Holmside Hall Wind Farm

Last updated

Holmside Hall Wind Farm
Craghead Windmills - geograph.org.uk - 84084.jpg
The two turbines of Holmside Hall
Holmside Hall Wind Farm
Country England, United Kingdom
Location Stanley, County Durham
Coordinates 54°50′50″N1°41′13″W / 54.8472°N 1.68694°W / 54.8472; -1.68694
StatusOperational
Commission date May 2004
Owner(s) E.ON UK
Site elevation722 ft
Power generation
Units operational2 × 2.75 MW
Make and modelNEG Micon
Nameplate capacity 5.5 MW
External links
Commons Related media on Commons

Holmside Hall Wind Farm is a wind farm near Stanley, County Durham, England. Owned and operated by E.ON UK, the farm has a nameplate capacity of 5.5MW, containing two NM80 turbines each rated at 2.75 MW. [1]

At the time of construction, which was delayed due to high winds, the turbines were the largest and most powerful in the UK. [2]

Related Research Articles

<span class="mw-page-title-main">Scroby Sands Wind Farm</span>

The Scroby Sands Wind Farm is a wind farm located on the Scroby Sands sandbank in the North Sea, 2.5 kilometres (1.6 mi) off the coast of Great Yarmouth in eastern England, United Kingdom. It was commissioned in March 2004 by Powergen Renewables Offshore, a division of E.ON UK. It has a nameplate capacity of 60 megawatts and is able to produce power to supply 41,000 households. Between 2005 and 2010, its capacity factor was between 26 and 32%. Its levelised cost has been estimated at £105/MWh.

<span class="mw-page-title-main">Royd Moor Wind Farm</span> Wind farm in Yorkshire, England

The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven, on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level.

The Thanet Wind Farm is an offshore wind farm 7 miles (11 km) off the coast of Thanet district in Kent, England. On commissioning it was the world's largest offshore wind farm. It has a nameplate capacity of 300 MW and it cost £780–900 million (US$1.2–1.4 billion). Thanet is one of fifteen Round 2 wind projects announced by the Crown Estate in January 2004 but the first to be developed. It was officially opened on 23 September 2010, when it overtook Horns Rev 2 as the biggest offshore wind farm in the world. It has since been overtaken by many others.

<span class="mw-page-title-main">Blood Hill wind farm</span>

Blood Hill is a wind farm near Hemsby in Norfolk, England. It is the smallest windfarm owned by E.ON; taking up 3 hectares. It has a nameplate capacity of 2.25MW which is enough to power 1000 homes at peak. There were 10 Vestas V27-225 kW turbines which were 30 metres tall and stand on top of Blood Hill. They are visible from the villages of Hemsby and Winterton-on-Sea. Blood Hill began operating in December 1992 and was one of the first windfarms in the United Kingdom.

<span class="mw-page-title-main">Kentish Flats Offshore Wind Farm</span>

The Kentish Flats Offshore Wind Farm is a wind farm located off the coast of Kent, England on a large, flat and shallow plateau just outside the main Thames shipping lanes. The wind farm is operated by Vattenfall.

Langley Park Wind Farm is a wind farm near Langley Park, County Durham, England. It was developed by EDF Energy and is operated by Cumbria Wind Farms, the farm has a nameplate capacity of 8.2 MW, containing four REpower Systems' MM82 turbines each rated at 2.05MW.

<span class="mw-page-title-main">West Durham Wind Farm</span>

West Durham Wind Farm is a wind farm near Tow Law, County Durham, England.

<span class="mw-page-title-main">Blyth Harbour Wind Farm</span> Wind farm in East Bedlington, Blyth, Northumberland, England

Blyth Harbour Wind Farm is a coastal wind farm located in East Bedlington along the East Pier of the Port of Blyth. Commissioned in January 1993 it consists of nine 0.3 MW WindMaster turbines giving a total capacity of 2.7 MW. It was developed by AMEC Wind and is owned by Hainsford Developments Limited.

<span class="mw-page-title-main">Blyth Offshore Wind Farm</span>

Blyth Offshore Wind Farm was a small coastal wind farm located 0.5 miles (0.80 km) off the coast of Blyth, Northumberland, England.

Trimdon Grange Wind Farm is an onshore wind farm near Trimdon Grange, County Durham, England. Commissioned in October 2008 it consists of four 1.3 MW Nordex N60 turbines giving a total capacity of 5.2 MW. It was developed by EDF and is operated by Cumbria Wind Farms.

<span class="mw-page-title-main">Great Eppleton Wind Farm</span>

Great Eppleton Wind Farm is a wind farm near Hetton-le-Hole, England. It is owned and operated by E.ON UK. Constructed in 1997, it was notable for originally consisting of twin-bladed turbines, as most wind turbines have three blades. On 29 September, E.ON announced it would replace these with four new REpower MM92 turbines giving a nameplate capacity of 8.2 MW.

Brechfa Forest West Wind Farm is a wind farm in Brechfa Forest in Carmarthenshire in south west Wales. Construction of the wind farm began in November 2016 and power generation commenced in January 2018.

<span class="mw-page-title-main">Delabole wind farm</span> Wind farm in Cornwall, England

The Delabole wind farm was the first commercial onshore wind farm built in the United Kingdom, in November 1991. This field of wind turbines was initially developed by Windelectric Management Ltd.

<span class="mw-page-title-main">West of Duddon Sands Wind Farm</span>

West of Duddon Sands Wind Farm (WoDS), occasionally also known as West Duddon Wind Farm is an offshore wind farm located 14 kilometres (8.7 mi) south west of Walney Island off the coast of Barrow-in-Furness in Cumbria, in the Irish Sea, England. It was developed by Scottish Power and Ørsted A/S.

<span class="mw-page-title-main">Walney Wind Farm</span> Offshore wind farm off the coast of Cumbria, England

Walney Wind Farms are a group of offshore wind farms 9 miles (14 km) west of Walney Island off the coast of Cumbria, England, in the Irish Sea. The group, operated by Ørsted, consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW and it was the world's second largest offshore wind farm in 2018.

<span class="mw-page-title-main">Teesside Wind Farm</span> British offshore wind farm

Teesside Wind Farm, or alternatively referred to as Redcar Wind Farm, is a 27 turbine 62 MW capacity offshore wind farm constructed just to the east of the mouth of the River Tees and 1.5 km north of Redcar off the North Yorkshire coast, in the North Sea, England.

The Papalote Creek Wind Farm near Taft, Texas in San Patricio County is an array of 196 wind turbines that can produce 380 megawatts (MW) of power, enough to serve approximately 114,000 homes. The wind farm was built and is operated by E.ON Climate and Renewables North America.

The European Offshore Wind Deployment Centre (EOWDC), also known as the Aberdeen Bay Wind Farm is an offshore wind test and demonstration facility located around 3 kilometres off the east coast of Aberdeenshire, in the North Sea, Scotland. It was developed by the European Offshore Wind Deployment Centre consortium. The scheme is relatively small - it consists of 11 wind turbines with an installed capacity of 93.2 megawatts. It is located between Blackdog and Bridge of Don near Aberdeen. First power was generated in July 2018, with full commissioning following in September 2018.

Kilgallioch Wind Farm is a 96 turbine wind farm in South Ayrshire, Scotland with a total capacity of up to 239 megawatts (MW). Consent granted by the Scottish Government in February 2013 with construction starting in 2015 and completed in 2017. The wind farm contains 70 km of internal tracks, and a surface area of roughly 32 km2.

References

  1. "UKWED Operational wind farms". RenewableUK. Archived from the original on 25 February 2006. Retrieved 2 August 2010.
  2. "Ironically, wind conditions delay turbines". The Northern Echo . Newsquest Media Group. 13 November 2003. Retrieved 11 November 2009.