This article needs additional citations for verification .(October 2017) |
KJ1 Gombak | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LRT station | ||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||
Other names | ڬومبق (Jawi) 鹅唛 (Chinese) கும்பக் (Tamil) | |||||||||||||||||||||||||
Location | Jalan Terminal Putra, Taman Melati 53100, Kuala Lumpur Malaysia | |||||||||||||||||||||||||
Owned by | Prasarana Malaysia | |||||||||||||||||||||||||
Operated by | Rapid Rail [1] | |||||||||||||||||||||||||
Line(s) | 5 Kelana Jaya | |||||||||||||||||||||||||
Platforms | 1 Island platform | |||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | Elevated | |||||||||||||||||||||||||
Parking | Available with payment. 1439 total parking bays. (with 24 disabilities parking bays and 155 women parking bays) [2] | |||||||||||||||||||||||||
Accessible | Available | |||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||
Station code | KJ1 | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opened | 1 June 1999 | |||||||||||||||||||||||||
Previous names | Terminal PUTRA | |||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
|
Gombak (previously known as the Terminal PUTRA LRT station) is an LRT station in Gombak District, Selangor, Malaysia. It is the northern terminus for the RapidKL Kelana Jaya Line.
There is a ticket counter for buses to Genting Highlands, with buses departing to the Genting Skyway station every half-hour. [3] These buses are operated by Resorts World Berhad. This station is normally utilised by residents of Kuala Lumpur, especially those living around Setapak area when they are going to Genting.
The Gombak toll plaza, the beginning of the East Coast Expressway (LPT) East Coast Expressway, is one kilometre north from this station.
Currently this station is the northernmost in the RapidKL rail transport network.
Under the Ninth Malaysia Plan, the transportation hub called Gombak Integrated Transportation Terminal (GITT) are plan to cater for express buses coming in from the east coast of Malaysia similar to Terminal Bersepadu Selatan, an integrated hub in Bandar Tasik Selatan. [4] As of 2022, construction was started and will be connecting with LRT station and under construction of MRL East Coast Rail Link (ECRL). [5] [6] [7]
Route No. | Via | Connecting to | Reachable |
---|---|---|---|
T200 | Jalan Taman Melati 1/5 Kuala Lumpur Middle Ring Road 2 (MRR2) Lingkaran UIA | 200 | IIUM |
T201 | Jalan Taman Melati 1/5 Kuala Lumpur Middle Ring Road 2 (MRR2) Lebuh Utama Sri Gombak Jalan Makmur Jalan Lintang Jalan Permai Jalan Gombak Permai 2 | 170 171 202 BET17 | Al-Khairiah Mosques(Taman Seri Gombak) Sri Gombak Commercial Centre SMK Hillcrest Taman Prima Sri Gombak |
MPS1 | Jalan Taman Melati 1/5 Kuala Lumpur Middle Ring Road 2 (MRR2) Jalan Sungai Pusu Jalan Gombak KC05 KTM Batu Caves Jalan Sungai Tua Selayang Baru Kepong–Selayang Highway Bandar Baru Selayang | 151 | SBP Integrasi Gombak SK Gombak Utara SK Sungai Pusu Gombak Vocational College Sri Gombak Commercial Centre Giant Hypermarket Batu Caves Sungai Chinchin Mosques |
Genting Express | East Coast Expressway (KARAK) | Awana Skyway | Genting Highlands Chin Swee Caves Temple Genting Highlands Premium Outlets |
Kuala Lumpur Sentral Station is a transit-oriented development that houses the main railway station of Kuala Lumpur, the capital of Malaysia. Opened on 16 April 2001, KL Sentral replaced the old Kuala Lumpur railway station as the city's main intercity railway station. KL Sentral is the largest railway station in Malaysia, and also in Southeast Asia from 2001 to 2021, before Krung Thep Aphiwat Central Terminal in Bangkok, Thailand was completed.
Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. The acronym stands for Rangkaian Pengangkutan Integrasi Deras Kuala Lumpur, which translates to Kuala Lumpur Rapid Integrated Transport Network in the Malay language. Rapid KL, with its 204.1 km (126.8 mi) of metro railway and 5.6 km (3.5 mi) of BRT carriageway, is part of the Klang Valley Integrated Transit System, operating throughout Kuala Lumpur and Selangor's satellite cities in the Klang Valley area.
The LRT Kelana Jaya Line is a medium-capacity light rapid transit (LRT) line and the first fully automated and driverless rail system in the Klang Valley, Malaysia. It forms part of the Klang Valley Integrated Transit System in and around Kuala Lumpur, Malaysia. Servicing 37 stations, the line has 46.4 km (28.8 mi) of grade-separated tracks running mostly on underground and elevated guideways. Formerly known as the PUTRA-LRT, it is operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia. The line is named after its former terminus, the Kelana Jaya station. The line is numbered 5 and coloured ruby on official transit maps.
Prasarana Malaysia Berhad (Prasarana) (English: Malaysian Infrastructure Limited) is a 100% government-owned company which was set up by Ministry of Finance (Malaysia) as a corporate body established under the Minister of Finance (Incorporation) Act 1957 to own the assets of multi-modal public transport operator in Malaysia, under the government's move to restructure the city's public transport system. It is one of the largest public-transport companies in Malaysia other than Konsortium Transnasional Berhad. As a government-owned company since 1998, it operates stage bus and light metro services via several wholly owned subsidiaries.
Setapak is a town and mukim straddling both norteastern Kuala Lumpur and Gombak District of Selangor, Malaysia.
Sunway City is an 800-acre integrated township in Subang Jaya, Selangor, Malaysia. This township is named after its developer, Sunway Group, which had also got its name from Sungai Way, a suburb in Selangor.
Rail transport in Malaysia consists of heavy rail, light rapid transit (LRT), mass rapid transit(MRT), monorails, airport rail links and a funicular railway line. Heavy rail is mostly used for intercity services and freight transport as well as some urban public transport, while rapid transit rails are used for intracity urban public transport in the capital city of Kuala Lumpur and the surrounding Klang Valley region. There are two airport rail link systems linking Kuala Lumpur with the Kuala Lumpur International Airport (KLIA) and Sultan Abdul Aziz Shah Airport. The only-functioning monorail line in the country is also used for public transport in Kuala Lumpur, while the only funicular railway line is available in Penang.
Rapid Bus Sdn Bhd is the largest bus operator in Malaysia operating mainly in urban areas of Klang Valley, Penang & Kuantan. As of February 2023, Rapid KL service brands unit of Rapid Bus, has operates 113 normal routes and also 69 MRT Feeder Bus routes, along with 8 Nadiputra routes in Putrajaya.
Masjid Jamek LRT station is a rapid transit station in Kuala Lumpur, Malaysia. It is the interchange station between two of Rapid KL's light rapid transit (LRT) systems, namely the LRT Ampang and Sri Petaling Lines and the LRT Kelana Jaya Line. The station is one of only two stations integrating the LRT lines, the other being Putra Heights station. The station is situated near and named after the Masjid Jamek in central Kuala Lumpur.
Bandar Tasik Selatan station (BTS) is a major Malaysian interchange station located next to and named after Bandar Tasik Selatan, in Kuala Lumpur. The station serves as both a stop and an interchange for the KTM Komuter's Seremban Line, KTM ETS, the LRT Sri Petaling Line, and the Express Rail Link's KLIA Transit trains. BTS is integrated with the Terminal Bersepadu Selatan bus hub (TBS). BTS and TBS are developed as an intermodal transportation hub.
Transport in Greater Kuala Lumpur includes a road network, a railway network, airports, and other modes of public transport. Greater Kuala Lumpur is conterminous with the Klang Valley, an urban conglomeration consisting of the city of Kuala Lumpur, as well as surrounding towns and cities in the state of Selangor. The Klang Valley has the country's largest airport, the Kuala Lumpur International Airport (KLIA), as well as the country's largest intermodal transport hub and railway station, Kuala Lumpur Sentral.
The Pasar Seni station is an integrated rapid transit station in Kuala Lumpur that is served by the LRT Kelana Jaya Line and the MRT Kajang Line. The station is named after the nearby Central Market and is located near Petaling Street and the area known as the Chinatown of Kuala Lumpur.
Taman Melati LRT station is an elevated rapid transit station in northern Kuala Lumpur, Malaysia, part of the Kelana Jaya Line. The station was opened on 1 June 1999, as part of the line's second segment encompassing 12 stations between Masjid Jamek station and Terminal PUTRA and an underground line.
The Subang Jaya station is a railway station located in SS16, Subang Jaya. It is served by the KTM Komuter Port Klang Line and Skypark Link, as well as the LRT Kelana Jaya Line.
Rapid Rail Sdn Bhd is the operator of the rapid transit (metro) system serving Kuala Lumpur and the Klang Valley area in Malaysia. A subsidiary of Prasarana Malaysia, it is the sole operator of five rapid transit lines which collectively form the Rapid KL rapid transit system. The system currently consists of three light rapid transit (LRT) lines, two mass rapid transit (MRT) lines and a monorail line, with another MRT and LRT line currently under construction.
The Klang Valley Integrated Transit System is an integrated transport network that primarily serves the area of Klang Valley and Greater Kuala Lumpur. The system commenced operations in August 1995 with the introduction of commuter rail service on the existing rail between Kuala Lumpur and Rawang. The system have since expanded and currently consists of 11 fully operating rail lines in a radial formation; two commuter rail lines, six rapid transit lines, one bus rapid transit line and two airport rail links to the Kuala Lumpur International Airport's (KLIA) Terminal 1 and Terminal 2, and one temperarily suspended airport rail link to the Sultan Abdul Aziz Shah Airport. The system encompasses 528.4 kilometres (328.3 mi) of grade-separated route on standard gauge and metre gauge with 197 operational stations.
The East Coast Rail Link (ECRL) is a standard gauge double-track railway link infrastructure project connecting Port Klang on the Straits of Malacca to Kota Bharu in northeast Peninsular Malaysia, connecting the East Coast Economic Region states of Pahang, Terengganu and Kelantan to one another, and to the Central Region of the Peninsula's west coast.
Ampang Park LRT station is a light rapid transit (LRT) station in Kuala Lumpur that is served by RapidKL's LRT Kelana Jaya Line. The LRT station is the last underground station on the Kelana Jaya Line along Jalan Ampang, near the Jalan Tun Razak intersection, before the line heads above ground again at Damai LRT station.
On 24 May 2021, at 20:33 local Malaysia time, a head-on collision occurred between a manually-driven empty train and an automated train carrying passengers, on the Kelana Jaya line between Kampung Baru and KLCC stations in Kuala Lumpur, Malaysia. The accident caused 213 injuries, including 166 minor injuries and 47 serious injuries.