Hawes Street station

Last updated

Hawes Street
Inbound train at Hawes Street (1), August 2016.JPG
Inbound train at Hawes Street in August 2016
General information
Location Beacon Street at Hawes Street
Brookline, Massachusetts
Coordinates 42°20′42″N71°06′40″W / 42.34487°N 71.111129°W / 42.34487; -71.111129
Platforms2 side platforms
Tracks2
History
Rebuilt2026 (planned)
Passengers
2011339 (weekday average boardings) [1]
Services
Preceding station MBTA.svg MBTA Following station
Kent Street Green Line Saint Mary's Street
Location
Hawes Street station

Hawes Street station is a light rail surface stop on the MBTA Green Line C branch, located in the median of Beacon Street west of Hawes Street in Brookline, Massachusetts. The station consists of two side platforms which serve the C branch's two tracks. With 339 boardings on an average weekday in 2011, Hawes Street has the lowest ridership on the C branch and fourth-lowest on the entire Green Line. [1]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. [2] Design work for Hawes Street and seven other C Branch stations was 15% complete by December 2022. [3] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Hawes Street. [4] The MBTA awarded a $41.9 million design-build contract in April 2025. [5] Designs shown in February 2026 called for the platforms at Hawes Street to be widened and rebuilt in their current locations. As of February 2026, construction is expected to take place from spring 2026 to fall 2026. [6]

References

  1. 1 2 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  3. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
  4. Dunlevy, Gwen (April 24, 2025). "MBTA Construction Contract No. A26CN04 Design Build Green Line C Branch Short Term Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority.
  5. "Tree Planting Committee Meeting 02.03.2026 Presentation". Town of Brookline. February 3, 2026.

Commons-logo.svg Media related to Hawes Street station at Wikimedia Commons