North Tees Power Station

Last updated

North Tees A, B & C Power Stations
North tees power station.jpg
North Tees C Power Station in the 1980s
North Tees Power Station
CountryEngland
Location Billingham
Coordinates 54°35′13″N1°15′47″W / 54.587°N 1.263°W / 54.587; -1.263
StatusDecommissioned and demolished
Construction began1921
Commission date 1921
Decommission date1983
Operator(s) North Eastern Electric Supply Company
(1921–1948)
British Electricity Authority
(1949–1955)
Central Electricity Authority
(1955–1957)
Central Electricity Generating Board
(1957–1971)
Imperial Chemical Industries
(1971–1983)
Thermal power station
Primary fuel Coal
Power generation
Units operationalA station:
Two Metropolitan-Vickers 20 MW
B station:
Two Parsons and one Metropolitan Vickers
C station:
Two 60 MW
Nameplate capacity 1921: 40 MW
1983: 263 MW

grid reference NZ477210

North Tees Power Station refers to a series of three coal-fired power stations on the River Tees at Billingham in County Durham. Overall, they operated from 1921 until 1983, and the C station, the last on the site, was demolished in 1987. Billingham Biomass Power Station is to be built on their site.

Contents

North Tees A

History

In 1917, the Newcastle upon Tyne Electric Supply Company (NESCo) took control of the principal electrical undertakings for a large area in south County Durham and North Yorkshire. To supply the newly acquired area, NESCo built the North Tees Power Station on the banks of the River Tees at Billingham. [1] The construction of the station began in 1917 and was completed for opening in 1921. [2]

Design and specification

The station was designed by the engineering consultants Merz & McLellan. The station used two Metropolitan-Vickers 20,000 kilowatt (kW) turbo-alternators to generate electricity, giving it a total generating capacity of 40,000 kW. [3] The Babcock & Wilcox boilers which were used to provide the steam to the turbines in the station, were famous in engineering circles at the time. In 1918 the boilers became the first in the world to use steam at up to 450 psi, and pioneered the practice of reheating it during expansion in the turbine plant. [4] [5] This development resulted in a further increase in the efficiency of power generation, and an appreciable decrease in the quantity of coal consumed per unit of electricity generated. [1] In 1922, W.S. Monroe of the Chicago-based consulting firm Sargent & Lundy described North Tees Power Station as "the most advanced power station in the world". [3]

The station was connected by NESCo's high voltage transmission lines to their power stations on the River Tyne, for successful running "in parallel". [1] When the UK's national grid distribution system was brought into use in 1932, the station was one of a small number of stations in the region to be converted from the 40 hertz (Hz) frequency used by the North Eastern grid system to the 50 Hz frequency used by the national system. [6] However, the nearby ICI plant, which operated its own power station, required the North Tees A station's power as back-up, but the power needed to be supplied at 40 Hz, and so the A station retained three frequency changers to supply back-up power for many years after the change over, until the 1950s, when new electrical equipment needed to be ordered at the ICI plant. [7]

Closure

The A station closed in 1959, after a number of years being used as a reserve station for high demand. Following closure, Metropolitan-Vickers took the rotors from the stations and tested them to destruction, to find out why the older machines were more efficient than the new ones. [7]

North Tees B

The B station was commissioned in 1934, and used pulverised fuel firing, an advanced technology at the time the station was built. The station generated electricity using two Parsons and one Metropolitan-Vickers turbines, each driving two alternators in tandem. It was demolished in the late 1960s. [7]

Upon nationalisation of the British electricity supply industry in 1948 the ownership of North Tees A and B power stations were vested in the British Electricity Authority, and subsequently the Central Electricity Authority and the Central Electricity Generating Board (CEGB). The electricity distribution and sales functions were vested in the North Eastern Electricity Board. [8]

The electricity output from the A and B stations was: [9] [10]

North Tees A and B station output GWh
YearStation output GWh
1953/4174.2
1954/5239.6
1955/6191.3
1956/7120.9
1957/876.6
North Tees B
1960/131.113
1961/225.0
1962/345.22
1966/748.786

North Tees C

History

North Tees C Station was proposed in 1945, by the original two stations' operators, NESCo. However, the scheme was taken over by the British Electricity Authority when NESCo was nationalised in 1948. [1] [11] The station was built by the Cleveland Bridge Company and completed in 1949. [12]

Design and specification

The C station had four Parsons 60,000 kilowatt (kW) turbo-alternators with steam raised in seven Babcock and Wilcock boilers fed via a steam range , giving it a total generating capacity of 240 MW. [11] [1] The station's exterior was designed by Giles Gilbert Scott, who also designed Battersea Power Station. [13] The station was one of the first in the world to use hydrogen cooled generators. [7] It was also the first in England to use 66,000 V air blast switchgear. [1]

The boilers had an output capacity of 2,520,000 pounds per hour (317.5 kg/s) of steam at 900 psi (62.1 bar) and 496 °C. In 1971 the station delivered 1,097.33 GWh of electricity. [14]

The electricity output from the C station was: [9] [14] [10]

North Tees C station output GWh
YearStation output GWh
1953/41097.7
1954/51171.7
1955/61089.3
1956/71055.7
1957/81128.6
1960/11445.45
1961/21338.6
1962/31275.6
1966/71110.1
1971/21097.3
1978/9378.0

Closure

The station was operated by the CEGB (north east region), The station was decommissioned on 31 October 1983, with a generating capacity of 236 MW. [15] In 1987, the site was acquired by Able UK and the station demolished so they could redevelop the site as Billingham Reach Industrial Estate. [13] [16]

Future of site

The station's site is currently part of Billingham Reach Industrial Estate, an international wharf owned by Able UK Ltd. [13] On 15 October 2009, planning permission was granted for the Billingham Biomass Power Station, which is to be built on the site of the former coal-fired power stations. [17] As at October 2017 the old power station site remains undeveloped.

Related Research Articles

<span class="mw-page-title-main">Littlebrook Power Station</span> Series of four oil and coal-fired power stations in Dartford, Kent

The Littlebrook Power Station were a series of four oil and coal-fired power stations situated on the south bank of the River Thames, next to the Queen Elizabeth 2 Bridge and the Dartford Tunnel in Dartford, Kent. The final power station, Littlebrook D, ceased operating in March 2015, and has now been demolished.

<span class="mw-page-title-main">West Ham Power Station</span> Former coal-fired power station in London, England

West Ham Power Station was a coal-fired power station on Bow Creek at Canning Town, in east London. It was often referred to informally as Canning Town Power Station.

<span class="mw-page-title-main">Dunston Power Station</span> Coal-fired power station in England

Dunston Power Station refers to a pair of adjacent coal-fired power stations in the North East of England, now demolished. They were built on the south bank of the River Tyne, in the western outskirts of Dunston in Gateshead. The two stations were built on a site which is now occupied by the MetroCentre. The first power station built on the site was known as Dunston A Power Station, and the second, which gradually replaced it between 1933 and 1950, was known as Dunston B Power Station. The A Station was, in its time, one of the largest in the country, and as well as burning coal had early open cycle gas turbine units. The B Station was the first of a new power station design, and stood as a landmark on the Tyne for over 50 years. From the A Station's opening in 1910 until the B Station's demolition in 1986, they collectively operated from the early days of electricity generation in the United Kingdom, through the industry's nationalisation, and until a decade before its privatisation.

<span class="mw-page-title-main">Great Yarmouth Power Station</span> Gas power station in Norfolk, England

Great Yarmouth Power Station is combined cycle gas turbine power station on South Denes Road in Great Yarmouth in Norfolk, England, with a maximum output of 420 MW electricity, opened in 2001. It is built on the site of an oil-fired power station, built in 1958 and closed and demolished in the 1990s. A coal-fired power station was built in Great Yarmouth in 1894 and operated until 1961. The station is operated by RWE.

<span class="mw-page-title-main">Roosecote Power Station</span>

Roosecote Power Station was a gas-fired, originally coal-fired power station, situated in the Roosecote district of Barrow-in-Furness in Cumbria, North West England. The gas-fired station opened in 1991 and was the first CCGT power station to supply electricity to the United Kingdom's National Grid, but was mothballed in 2012 after a proposed biomass power station was cancelled. It was situated directly adjacent to Rampside Gas Terminal. The plant was demolished between 2014 and 2015. The site is now a 49 MW battery storage facility.

<span class="mw-page-title-main">Carville power stations</span> Two coal-fired power stations in England

Carville Power Station refers to a pair of now partially demolished coal-fired power stations, situated in North East England on the north bank of the River Tyne at Wallsend. The two stations were built alongside each other on a riverside site about 5 mi (8.0 km) downstream of Newcastle upon Tyne. Carville A Power Station, the first station on the site was opened in 1904, and Carville B Power Station was opened in 1916 to its south.

Neptune Bank Power Station was a coal-fired power station situated on the River Tyne at Wallsend near Newcastle upon Tyne. Commissioned in 1901 by the Newcastle upon Tyne Electric Supply Company, the station was the first in the world to provide electricity for purposes other than domestic and street lighting. It was also the first in the world to generate electricity using three-phase electrical power distribution at a voltage of 5,500 volts.

Blackburn Meadows power station is a biomass power station situated at Blackburn Meadows on the River Don, between Sheffield and Rotherham in South Yorkshire, England. Operated by E.ON UK, it was opened in 2014 and has an operating capacity of 30 megawatts.

Hartshead Power Station was a coal-fired power station situated at Heyrod, Greater Manchester in North West England.

Stuart Street Power Station was a coal-fired power station in Bradford, Manchester, England.

<span class="mw-page-title-main">Doncaster Power Station</span>

Doncaster Power Station refers to two coal-fired electricity generating stations situated in the centre of Doncaster in South Yorkshire, England. Doncaster A provided electricity to the town from 1900 to 1958, and the B station from 1953 to 1983.

Bold Power Station refers to a series of two coal-fired power stations in Bold near St Helens, Merseyside, North West England. They were closed, decommissioned and demolished between 1981 and 1992, and a housing estate now occupies the site.

Carmarthen Bay Power Station was an electricity power plant on the north shore of the Burry estuary in Wales in operation from 1953 to 1984.

Southampton Power Station was a coal fired power station built by Southampton Corporation that operated between 1904 and 1977.

The Worcester Power Stations were a series of hydro-electric and coal-fired generating stations providing electricity to the City of Worcester.

Ribble Power Station was a coal-fired electricity generating station on the River Ribble in Penwortham near Preston, Lancashire, England. The station was built by the Corporation of Preston to replace a small privately-run generating station in the town. It supplied electricity to Preston and the surrounding area from 1923 until 1976. The station was expanded with new equipment in 1943–47 which remained in operation until the power station was closed in 1976 and was subsequently demolished.

The Lancaster power stations provided electricity to the Lancashire town and city of Lancaster and the surrounding area from 1894 to 1976. The first power station was built and operated by Lancaster Corporation and started generating electricity in April 1894. The second power station was built during the First World War near the Lune Aqueduct to provide electric power for a munitions factory. When the factory closed after the war the power station was purchased by the corporation to provide electric power throughout its supply area.

The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.

Barrow-in-Furness power station supplied electricity to the town of Barrow-in-Furness and the wider area of Lancashire, England from 1899 to about 1960. It was owned and operated by Barrow-in-Furness Corporation until the nationalisation of the UK electricity supply industry in 1948. The power station was redeveloped throughout its operational life. Barrow-in-Furness Corporation also operated Coniston hydro-electric power station.

Trafford power station supplied electricity to the Trafford and Stretford areas of Greater Manchester, and to the national grid, from 1929 to 1976. The generating station was built by the Stretford and District Electricity Board which it operated until the nationalisation of the British electricity supply industry in 1948. The 60 megawatt coal-fired station was supplemented in 1952 with an experimental 15 megawatt gas turbine generating set.

References

  1. 1 2 3 4 5 6 North-Eastern Electric Supply Company Limited 1889–1948. Newcastle upon Tyne: T.M Grierson Ltd. March 1948.
  2. "North Eastern Electricity Board". The National Archives. Retrieved 5 November 2008.
  3. 1 2 Parke Hughes, Thomas (1993). Networks of Power. JHU Press. pp. 457–458. ISBN   0-8018-4614-5 . Retrieved 8 February 2009.
  4. Dummelow, John. "Metropolitan-Vickers Electrical Co 1899–1949 by John Dummelow: 1909–1919". gracesguide.com. Retrieved 23 December 2010.
  5. Parsons, R.H. (1939). "X". The Early Days of the Power Station Industry. Cambridge: Cambridge University Press. p. 183.
  6. Pears, Brian (23 February 2003). "Norfolk to Northumberland". Rootsweb . Archived from the original on 15 July 2011. Retrieved 9 September 2009.
  7. 1 2 3 4 Bate, David. "North Tees Power Station, Billingham Reach. 1967\r". Picture Stockton. Archived from the original (ASPX) on 8 October 2011. Retrieved 23 December 2010.
  8. Electricity Council (1987). Electricity Supply in the United Kingdom: a Chronology. London: Electricity Council. p. 60. ISBN   085188105X.
  9. 1 2 Garrett, Frederick C., ed. (1959). Garke's Manual of Electricity Supply vol.56. London: Electrical Press. pp. A-80–81, A-129.
  10. 1 2 CEGB Annual report and Accounts, 1961, 1962 & 1963
  11. 1 2 "ELECTRICITY (NORTH-EASTERN AREA)". Mr Shinwell. 31 October 1945. Retrieved 5 November 2008.
  12. "A – Z list of Bridges Built by Cleveland Bridge Company". Newcastle University . Archived from the original on 27 May 2003. Retrieved 18 April 2011.
  13. 1 2 3 kjfitz (15 April 2007). "Former ICI Bellingham explosives plant and nuclear power plant". virtualglobetrotting.com. Retrieved 20 November 2008.
  14. 1 2 CEGB (1972). CEGB Statistical Yearbook 1972. London: CEGB. p. 15.
  15. Shaw, Giles (16 January 1984). "Coal-fired Power Stations". Parliamentary Debates (Hansard) . Retrieved 22 July 2009.
  16. Historic England. "NORTH TEES POWER STATION (602510)". Research records (formerly PastScape). Retrieved 7 October 2013.
  17. "£200 million biomass plant wins planning approval". New Energy Focus. 16 October 2009. Retrieved 23 December 2010.[ permanent dead link ]