool and New Inn railway station</span> Railway station in Torfaen, Wales

Pontypool and New Inn railway station is situated to the south east of Pontypool town centre between the town and the suburb of New Inn, Wales. The station was formerly called Pontypool Road until renamed just Pontypool in 1972 and then to the present name in 1994.

<span class="mw-page-title-main">Crumlin railway station (Wales)</span> Disused railway stations in Crumlin, Caerphilly

The Crumlin railway stations historically served the town of Crumlin, South Wales. Both stations are now closed and no longer exist.

<span class="mw-page-title-main">Maesycwmmer</span> Human settlement in Wales

Maesycwmmer is a village and community in the centre of Caerphilly County Borough in Wales, within the historic boundaries of Monmouthshire.

The Vale of Neath Railway (VoNR) was a broad gauge railway company, that built a line from Merthyr Tydfil and Aberdare to Neath, in Wales, mostly to transport the products of the Merthyr iron industries to ports on Swansea Bay.

The Pontypool, Caerleon & Newport Railway was promoted independently to relieve congestion on the heavily worked Eastern Valley Line of the Monmouthshire Railway and Canal Company. The Great Western Railway put up half the capital, making it in effect a GWR subsidiary. It opened in 1874, and most long-distance passenger and goods traffic, especially the heavy mineral traffic, transferred to it. It amalgamated with the GWR in 1876.

The Pontypridd, Caerphilly and Newport Railway was built to bring the coal output of the Aberdare and Rhondda valleys directly to Alexandra Docks at Newport.

The Merthyr, Tredegar and Abergavenny Railway, also known as the Heads of the Valleys line, was a railway line which operated between 1860 and 1958 between the Monmouthshire town of Abergavenny and the Glamorgan town of Merthyr Tydfil in South East Wales.

The Newport, Abergavenny and Hereford Railway was a railway company formed to connect the places in its name. When it sought Parliamentary authorisation, it was denied the southern section, and obliged to use the Monmouthshire Railway between Pontypool and Newport.

The Monmouthshire Railway and Canal Company was a canal and railway company that operated a canal and a network of railways in the Western Valley and Eastern Valley of Newport, Monmouthshire. It started as the Monmouthshire Canal Navigation and opened canals from Newport to Pontypool and to Crumlin from 1796. Numerous tramroads connected nearby pits and ironworks with the canal.

<span class="mw-page-title-main">Hafodyrynys</span> Human settlement in Wales

Hafodyrynys is a village on the A472 road between Pontypool and Crumlin in Caerphilly county borough, south-east Wales. It lies within the historic boundaries of Monmouthshire.

The Llancaiach Branch railway line was a mineral branch line in Glamorganshire, South Wales. It was authorised in 1836 as part of the Taff Vale Railway, and its purpose was to connect collieries at Llancaiach and bring their output to Cardiff for onward shipment. It was designed by Isambard Kingdom Brunel and built on the standard gauge. It opened in 1841 from a junction with the Merthyr line immediately south of Abercynon. It was intended to be horse worked, and included a self-acting rope-worked inclined plane near the junction. The collieries were slow to use the line, preferring their customary use of a tramroad and the Glamorganshire Canal, and the value of the line was diminished when the Taff Vale Extension line, an east-west connecting line belonging to the Newport, Abergavenny and Hereford Railway, intersected it and cut off the colliery connections, and the line became dormant.

<span class="mw-page-title-main">Coleford, Monmouth, Usk and Pontypool Railway</span> Railway in Monmouthshire, Wales

The Coleford, Monmouth, Usk & Pontypool Railway (CMU&PR) was a standard gauge railway of 16 miles (26 km) which ran from Monmouth to Little Mill, near Pontypool in Monmouthshire, Wales. It was intended to convey the mineral products of the Forest of Dean to the ironworks of South Wales, by connecting to the Newport, Abergavenny and Hereford Railway at Little Mill Junction. The NAHR made the onward connection over its Taff Vale Extension line. The CMU&PR intended to acquire the Monmouth Railway, actually a horse-operated plateway, and convert it to locomotive operation.

The Sirhowy Tramroad was a plateway built to convey the products of ironworks at Tredegar to Newport, South Wales. It opened in 1805 between Tredegar and Nine Mile Point, a location west of Risca, from where the Monmouthshire Canal Company operated a tramroad to Newport. The Sirhowy Tramroad was operated at first by horse traction, but early locomotives were used, and a passenger service was operated.

<span class="mw-page-title-main">Hengoed Viaduct</span> Multi-arched railway viaduct over a river

Hengoed Viaduct is a disused railway viaduct located above the village of Maesycwmmer, in Caerphilly county borough, South Wales. Grade II* listed, it was originally built to carry the Taff Vale Extension of the Newport, Abergavenny and Hereford Railway (NA&HR) across the Rhymney River, and is now part of National Cycle Route 47.

<span class="mw-page-title-main">Walnut Tree Viaduct</span> Bridge in Cardiff, South Wales

Walnut Tree Viaduct was a railway viaduct located above the southern edge of the village of Taffs Well, South Wales. Originally built to carry the Barry Railway across a narrow gorge through which the River Taff, Taff Vale Railway and Cardiff Railway passed, it was deconstructed in 1969, leaving only two of the support columns visible from the A470 road.

Pontypool Clarence Street railway station was a station on the former Taff Vale Extension (TVE) of the Newport, Abergavenny and Hereford Railway. The TVE was opened in 1857 to link up with the Taff Vale Railway (TVR) at Quakers Yard which connected onto Merthyr Tydfil. A major achievement of this railway was the building of the Crumlin Viaduct over the Ebbw River. The TVE linked directly with the Vale of Neath Railway at Merthyr and further linked Pontypool to Swansea and Neath. The main purpose of this line was the transport of coal across the country.

References

  1. Railway Magazine September 1957 pp. 647-649
  2. Bank of England inflation calculator
  3. 1 2 3 4 5 6 7 8 9 "Crumlin Viaduct". caerphilly.gov.uk. Retrieved 5 October 2011.
  4. "Crumlin Viaduct". RIBA. Archived from the original on 19 August 2012. Retrieved 5 October 2011.
  5. 1 2 3 4 5 6 "History". crumlinviaduct.co.uk. Retrieved 5 October 2011.
  6. Smith, Martin (1994). British Railway Bridges and Viaducts. Ian Allan. pp. 64–66. ISBN   0711022739.
  7. Jones, Stephen K. (2009). Brunel in South Wales. Vol. III: Links with Leviathans. Stroud: The History Press. pp. 20–21. ISBN   9780752449128.