Operations and Checkout Building

Last updated
Operations and Checkout Building
Operations and Checkout Bldg.jpg
Aerial view of the Operations and Checkout building at KSC, c. 2017
USA Florida location map.svg
Red pog.svg
Usa edcp location map.svg
Red pog.svg
Location Brevard County, Florida, USA
Nearest city Titusville, Florida
Coordinates 28°31′26″N80°38′46″W / 28.52389°N 80.64611°W / 28.52389; -80.64611
Built1964
Architect Charles Luckman
Architectural style International
VisitationOpen, requires sponsorship by NASA employee
MPS John F. Kennedy Space Center MPS
NRHP reference No. 99001636 [1]
Added to NRHPJanuary 21, 2000

The Neil Armstrong Operations and Checkout Building (O&C) [2] (previously known as the Manned Spacecraft Operations Building) is a historic building on Merritt Island, Florida, United States. The five-story structure is in the Industrial Area of NASA's Kennedy Space Center. Its has twin-block facilities that include the crew quarter dormitories for astronauts, suit-up preparations prior to their flights, and the other is a large spacecraft workshop used for manufacturing and checking activities on crewed spacecraft. On January 21, 2000, it was added to the U.S. National Register of Historic Places.

Contents

Apollo program

During planning and construction, it was known as the Operations and Checkout Building. When it was finished in 1964, it was renamed the Manned Spacecraft Operations Building and was used to process spacecraft in the Gemini and Apollo era. It was reverted back to the Operations and Checkout Building during the Shuttle program, known informally as the O&C.

Altitude test chambers

The Apollo 1 crew, Gus Grissom, Ed White and Roger Chaffee, enter their spacecraft for a test in the O&C altitude chamber on October 18, 1966. Apollo 1 crew prepare to enter their spacecraft in the altitude chamber at Kennedy Space Center.jpg
The Apollo 1 crew, Gus Grissom, Ed White and Roger Chaffee, enter their spacecraft for a test in the O&C altitude chamber on October 18, 1966.

In 1965, a pair of altitude chambers were installed in the High Bay for testing the environmental and life support systems of both the Apollo Command/Service Module and Lunar Module at simulated altitudes of up to 250,000 feet (76 km). Each chamber is 58 feet (18 m) high (with a clear working height of 28 feet (8.5 m)) and an interior diameter of 33 feet (10 m), [3] were human-rated, and capable of reaching the maximum altitude (minimum pressure) in one hour. These were used by the prime and backup crews of all crewed missions, from the ill-fated Apollo 1 in October 1966, through to the Apollo-Soyuz Test Project in July 1975. [4]

Post-Apollo use

During the 1980s and 90s the O&C building was used to house and test Spacelab science modules before their flights aboard the Space Shuttle.

In the late 1990s and 2000s, some modules and trusses for the International Space Station were checked out in the building.

On January 30, 2007, NASA held a ceremony to mark the transition of the building's high bay for use by the Constellation program. The building would serve as the final assembly facility for the Orion crew exploration vehicle. [5] In preparation for the transition, the state of Florida provided funds to clear the facility of about 50 short tons (45 metric tons) of steel stands, structures and equipment. [6] Renovations totaling $55 million took place from June 2007 through January 2009, [7] at which point Lockheed Martin became the operator of the facility for Orion production. [8] The Orion spacecraft for Artemis 1 completed its assembly in this location and was moved to the Multi-Payload Processing Facility on January 16, 2021. [9] The Crew Module of the Orion spacecraft for Artemis 2 is under assembly in the building's high bay as of August 28, 2021. [10]

The building was renamed to the Neil Armstrong Operations and Checkout Building in a ceremony on the 45th anniversary of Apollo 11 (2014). [11]

Notes

  1. "National Register Information System". National Register of Historic Places . National Park Service. July 9, 2010.
  2. "Image-STS-26 crewmembers leave KSC O&C Bldg on their way to the launch pad". NASA. Retrieved November 12, 2022.
  3. Craig, Kay (2011-06-14). "KSC Technical Capabilities: O&C Altitude Chambers". NASA.gov. Archived from the original on 2012-03-28. Retrieved 2011-07-29.
  4. Slovinac, Patricia (December 2009). "Cape Canaveral Air Force Station, Launch Complex 39, Altitude Chambers" (PDF). Historic American Engineering Record. Washington, D.C.: Library of Congress. pp. 1–2. Retrieved 2022-11-12.
  5. Young, Tracy (2007-01-24). "NASA Invites Media to Ceremony Marking Transition to Constellation". NASA.gov. Retrieved 2009-08-06.
  6. Marconi, Elaine (2007-02-09). "NASA's next step to prepare for a new era of exploration" (PDF). Spaceport News. NASA. 46 (3): 2. Retrieved 2009-08-06.
  7. "Operations and Checkout Building High Bay Ready for Orion Processing". NASA. February 4, 2009. Retrieved 5 November 2015.
  8. "KENNEDY SPACE CENTER'S ANNUAL REPORT FY2008" (PDF). NASA's Kennedy Space Center. Retrieved 5 November 2015.
  9. "Artemis I Orion Moves For Fueling, Next Step in Launch Preparations". NASA. January 16, 2021. Retrieved 28 August 2021.
  10. "Cabin Checks Underway to Keep Crew Breathing Easy on Artemis II". February 12, 2021. Retrieved 28 August 2021.
  11. Dean, James (July 22, 2014). "Neil Armstrong Legacy Adds Honor". Florida Today. Cocoa, Florida. p. A1 via Newspapers.com.

Related Research Articles

<span class="mw-page-title-main">Apollo program</span> 1961–1972 American crewed lunar exploration program

The Apollo program, also known as Project Apollo, was the third United States human spaceflight program carried out by the National Aeronautics and Space Administration (NASA), which succeeded in preparing and landing the first humans on the Moon from 1968 to 1972. It was first conceived in 1960 during President Dwight D. Eisenhower's administration as a three-person spacecraft to follow the one-person Project Mercury, which put the first Americans in space. Apollo was later dedicated to President John F. Kennedy's national goal for the 1960s of "landing a man on the Moon and returning him safely to the Earth" in an address to Congress on May 25, 1961. It was the third US human spaceflight program to fly, preceded by the two-person Project Gemini conceived in 1961 to extend spaceflight capability in support of Apollo.

<span class="mw-page-title-main">Apollo 9</span> 3rd crewed mission of the Apollo space program

Apollo 9 was the third human spaceflight in NASA's Apollo program. Flown in low Earth orbit, it was the second crewed Apollo mission that the United States launched via a Saturn V rocket, and was the first flight of the full Apollo spacecraft: the command and service module (CSM) with the Lunar Module (LM). The mission was flown to qualify the LM for lunar orbit operations in preparation for the first Moon landing by demonstrating its descent and ascent propulsion systems, showing that its crew could fly it independently, then rendezvous and dock with the CSM again, as would be required for the first crewed lunar landing. Other objectives of the flight included firing the LM descent engine to propel the spacecraft stack as a backup mode, and use of the portable life support system backpack outside the LM cabin.

<span class="mw-page-title-main">Apollo 1</span> Planned United States spaceflight destroyed by accidental fire (1967)

Apollo 1, initially designated AS-204, was planned to be the first crewed mission of the Apollo program, the American undertaking to land the first man on the Moon. It was planned to launch on February 21, 1967, as the first low Earth orbital test of the Apollo command and service module. The mission never flew; a cabin fire during a launch rehearsal test at Cape Kennedy Air Force Station Launch Complex 34 on January 27 killed all three crew members—Command Pilot Gus Grissom, Senior Pilot Ed White, and Pilot Roger B. Chaffee—and destroyed the command module (CM). The name Apollo 1, chosen by the crew, was made official by NASA in their honor after the fire.

<span class="mw-page-title-main">Kennedy Space Center</span> United States space launch site in Florida

The John F. Kennedy Space Center, located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968, KSC has been NASA's primary launch center of human spaceflight. Launch operations for the Apollo, Skylab and Space Shuttle programs were carried out from Kennedy Space Center Launch Complex 39 and managed by KSC. Located on the east coast of Florida, KSC is adjacent to Cape Canaveral Space Force Station (CCSFS). The management of the two entities work very closely together, share resources and operate facilities on each other's property.

<span class="mw-page-title-main">Space Shuttle program</span> 1972–2011 United States human spaceflight program

The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011. Its official name, Space Transportation System (STS), was taken from a 1969 plan for a system of reusable spacecraft of which it was the only item funded for development. It flew 135 missions and carried 355 astronauts from 16 countries, many on multiple trips.

<span class="mw-page-title-main">Apollo 4</span> First test flight of the Apollo Saturn V rocket

Apollo 4, also known as SA-501, was the uncrewed first test flight of the Saturn V launch vehicle, the rocket that eventually took astronauts to the Moon. The space vehicle was assembled in the Vehicle Assembly Building, and was the first to be launched from Kennedy Space Center (KSC) in Florida, ascending from Launch Complex 39, where facilities built specially for the Saturn V had been constructed.

<span class="mw-page-title-main">Project Gemini</span> 1961–1966 US human spaceflight program

Project Gemini was NASA's second human spaceflight program. Conducted between projects Mercury and Apollo, Gemini started in 1961 and concluded in 1966. The Gemini spacecraft carried a two-astronaut crew. Ten Gemini crews and 16 individual astronauts flew low Earth orbit (LEO) missions during 1965 and 1966.

<span class="mw-page-title-main">Kennedy Space Center Launch Complex 39</span> Historic Apollo Moonport

Launch Complex 39 (LC-39) is a rocket launch site at the John F. Kennedy Space Center on Merritt Island in Florida, United States. The site and its collection of facilities were originally built as the Apollo program's "Moonport" and later modified for the Space Shuttle program.

<span class="mw-page-title-main">Kennedy Space Center Visitor Complex</span> Science museum on Merritt Island, Florida

The Kennedy Space Center Visitor Complex is the visitor center at NASA's Kennedy Space Center on Merritt Island, Florida. It features exhibits and displays, historic spacecraft and memorabilia, shows, two IMAX theaters, and a range of bus tours of the spaceport. The "Space Shuttle Atlantis" exhibit contains the Atlantis orbiter and the Shuttle Launch Experience, a simulated ride into space. The center also provides astronaut training experiences, including a multi-axial chair and Mars Base simulator. The visitor complex also has daily presentations from a veteran NASA astronaut. A bus tour, included with admission, encompasses the separate Apollo/Saturn V Center. There were 1.7 million visitors to the visitor complex in 2016.

<span class="mw-page-title-main">Launch Control Center</span> United States historic place

The Rocco A. Petrone Launch Control Center is a four-story building at NASA's Kennedy Space Center on Merritt Island, Florida, used to manage launches of launch vehicles from Kennedy Space Center Launch Complex 39. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking, and instrumentation equipment; and firing rooms.

<span class="mw-page-title-main">Astronaut transfer van</span> Vehicle used to transport astronauts at the Kennedy Space center

The astronaut transfer van, known as the Astrovan during the Space Shuttle era, was a NASA vehicle used at the Kennedy Space Center to transport astronauts from the Operations and Checkout Building to the launch pad before a mission and for launch dress rehearsals, and back to the Operations and Checkout Building following a shuttle landing.

<span class="mw-page-title-main">Launch Complex 39 Press Site</span> United States historic place

The Launch Complex 39 Press Site is a news media facility at Launch Complex 39 at the John F. Kennedy Space Center (KSC) on Merritt Island, Florida where journalists have observed every U.S. crewed space launch since Apollo 8 in 1968. The site is just south of the Vehicle Assembly Building (VAB); 3 miles (4.8 km) west-southwest of Pad A, and 3.4 miles (5.4 km) southwest of Pad B.

<span class="mw-page-title-main">Kennedy Space Center Launch Complex 39B</span> Historic launch pad operated by NASA

Launch Complex 39B (LC-39B) is the second of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39A, was first designed for the Saturn V launch vehicle, which at the time was the United States' most powerful rocket. Typically used to launch NASA's crewed spaceflight missions since the late 1960s, the pad is currently configured for use by the agency's Space Launch System rocket, a Shuttle-derived launch vehicle which is currently used in the Artemis program and subsequent Moon to Mars campaigns. The pad had also been leased by NASA to aerospace company Northrop Grumman, for use as a launch site for their Shuttle-derived OmegA launch vehicle, for National Security Space Launch flights and commercial launches, before the OmegA program was cancelled.

<span class="mw-page-title-main">Paul C. Donnelly</span> American aerospace pioneer (1923–2014)

Paul Charles Donnelly was an American guided missile pioneer and a senior NASA manager during the Apollo Moon landing program at the Kennedy Space Center (KSC). Responsible for the checkout of all Apollo launch vehicles and spacecraft, he was also involved in every U.S. manned launch from Alan Shepard's Mercury suborbital flight in 1961 through the tenth Space Shuttle mission (STS-41B) in 1984.

<span class="mw-page-title-main">Space Shuttle retirement</span> End of NASAs Space Shuttle spacecraft system in 2011

The retirement of NASA's Space Shuttle fleet took place from March to July 2011. Discovery was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; Endeavour did so on June 1. The final shuttle mission was completed with the landing of Atlantis on July 21, 2011, closing the 30-year Space Shuttle program.

<span class="mw-page-title-main">Orion (spacecraft)</span> American–European spacecraft class for the Artemis program

Orion is a partially reusable crewed spacecraft used in NASA's Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the European Service Module (ESM) manufactured by Airbus Defence and Space. Capable of supporting a crew of six beyond low Earth orbit, Orion can last up to 21 days undocked and up to six months docked. It is equipped with solar panels, an automated docking system, and glass cockpit interfaces modeled after those used in the Boeing 787 Dreamliner. A single AJ10 engine provides the spacecraft's primary propulsion, while eight R-4D-11 engines, and six pods of custom reaction control system engines developed by Airbus, provide the spacecraft's secondary propulsion. Although compatible with other launch vehicles, Orion is primarily intended to launch atop a Space Launch System (SLS) rocket, with a tower launch escape system.

<span class="mw-page-title-main">Exploration Flight Test-1</span> 2014 unmanned test flight of the Orion spacecraft by NASA

Exploration Flight Test-1 or EFT-1 was the first test flight of the crew module portion of the Orion Multi-Purpose Crew Vehicle. Without a crew, it was launched on December 5, 2014, at 12:05 UTC, by a Delta IV Heavy rocket from Space Launch Complex 37B at Cape Canaveral Space Force Station.

<span class="mw-page-title-main">European Service Module</span> Primary power and propulsion component of the Orion spacecraft

The European Service Module (ESM) is the service module component of the Orion spacecraft, serving as its primary power and propulsion component until it is discarded at the end of each mission. In January 2013, NASA announced that the European Space Agency (ESA) will contribute the service module for Artemis 1, based on the ESA's Automated Transfer Vehicle (ATV). It was delivered by Airbus Defence and Space in Bremen, in northern Germany to NASA at the end of 2018. After approval of the first module, the ESA will provide the ESMs from Artemis 2 to Artemis 6.

<span class="mw-page-title-main">Artemis 2</span> Artemis programs second lunar flight

Artemis 2 is the second scheduled mission of NASA's Artemis program and the first scheduled crewed mission of NASA's Orion spacecraft, currently planned to be launched by the Space Launch System (SLS) in November 2024. The crewed Orion spacecraft will perform a lunar flyby and return to Earth. Artemis 2 is planned to be the first crewed spacecraft to travel to the Moon, and beyond low Earth orbit, since Apollo 17 in 1972.