This article is actively undergoing a major edit for a short while. To help avoid edit conflicts, please do not edit this page while this message is displayed. This page was last edited at 14:42, 21 March 2023 (UTC) (1 second ago) – this estimate is cached, . Please remove this template if this page hasn't been edited for a significant time. If you are the editor who added this template, please be sure to remove it or replace it with {{ Under construction }} between editing sessions. |
Zambia Riverside Solar Power Station | |
---|---|
Country | Zambia |
Location | Kitwe, Kitwe District, Copperbelt Province |
Coordinates | 12°48′26″S28°14′11″E / 12.80722°S 28.23639°E Coordinates: 12°48′26″S28°14′11″E / 12.80722°S 28.23639°E |
Status | Operational |
Construction began | December 2021 |
Commission date | February 2023 |
Construction cost | US$19.2 million |
Owner(s) | Copperbelt Energy Corporation |
Operator(s) | Copperbelt Energy Corporation |
Solar farm | |
Type | Flat-panel PV |
Power generation | |
Nameplate capacity | 34 MW (46,000 hp) |
Annual net output | 54.9 GWh |
The Zambia Riverside Solar Power Station is a 34 megawatts solar power plant in Zambia. The privately owned solar farm was originally commissioned in April 2018, as a 1 MW power station by Copperbelt Energy Corporation (CEC), who own the energy infrastructure. In December 2021, CEC signed a engineering, procurement, and construction (EPC) contract with Sinohydro to expand the solar farm by 33 extra MW over the next 12 months. CEC transmits and distributes the power to its customers in the Copperbelt Province of Zambia. [1] [2]
The 1 MW power station was located on a piece of property measuring 1.1 hectares (2.7 acres), adjacent to the main campus of Copperbelt University, in the Riverside neighborhood in the city of Kitwe. [2] The 33 MW expansion sits on 30 hectares (74 acres) of land in Kitwe District. [1]
Kitwe is approximately 358 kilometres (222 mi) north of Lusaka, the national capital. [3] The geographical coordinates of Zambia Riverside Solar Power Station are: 12°48'26.0"S, 28°14'11.0"E (Latitude:-12.807222; Longitude:28.236389). [4]
In April 2018, CEC commenced commercial use of its 1 MW solar power station in Kitwe, as an income-diversification enterprise. In December 2021, CEC contracted Sinohydro to expand the solar farm to 34 MW, with anticipated annual output of 56.5 GWh. The power station, whose original design consisted of 3,864 photovoltaic panels, each rated at 270 watts, was the first grid-connected solar plant in Zambia. The expansion includes construction of new 11kV evacuation transmission lines to a location where the energy enters the CEC grid. [2] [5]
The construction costs for the expansion are reported as US$19.2 million, paid by CEC. Construction is expected to last approximately one year and conclude during the fourth quarter of 2022. [5]
In February 2023, the completed 34 MW solar farm was officially commissioned in the presence of Hakainde Hichilema, the Zambian Head of State. The new installation sits of 30 hectares (74 acres). Its annual output is calculated at 54.7 GWh, enough to energize 10,000 Zambian homes. [6]
During expansion, 800 people were employed over a 10 months period at a total cost of US$22 million. During the expansion, 61,300 panels, connected to 150 solar inverters were installed. Work also included the construction of 4 kilometres (2 mi) of new transmission line and six transformer stations. [6]
The Kafue Gorge Upper Power Station (KGU), is an operational 900 megawatts (1,206,920 hp) hydroelectric power plant across the Kafue River in Zambia.
Copperbelt Energy Corporation Plc (CEC) is a Zambian electricity generation, transmission, distribution and supply company with operations in Zambia and Nigeria. The company is listed on the Lusaka Stock Exchange
Alten Solar Power Station, also Kesses 1 Solar Power Station, is a 55 megawatts (74,000 hp) solar power plant under construction in Kenya, the largest economy in the East African Community.
Kafue Gorge Lower Power Station (KGL), is a 750 megawatts (1,010,000 hp) hydroelectric power station under construction in Zambia.
The Colleen Bawn Solar Power Station is a 32 MW (43,000 hp) solar power plant under development in Zimbabwe. The project is owned by Pretoria Portland Cement Limited, who own a cement factory in Colleen Bawn and plan to consume 16 megawatts of the electricity generated and sell the rest to the Zimbabwe national grid.
The Zeerust Solar Power Station is a 75 MW (101,000 hp) solar power plant in South Africa. It is a grid-connected, privately owned and privately funded solar power station.
Nkhotakota Solar Power Station, is an operational, 21 MW (28,000 hp) solar power plant in Malawi. The solar farm, whose first phase, with capacity of 21 MW, was commercially commissioned in March 2023, is under expansion to 38 MW by a consortium comprising independent power producers Phanes Group and Serengeti Energy Limited.
The Blitta Solar Power Station is an operational 50 MW (67,000 hp) solar power plant in Togo. The power station was developed by Amea Power, an independent power producer (IPP), based in the United Arab Emirates. The solar farm, which is the largest grid-ready in Togo, is also referred to as Mohamed Bin Zayed Power Station, named after His Highness Sheikh Mohamed bin Zayed Al Nahyan, the Crown Prince of Abu Dhabi. The power station began commercial operations in June 2021.
The Serenje Solar Power Station is a proposed 200 MW (270,000 hp) solar power plant in Zambia. The project is rated as the largest solar project in the country. The power station is under development by Ultra Green Corporation Zambia Limited, a subsidiary of Ultra Green Corporation Inc., an American independent power producer (IPP).
Bangweulu Solar Power Station (BSPS), is a 54 MW (72,000 hp) solar power plant in Zambia. The solar farm that was commercially commissioned in March 2019, was developed and is owned by a consortium comprising Neoen, a French IPP, Industrial Development Corporation of Zambia, a government parastatal company and First Solar, a US-based solar panel manufacturer. The power station cost US$60 million to develop.
The Greefspan II Solar Power Station, also Greefspan 2 Solar Power Station, is a 63.2 MW (84,800 hp) solar power plant in South Africa. It is a grid-connected, privately owned and privately funded solar power station. The solar farm began commercial operations in September 2021. The power station, whose construction started in 2018, was completed in December 2020. The nine months between completion and commercial commissioning were spent performing "grid connection tests" and other calibrations.
The Nagreongo Solar Power Station, also Nagréongo Solar Power Station, is a 30 MW (40,000 hp) solar power in Burkina Faso. The solar farm, which was commissioned in July 2022, was developed by the French IPP, GreenYellow, a subsidiary of the Casino Group. The energy generated here is sold to the Burkinabe electricity utility company SONABEL,, under a 25-year power purchase agreement (PPA).
The Kalulushi Concentrated Solar Power Station, also Kalulushi CSP Station, is a proposed 200 MW (270,000 hp) concentrated solar power plant in Zambia. The power station is under development by three IPPs, Margam Valley Solar Energy Corporation, Afrisolar Power and EnergyLine Zambia. The power generated here will be integrated into the national grid through Zambia Electricity Supply Corporation Limited (ZESCO).
Illoulofin Solar Power Station, is a 50 megawatts (67,000 hp) solar power plant in Benin, whose first 25 MW was commissioned on 19 July 2022, and the next 25 MW is under construction and is expected to come online in 2025.
The Dyason's Klip 1 Power Station,, is an 86 megawatts solar power plant in South Africa. The power station was developed and is owned and operated by a consortium comprising an international independent power producer (IPP), South African and European investors and a local charitable trust. Commercially commissioned in February 2020, the solar farm's 217 GWh of energy production annually is sold to Eskom, the national electricity utility company, under a long-term power purchase agreement (PPA).
The Omburu Solar Power Station, is a 20 megawatts solar power station in Namibia. The power station, which was developed and is owned by Namibia Power Corporation (Proprietary) Limited (NamPower), was constructed between March 2021 and June 2022 and was commercially commissioned on 24 June 2022. NamPower integrates the energy generated here, calculated at 67.8 GWh annually, into the Namibian grid. This is the first grid-connected PV solar power station, fully owned and operated by NamPower.
The Sirius 1 Solar Power Station, is an 86 MW solar power station in South Africa. The power station was developed by a joint venture between Aurora Power Solutions and Sirius Solar PV Project One. The off-taker of the energy generated here is Eskom Holdings, the South African national electricity utility parastatal company. A 20-year power purchase agreement between Eskom and the owners of the power station, governs the purchase and sale of electricity between the two. Commercial commissioning was achieved in February 2020.
The Kisumu Power Station, also Kisumu One Solar Power Station, is a 40 MW (54,000 hp) solar power plant under development in Kenya. It is owned by Ergon Solair Africa (ESA), based in Nairobi, Kenya. ESA is a subsidiary of Ergon Solair PBC, an American independent power producer, headquartered in Wilmington, Delaware, United States. The off-taker is the national electricity distribution company, Kenya Power and Lighting Company, under a long-term power purchase agreement.
The Bolobedu Solar Power Station is an 148 MW solar power plant planned in South Africa. The solar farm is owned and under development by a consortium led by Voltalia, the French multinational independent power producer (IPP) and Black South African shareholders, including a community trust. The off-taker of the power generated here is Richards Bay Minerals (RBM), a South African mining company owned by the Anglo-Australian mining conglomerate, Rio Tinto. The power will be conveyed from the solar farm to the customer's mine using the transmission lines of Eskom, the national electricity parastatal company, as is permissible under South African law.