Langley Park Wind Farm

Last updated

Langley Park Wind Farm
Langley Park Wind Farm
Country England, United Kingdom
Location Langley Park, County Durham
Coordinates 54°47′42″N1°40′02″W / 54.795°N 1.6672°W / 54.795; -1.6672
StatusOperational
Commission date December 2008
Owner(s) EDF Energy
Operator(s)Cumbria Wind Farms
Wind farm
Hub height59m
Rotor diameter82m
Site elevation1552 ft
Power generation
Units operational4 × 2.05 MW
Make and modelREpower Systems: MM82
Nameplate capacity 8.2 MW

Langley Park Wind Farm is a wind farm near Langley Park, County Durham, England. It was developed by EDF Energy and is operated by Cumbria Wind Farms, the farm has a nameplate capacity of 8.2 MW, containing four REpower Systems' MM82 turbines each rated at 2.05MW. [1]

In 2008 EDF accepted that it had failed to check the impact of the turbines on digital television reception, after residents of villages where the turbines lay on a line-of-sight to the local TV transmitter complained of a loss of signal strength and severe Freeview Digital Services disruption, particularly when the turbine blades rotate. [2] [3]

Related Research Articles

<span class="mw-page-title-main">EDF Energy</span> Energy company in the United Kingdom

EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF, with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses throughout the United Kingdom. It employs 11,717 people, and handles 5.22 million business and residential customer accounts.

<span class="mw-page-title-main">Wind power in the United Kingdom</span>

The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.

Ecotricity is a British energy company based in Stroud, Gloucestershire, England, specialising in selling green energy to consumers that it primarily generates from its 87.2 megawatt wind power portfolio. It is built on the principle of heavily reinvesting its profit in building more of its own green energy generation.

The Thanet Wind Farm is an offshore wind farm 7 miles (11 km) off the coast of Thanet district in Kent, England. On commissioning it was the world's largest offshore wind farm. It has a nameplate capacity of 300 MW and it cost £780–900 million (US$1.2–1.4 billion). Thanet is one of fifteen Round 2 wind projects announced by the Crown Estate in January 2004 but the first to be developed. It was officially opened on 23 September 2010, when it overtook Horns Rev 2 as the biggest offshore wind farm in the world. It has since been overtaken by many others.

<span class="mw-page-title-main">Greater Gabbard wind farm</span>

Greater Gabbard is a 504 MW wind farm, built on sandbanks 23 kilometres (14 mi) off the coast of Suffolk in England at a cost of £1.5 billion. It was completed on 7 September 2012 with all of the Siemens SWT3.6–107 turbines connected. Developed as a joint venture between Airtricity and Fluor, it is now jointly owned by SSE Renewables and Innogy.

<span class="mw-page-title-main">Blood Hill wind farm</span>

Blood Hill is a wind farm near Hemsby in Norfolk, England. It is the smallest windfarm owned by E.ON; taking up 3 hectares. It has a nameplate capacity of 2.25MW which is enough to power 1000 homes at peak. There were 10 Vestas V27-225 kW turbines which were 30 metres tall and stand on top of Blood Hill. They are visible from the villages of Hemsby and Winterton-on-Sea. Blood Hill began operating in December 1992 and was one of the first windfarms in the United Kingdom.

<span class="mw-page-title-main">Shiloh wind power plant</span>

The Shiloh wind power plant is a wind farm located in the Montezuma Hills of Solano County, California, USA, close to Bird's Landing and Collinsville, 40 miles (64 km) northeast of San Francisco. It has a nameplate capacity of 505 megawatts (MW) of power and was built in four stages between 2005 and 2012. Several additional projects are also located in the Montezuma.

<span class="mw-page-title-main">Burbo Bank Offshore Wind Farm</span>

The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.

<span class="mw-page-title-main">Kentish Flats Offshore Wind Farm</span>

The Kentish Flats Offshore Wind Farm is a wind farm located off the coast of Kent, England on a large, flat and shallow plateau just outside the main Thames shipping lanes. The wind farm is operated by Vattenfall.

<span class="mw-page-title-main">Blyth Harbour Wind Farm</span> Wind farm in East Bedlington, Blyth, Northumberland, England

Blyth Harbour Wind Farm is a coastal wind farm located in East Bedlington along the East Pier of the Port of Blyth. Commissioned in January 1993 it consists of nine 0.3 MW WindMaster turbines giving a total capacity of 2.7 MW. It was developed by AMEC Wind and is owned by Hainsford Developments Limited.

<span class="mw-page-title-main">Blyth Offshore Wind Farm</span>

Blyth Offshore Wind Farm was a small coastal wind farm located 0.5 miles (0.80 km) off the coast of Blyth, Northumberland, England.

Trimdon Grange Wind Farm is an onshore wind farm near Trimdon Grange, County Durham, England. Commissioned in October 2008 it consists of four 1.3 MW Nordex N60 turbines giving a total capacity of 5.2 MW. It was developed by EDF and is operated by Cumbria Wind Farms.

<span class="mw-page-title-main">Holmside Hall Wind Farm</span> Wind farm in County Durham, England

Holmside Hall Wind Farm is a wind farm near Stanley, County Durham, England. Owned and operated by E.ON UK, the farm has a nameplate capacity of 5.5MW, containing two NM80 turbines each rated at 2.75 MW.

<span class="mw-page-title-main">Great Eppleton Wind Farm</span>

Great Eppleton Wind Farm is a wind farm near Hetton-le-Hole, England. It is owned and operated by E.ON UK. Constructed in 1997, it was notable for originally consisting of twin-bladed turbines, as most wind turbines have three blades. On 29 September, E.ON announced it would replace these with four new REpower MM92 turbines giving a nameplate capacity of 8.2 MW.

GE Offshore Wind is a joint venture with Alstom and a subsidiary of GE Renewable Energy, created in 2015 when most of Alstom's electrical power and generation assets were acquired by General Electric. GE's stake in the joint venture is 50% plus 1 share.

Hoosier Wind Farm is a wind farm in Benton County, Indiana. It consists of 53 REpower 2 MW wind turbines, for a total nameplate capacity of 106 MW. The enXco subsidiary of EDF Energies Nouvelles built the wind farm, with Mortenson Construction's Renewable Energy Group as the subcontractor. Indianapolis Power & Light (IPL) has a 20-year contract to purchase and distribute the wind farm's output.

<span class="mw-page-title-main">Teesside Wind Farm</span> British offshore wind farm

Teesside Wind Farm, or alternatively referred to as Redcar Wind Farm, is a 27 turbine 62 MW capacity offshore wind farm constructed just to the east of the mouth of the River Tees and 1.5 km north of Redcar off the North Yorkshire coast, in the North Sea, England.

<span class="mw-page-title-main">Wind turbines on public display</span>

The great majority of wind turbines around the world belong to individuals or corporations who use them to generate electric power or to perform mechanical work. As such, wind turbines are primarily designed to be working devices. However, the large size and height above surroundings of modern industrial wind turbines, combined with their moving rotors, often makes them among the most conspicuous objects in their areas. A few localities have exploited the attention-getting nature of wind turbines by placing them on public display, either with visitor centers on their bases, or with viewing areas farther away. The wind turbines themselves are generally of conventional horizontal-axis, three-bladed design, and generate power to feed electrical grids, but they also serve the unconventional roles of technology demonstration, public relations, and education.

Navitus Bay Wind Park was a proposed 970 MW Round 3 offshore wind farm, to be situated off the English coast approximately 10 km south of Dorset and the Isle of Wight. The wind farm was refused planning permission in September 2015.

References

  1. Association, RenewableUK. "RenewableUK". Archived from the original on 2 November 2012.
  2. Wood, Kerry (6 November 2008). "Company admits wind farms ruined TV reception".
  3. "Freeview TV disruption in Langley park". Archived from the original on 28 March 2010. Retrieved 16 March 2010.