Walton water treatment works

Last updated
Walton water treatment works
Industrial sector(s)Utilities (water supply)
Main technologies or sub-processesRapid and slow sand filters, flocculation, dissolved air flotation, chlorination, ozonation, activated carbon filtration
FeedstockRaw water
Product(s)Potable water
Leading companiesMetropolitan Water Board (1902-1974), Thames Water Authority (1974-89), Thames Water (1989-date)
Main facilitiesWater purification
InventorHenry Stilgoe (engineering)
Year of invention1907-date

The Walton water treatment works are an advanced purification works supplied with raw water and producing and delivering potable water to the locality and into the Thames Water ring main. The Walton water treatment works were initially built in 1907 north of the Bessborough and Knight reservoirs which supply the water works.

Contents

History

Walton water works (51°24'20"N 0°23'58"W) were built in conjunction with the Knight and Bessborough reservoirs, and was commissioned in 1907. The treatment in 1907 comprised slow sand filters. Workers laying sand in a sand filter bed in 1909 are shown in an image in the Thames Water Archives. [1]

Treatment plant 1925

To meet growing demand a large self-contained double filtration plant was built at the Walton works in 1925. [2] This was designed by the Metropolitan Water Board’s Chief Engineer Henry E. Stilgoe (1867-1943). The Walton plant followed a smaller plant constructed at Barn Elms water works in 1922. Raw water from the Knight and Bessborough reservoirs was passed rapidly through the primary filter beds containing coarse sand to remove suspended solids. [2] Filtered water then flowed to the main filters. The main filters consisted of a tank about a 0.5 ha in area, with a depth of about 3 m. They were constructed of concrete and brick with a floor of perforated tiles forming a network of under-drains leading to the main collecting drains. Above the tiles was a 30 cm layer of gravel, with the coarser material at the bottom, and above that a 60 cm layer of fine sand. The water percolates through the sand at a rate of 10 cm an hour, gradually leaving a fine film of sediment. [2]

The rapid primary filters were cleaned by an upward passage of compressed air and clean water. The compressed air broke up the surface deposit, and the water carried it away. To clean the main filter beds all the water was drained out, and the layer of sediment, with some 2 cm of sand under it, was scraped off manually. [1] This is passed to a sand washer, where a flow of running water breaks up and separates the material, leaving the sand clean and ready for further use. [2]

Following successful operation at Walton, similar two stage filtration plants were built at Kempton Park and Stoke Newington. [2]

The layout of the works in 1926 are shown in a series of ‘Britain from Above’ aerial images. [3] [4]

Other facilities

A riverside wharf was located at Walton water works for unloading coal and sand from barges. There was an electric crane with a capacity of 2 tonnes and a radius of 13.6 m. [2]

By 1933 the works comprised six slow sand filters each 220 ft by 170 ft (67 m by 52 m) located west of the reservoir intake channel, and rapid gravity to the east of the channel. [5]

Further plant was built as the demand for water grew. More filter beds were added in 1950 west of the pump house. When the Queen Elizabeth II reservoir was commissioned in 1962 it also supplied raw water to the Walton treatment works.

By the 1980s the treatment facilities still comprised rapid gravity filters followed by slow sand filters. The plant had a maximum treatment capacity of 135 Ml/day. [6]

New water treatments

Seasonal algal growth in the reservoirs led to problems with the primary filters at the water treatment works. [7] Algae reduced the run time of the filters to just a few hours before backwashing was required. [7] One technique to deal with the problem was to use Co-current Dissolved Air Flotation. This entailed the addition of ferric sulphate to the water stream to create a floc in a reaction with the moderately hard water which captured suspended solids such as algae. This was followed by dissolved air flotation which caused the floc/algae to rise and which was removed mechanically. The disadvantages of the process were the 20-30 minutes of flocculation time required which increase the footprint of the plant and the energy cost of mechanical flocculation and sludge scraping. [7]

In 1990 a pilot plant was installed to improve the water treatment at times of high algal growth. [8] The plant used a combination of ozoflotation with filtration. It proved to be successful in treating algal growth which causes taste and odour problems. The success led to the construction of a larger scale plant at Kempton Park water treatment works. [8]

In 1992 Thames Water installed a 1.4 Ml/day pilot plant at Kempton Water Treatment Centre. [7] This comprised a system based on Counter Current Dissolved Air Flotation and Filtration (CoCo-DAFF). After ferric sulphate dosing the water entered a baffled hydraulic flocculator with 7 – 17 passes and a contact time of about 15 minutes. The water then entered the top of the filter vessel and flowed down through an upwards flow of fine bubbles forming a deep air blanket to capture suspended solids. Water flowed down through a dual media filter at the base of the vessel. The air blanket was formed by recycling water saturated with compressed air injected through a ‘Thames DAF nozzle’ located at about half of the vessels height. [7]

Current plant

The pilot plant was successful and a full scale 200 Ml/day plant was constructed in the late 1990s at the Walton advanced water treatment works using the CoCoDAFF system. This comprised two flocculators each providing a nominal 15 minutes of hydraulic flocculation. Water is then fed to 12 CoCoDAFF units with a capacity of 10 m/h. The filters are dual media units with 600 mm of sand (0.6–1.18 mm) upon 600 mm of (No.2) anthracite. The filters are washed with an air/water mixture. After treatment in the CoCoDAFF water passes through post-ozone and granular activated carbon (GAC) contactors then through slow sand filters before disinfection where sodium hypochlorite is introduced to contact tanks. [9] The water processing stages are summarised in the following table. [10]

Walton advanced water treatment plant – processes
PlantMaterial additionResidence time (minutes)
Pre-ozone contactorOzone30–60
Static flocculationCoagulants5
CoCoDAFFAir30
Main ozone contactorsOzone15–20
Granular Activated  Carbon20
Screens
Disinfectant contact tankSodium hypochlorite30

When the feed water quality is good the flocculators are bypassed and the CoCoDAFF units are operated in contact filtration mode. [10]

After the disinfectant contact tank water is then pumped to the distribution system. Walton it is one of five water treatment works that supply the Thames Water Ring Main.

Other developments

The reservoirs to the east of the works were abandoned and used for gravel extractions. They are now the Molesey Reservoirs Nature Reserve. [11]

The Eels (England and Wales) Regulations 2009 (No. 3344) [12] aims to protect and conserve the population of eels in the rivers of England and Wales. [13] The abstraction point for Walton Advanced Water Treatment Works removed a maximum of 900 Ml/d of water from the Thames. Thames Water was required to undertake the Walton Eel Screens Project to prevent eels and elvers being drawn into the abstraction works. The screens were installed in 2016–17. [14]

The former filter beds were decommissioned. The site currently has an array of solar panels. [15]

See also

Related Research Articles

<span class="mw-page-title-main">Hampton, London</span> Human settlement in England

Hampton is a suburban area on the north bank of the River Thames, in the London Borough of Richmond upon Thames, England, and historically in the County of Middlesex. which includes Hampton Court Palace. Hampton is served by three railway stations, including one immediately south of Hampton Court Bridge in East Molesey.

<span class="mw-page-title-main">Water purification</span> Process of removing impurities from water

Water purification is the process of removing undesirable chemicals, biological contaminants, suspended solids, and gases from water. The goal is to produce water that is fit for specific purposes. Most water is purified and disinfected for human consumption, but water purification may also be carried out for a variety of other purposes, including medical, pharmacological, chemical, and industrial applications. The history of water purification includes a wide variety of methods. The methods used include physical processes such as filtration, sedimentation, and distillation; biological processes such as slow sand filters or biologically active carbon; chemical processes such as flocculation and chlorination; and the use of electromagnetic radiation such as ultraviolet light.

In the oil industry, waterflooding or water injection is where water is injected into the oil reservoir, to maintain the pressure, or to drive oil towards the wells, and thereby increase production. Water injection wells may be located on- and offshore, to increase oil recovery from an existing reservoir.

<span class="mw-page-title-main">Slow sand filter</span> Water purification device

Slow sand filters are used in water purification for treating raw water to produce a potable product. They are typically 1–2 m (3.3–6.6 ft) deep, can be rectangular or cylindrical in cross section and are used primarily to treat surface water. The length and breadth of the tanks are determined by the flow rate desired by the filters, which typically have a loading rate of 200–400 litres (0.20–0.40 m3) per square metre per hour.

<span class="mw-page-title-main">Sand filter</span> Water filtration device

Sand filters are used as a step in the water treatment process of water purification.

<span class="mw-page-title-main">Rapid sand filter</span>

The rapid sand filter or rapid gravity filter is a type of filter used in water purification and is commonly used in municipal drinking water facilities as part of a multiple-stage treatment system. These systems are complex and expensive to operate and maintain, and therefore less suitable for small communities and developing nations.

<span class="mw-page-title-main">Staines Reservoirs</span> Storage reservoirs in the United Kingdom

The Staines Reservoirs are two large pumped storage reservoirs sitting to the east of the King George VI Reservoir near Heathrow airport in Surrey within the Colne Valley regional park. The village of Stanwell is mainly to the north east, and the town of Staines is to the south.

<span class="mw-page-title-main">Molesey Reservoirs</span>

The Molesey Reservoirs were a group of reservoirs in England near Molesey, Surrey, in the western suburbs of London. There was an adjacent water treatment works.

<span class="mw-page-title-main">Stain Hill Reservoirs</span>

The Stain Hill Reservoirs in London, England with embankments occupy 0.175 square kilometres. They are a pair which sit high between others; Kempton Nature Reserve; riverside houses in Sunbury-on-Thames; and a low area of flood meadow to the west alongside the closing stretch of the Port Lane Brook. Other nearby settlements are Molesey, Hampton and Hanworth.

<span class="mw-page-title-main">Bessborough Reservoir</span> Reservoir in Surrey

The Bessborough Reservoir is an embanked storage reservoir south of the River Thames in Surrey adjacent to the Knight Reservoir. To the south lies Queen Elizabeth II Reservoir and to the north the now disused Molesey Reservoirs. The A3050 runs to the north of the reservoir and the neighbouring town is Molesey to the east. It forms part the green buffer between Molesey and Walton on Thames. The reservoir is in the borough of Elmbridge.

<span class="mw-page-title-main">Knight Reservoir</span> Reservoir in Surrey

The Knight Reservoir is a large pumped storage reservoir located in the Borough of Elmbridge in Surrey. It was inaugurated in 1907 and stores up to 2,180 million litres of raw water abstracted from the River Thames prior to its treatment and supply to London and north Surrey. It is located south of the River Thames, west of West Molesey, and between Hurst Road (A3050) and Walton Road (B369). It is adjacent to, and west of, its twin Bessborough Reservoir.

<span class="mw-page-title-main">Island Barn Reservoir</span> Reservoir in Elmbridge, Surrey

The Island Barn Reservoir lies south of the River Thames in England at West Molesey and north of Lower Green, Esher. The reservoir is 122 acres (0.49 km2) large with a capacity of 992 million gallons and is managed by Thames Water. It is within the borough of Elmbridge and is surrounded by the River Mole to the west and the River Ember to the east. Queen Elizabeth II Reservoir is a larger reservoir to the West.

<span class="mw-page-title-main">Queen Elizabeth II Reservoir</span> Reservoir in Greater London, England

The Queen Elizabeth II Reservoir lies to the south of the River Thames and to the west of the Island Barn Reservoir. To the north are the Bessborough and Knight reservoirs. The A3050 runs to the north of the reservoir and it is situated in Walton on Thames. It is managed by Thames Water.

<span class="mw-page-title-main">London water supply infrastructure</span>

London's water supply infrastructure has developed over the centuries in line with the expansion of London.

Depth filters are the variety of filters that use a porous filtration medium to retain particles throughout the medium, rather than just on the surface of the medium. These filters are commonly used when the fluid to be filtered contains a high load of particles because, relative to other types of filters, they can retain a large mass of particles before becoming clogged.

<span class="mw-page-title-main">Jewell water filter</span>

A Jewell water filter was a system of sand filters for filtering and treating water for drinking purposes that made use of gravity to allow water to percolate through a column of sand inside cylindrical cisterns that was widely used in the early twentieth century. They are named after Omar Hestrian Jewell established Jewell Pure Water Company in Chicago in 1890 and managed later by two of his sons. Jewell water filters were used in many city water supply systems across the world and modified versions continue to be in use.

<span class="mw-page-title-main">Croton Water Filtration Plant</span> Water treatment facility in The Bronx, US

The Croton Water Filtration Plant, is a drinking water treatment facility in New York City which began operation in 2015. The plant construction cost was over $3 billion, The facility was built 160 feet (49 m) under Van Cortlandt Park's Mosholu Golf Course in the Bronx.

<span class="mw-page-title-main">Coppermills Water Treatment Works</span> Water treatment works in east London

The Coppermills Water Treatment Works is a large water treatment works in the Lea Valley in east London. Completed in 1969 by the Metropolitan Water Board, it is now owned and operated by Thames Water. In 2009, Coppermills was connected to the Thames Water Ring Main via the Northern Extension Tunnel, enabling the facility to be a major supplier of water to the whole London area. It is capable of supplying a maximum of 680 million litres of water per day.

The Chingford South water treatment works is a 58 million litre per day water processing facility commissioned in 2005 and located adjacent to the Wiilliam Girling reservoir in north east London.

References

  1. 1 2 "Walton water treatment works 1909". Thames Water. 1909. Retrieved 31 July 2020.
  2. 1 2 3 4 5 6 "Wonders of World Engineering vol. 1 & 2". Wonders of World Engineering. March 1937. Retrieved 31 July 2020.
  3. "The Metropolitan Water Board Water Works, West Molesey, 1926". Britain from Above. 1926. Retrieved 31 July 2020.
  4. "The Metropolitan Water Board Water Works, West Molesey, 1926". Britain from Above. 1926. Retrieved 31 July 2020.
  5. Ordnance Survey 6-inch map Surrey XII.NW (includes: East Molesey; Esher; Walton upon Thames; West Molesey.) Revised: 1938.
  6. Officer, J., J. A. Ostrowski and P. J. Woolard. (2001). "The design and operation of conventional and novel flotation systems on a number of impounded water types". Water Science and Technology: Water Supply. 1 (1): 63–69. doi:10.2166/ws.2001.0008.
  7. 1 2 3 4 5 Eades, Andrew and W. J. Brignall (1995). "Counter-Current Dissolved Air Floatation/Filtration". Water Science and Technology. 31 (3–4): 173–178. doi:10.2166/wst.1995.0527.
  8. 1 2 Bourbigot, M-M., N. Martin, M. Faivre, K. Le Corre, and S. Quennell (1991). "Efficacy of an ozoflotation-filtration process for the treatment of the River Thames at Walton Works". Aqua - Journal of Water Supply: Research and Technology. 40 (2): 88–96.
  9. "Thames Water disinfectant". Watson-Marlow. Retrieved 30 July 2020.
  10. 1 2 Li, Zhuojun,, Juntao Li, Zhengxiao Guo and Luiza C. Campos (2020). "Investigation of metaldehyde removal by powdered activated carbon from different water samples". Environmental Science: Water Research & Technology. 6 (5): 1432–1444. doi: 10.1039/C9EW00962K .
  11. "Molesey reservoirs". Archived from the original on 2011-07-14.
  12. "The Eels (England and Wales) Regulations 2009 (No. 3344)". legislation.gov. 2009. Retrieved 1 August 2020.
  13. "Environment Agency. Screening at intakes and outfalls: measures to protect eel" (PDF). Environment Agency. Retrieved 1 August 2020.
  14. "Walton eel screens". Water projects. October 2017. Retrieved 1 August 2020.