Vande Bharat (sleeper trainset)

Last updated

Vande Bharat sleeper trainset
Vande Bharat sleeper trainset concept.jpg
Artist's impression of the Vande Bharat sleeper trainset
Stock typeElectric Multiple Unit
Manufacturer BEML, Integral Coach Factory
Operators Indian Railways
Specifications
Car body constructionLight-weight Stainless steel and Aluminium
DoorsAutomatic
Maximum speed220 km/h (140 mph) [1]
Power supply 25 kV 50 Hz AC
Braking system(s) Air, Regenerative braking
Safety system(s) Kavach (train protection system)
Track gauge 5 ft 6 in (1,676 mm) broad gauge

The Vande Bharat sleeper trainset, formerly known as Train-20 is an under development high-speed, long-distance electric multiple unit (EMU) train designed to replace the Rajdhani Express. It is being developed based on existing short-distance Vande Bharat, differing in exterior body, sleeping berths, and onboard amenities due to its long-distance service.

Contents

This train was earlier planned to have featured two distinctive classes, the air-conditioned chair car and sleeper car. The sleeper cars would have included AC first class, AC two-tier and AC three-tier sub-classes. [2] [3] However, these plans were shelved after the tenders were red flagged.[ citation needed ] A series of fresh tenders were launched in 2022 and the contracts for which were awarded in 2023.

Following the renaming of Train-18 as Vande Bharat Express, any mentions of Train-20 were stopped. It is currently known as Vande Bharat Sleeper. [4] It is estimated that the prototype of Vande Bharat Sleeper would be launched in Q1/Q2 of 2024 and it would start it's operations in the beginning of 2025. [5] [6]

Background

Long-distance (over 1,000 km (620 mi)) train travel in India takes more than twelve hours to complete, making it hectic for the commuters. For example, the Mumbai Rajdhani Express between Mumbai and New Delhi takes about 15 hours and 32 minutes to complete the 1,386 km (861 mi) journey. Thus the introduction of a semi-high-speed train with modern coaches could reduce the travel time significantly. [7] Hence Indian Railways began to upgrade the tracks as well as plan for new trainsets that could match the passenger rail standards operated across the developed world. [3]

India began to develop its next generation EMU trainsets named Train-18 which were composed of chair class coaches and were intended to replace short distance services of Shatabdi Express. During the design phase of this train in 2018, Indian Railways had also planned to introduce a long-distance, sleeper version to replace the half a century old Rajdhani Express. [8] [9] The EMU train with aluminium coaches, a first of its kind in India, was estimated to cost 2,500 crore (US$310 million). It was expected to roll out by 2020, hence it was named "Train-20" similar to its counterpart, the Vande Bharat, which was initially called "Train-18". [10]

History

Initial plans and cancellation

During the initial plans for the trainset, the designers felt that an aluminium body would make it lighter, energy efficient, and aesthetically 'better looking'. Companies from Japan, China, and Europe were said to be in the race to win the bid for the design consultancy contract for Train-20. The tender as said by the officials was supposed to be finalised by mid-February, 2018. Integral Coach Factory (ICF) planned to build two train rakes by 2020 and thereafter add 24 more trains to the service in the future. [11] Although the pre-bid conference had attracted around seven global players, the Stadler-Medha consortium emerged as the sole bidder after final submission. Others lacked a pre-condition which said that the manufacturer should have an existing manufacturing facility in India. The authorities then began to examine the bid submitted by the Swiss consortium. [12]

In July 2018, the Nallasopara-Virar train shed which was built by Mumbai Rail Vikas Corporation, emerged as a shed that could likely maintain the Train-20 rakes. Western Railways was likely to operate the train's first service, potentially between Mumbai and New Delhi. [13]

Later in 2018, Indian Railways received a rap from the Department of Industrial Policy and Promotion which red-flagged the initial tender, stating that it was not in line with India's ambitious 'Make in India' project. Hence, a brand new tender was said to be floated with reworked conditions that would also take care of the interests of domestic manufacturers. [14]

Fresh plans

In 2022, the Government of India floated fresh tenders to construct 200 new sleeper-class trainsets. [4] In March 2023, they announced that the contract for the production of the trains was awarded to Kinet Railway Systems, the consortium comprising RVNL (Indian enterprise) and TMH (a Russian rolling stock company) which emerged as the lowest bidder with 120 crore (US$15 million) per trainset. [15] RVNL-TMH consortium, the lowest bidder would manufacture a total of 120 trainsets while the second lowest bidder would manufacture the remainder of 80 sets. [16] A month later, BHEL-Titagarh Wagons consortium bagged the contract to manufacture the remainder of 80 trainsets at the same price, for six years. [17] The commercial production of these sets was slated to begin in June 2025. [18]

Apart from the tenders for 200 trainsets with stainless steel bodies, there were tenders floated in the same year for the manufacturing and maintenance of 100 aluminium body trainsets, for which, Alstom, the French rolling stock manufacturing company emerged as the lowest bidder with 150.9 crore (US$19 million) per trainset. The aluminium body was chosen for its lighter weight relative to the stainless steel. [19]

In August 2023, the Russian TMH, part of the RVNL-TMH consortium, submitted a performance bank guarantee of 200 crore (US$25 million) thus ending all the speculations of the bid's failure. As per the bid, the consortium would manufacture the 120 trainsets in the Indian Railways facility at Latur and would maintain the sets for 35 years. [20] [21]

Production

OrganisationBid per trainsetTrainsetsBody
ICF-BEMLUnknown10Stainless steel
RVNL-TMH120 crore (US$15 million)120
BHEL-Titagarh80
Alstom150.9 crore (US$19 million)100Aluminium

As of April 2024, one Vande Bharat sleeper prototype is under construction at ICF-BEML facility in Bengaluru. [22] ICF-BEML were slated to manufacture 10 such trainsets. [23] A total of 200 Vande Bharat sleeper trainsets are planned. [22] Trial runs for the trainsets have been scheduled for May 2024. [24] [25]

Engineering

The 16-coach electric multiple unit trainset is planned to have eleven AC three-tier coaches, four AC two-tier coaches, and one AC first-class coach. The train with a carrying capacity of 887 is slated to operate at speeds up to 160 km/h (99 mph). Like its seating-only counterpart, the train has an aerodynamic design which helps in countering drag at higher speeds. Driver cabins at both ends enable quick turnaround of the train at terminal stations. The presence of motorised systems in alternative coaches will enable a quick acceleration and deceleration rates of 0.7–0.8 m/s2 (2.3–2.6 ft/s2). [26]

According to the first glimpses of the trainset's renders shared on social media, [27] the interiors revealed a modernised design relative to the existing services. The designs were created in collaboration between ICF and BEML. Propulsion will be supplied by ICF, with the assembly of the entire train to be carried out at BEML. [28]

The fully air-conditioned train will have inter-communicative automatic doors. The coaches are designed to have better coupling to reduce jerks, and with improved soundproofing, it is expected to offer a comfortable ride. Every coach will be equipped with a small pantry as well as a sensor-based lighting system in the common areas. 'Soft lighting' will be used to provide a modern ambience. The train will have bunk beds with ladders. [23] The beds will be designed to be broader, comfortable and better cushioned relative to the existing services. Out of 857 berths, 823 will be reserved for the passengers with the remaining 34 designated for the onboard staff. Some of the berths will be disabled-friendly. [29]

There would be three ergonomically designed restrooms per coach, with one of them being designed for the differently abled. These restrooms are equipped with odour control systems, and the wash basins in them are being designed to have anti-spill features. Since this train is intended for long distance journeys, spacious room for luggage will be provided. Public announcement systems and visual information systems will help in guiding the passengers. A hot shower facility will be exclusively provided for passengers in the first AC. [30]

See also

Related Research Articles

<span class="mw-page-title-main">Rail transport in India</span> Mode of transport in India

Rail transport in India consists of primarily of passenger and freight shipments along an integrated rail network. Indian Railways (IR), a statutory body under the ownership of the Ministry of Railways of the Government of India, operates India's national railway system. It is the primary owner and operator of rail operations throughout the country including suburban rail in major metros.

<span class="mw-page-title-main">Rajdhani Express</span> Series of Express trains in India

The Rajdhani Express is a series of passenger train services in India operated by Indian Railways connecting the national capital New Delhi with the capitals or the largest cities of various states. Rajdhani, derived from the Sanskrit means "capital". Introduced in 1969, the trains are amongst the premium services operated by Indian Railways and regularly get a higher priority on the railway network.

<span class="mw-page-title-main">Indian Railways</span> Government of India statutory body

Indian Railways (IR) is a statutory body under the ownership of the Ministry of Railways of the Government of India that operates India's national railway system. As of 2023, it manages the fourth largest national railway system by size with a running track length of 104,647 km (65,025 mi) and route length of 68,426 km (42,518 mi) of which 60,451 km (37,563 mi) is electrified. With more than 1.2 million employees, it is the world's ninth-largest employer and India's second largest employer.

<span class="mw-page-title-main">Bharat Heavy Electricals Limited</span> Indian government-owned manufacturer

Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking and the largest government-owned power generation equipment manufacturer. It is owned by the Government of India, with administrative control by the Ministry of Heavy Industries. Established in 1956 with the help of Soviet technology, BHEL is based in New Delhi.

<span class="mw-page-title-main">Integral Coach Factory</span> Rolling stock production unit under Ministry of Railways (India)

Integral Coach Factory is an Indian manufacturer of rail coaches. Established in 1955, it is located in Perambur in Chennai and is the largest rail coach manufacturer in the world. It is owned and operated by the Indian Railways and is the oldest amongst the five rake production units of the Indian Railways. While the facility initially manufactured ICF coaches, it currently manufactures LHB coaches and electric multiple units including the semi-high speed Vande Bharat train-sets.

<span class="mw-page-title-main">BEML</span> Indian heavy equipment manufacturer

BEML Limited, formerly Bharat Earth Movers Limited, is an Indian public sector undertaking which manufactures a variety of heavy equipment, such as that used for earth moving, railways, transport and mining. It is headquartered in Bangalore. BEML is Asia's second-largest manufacturer of earth moving equipment. Its stock trades on the National Stock Exchange of India under the symbol "BEML", and on the Bombay Stock Exchange under the code "500048".

Indian Railways coaching stock consists of various travel class passenger coaches, freight wagons apart from specialized and dedicated coaching stock for other uses. Indian Railways operates India's railway system and comes under the purview of the Ministry of Railways of Government of India. As of 2022, it operates over 8000 trains daily with a inventory of 318,196 freight wagons and 84,863 passenger coaches. The rolling stock is manufactured by five units owned by Indian Railways, four public sector units and one private company.

<span class="mw-page-title-main">Transmashholding</span> Russian rolling stock manufacturer

CJSC Transmashholding is the largest manufacturer of locomotives and rail equipment in Russia and after merging with LocoTech service the fourth largest engineering company in the field of transport technology globally.

<span class="mw-page-title-main">High-speed rail in India</span> Overview of High-speed rail in India

Indian Railways operates India's railway system and comes under the purview of the Ministry of Railways of Government of India. As of 2023, it maintains over 108,706 km (67,547 mi) of tracks and operates over 13,000 trains daily. According to the Ministry of Railways, a route capable of supporting trains operating at more than 160 km/h (100 mph) is considered as a higher speed or semi-high speed rail line.

<span class="mw-page-title-main">ICF coach</span> Type of coach used by Indian Railways

The Integral Coach Factory (ICF) coach is a conventional passenger coach used on the majority of Indian Railways (IR) lines. Between 1955 and 2018, more than 54,000 were produced and some were exported to other countries. The coaches are to be phased out by 2030.

<span class="mw-page-title-main">MEMU</span> Electric multiple unit trains in India

In Indian Railways, A MEMU is an electric multiple unit (EMU) train that serves short and medium-distance routes in India, as compared to normal EMU trains that connect urban and suburban areas. The acronym stands for Mainline Electric Multiple Unit.

<span class="mw-page-title-main">Express trains in India</span> List of express trains of India

India has a system of express trains, operated by Indian Railways which comes under the purview of the Ministry of Railways of Government of India. As of 2023, it maintains over 108,706 km (67,547 mi) of tracks and operates nearly 3,000 express trains daily. According to the Ministry of Railways, express trains travel faster and have limited stops than ordinary passenger trains. Any passenger train with an average speed higher than 55 km/h (34 mph) is considered super-fast.

<span class="mw-page-title-main">LHB coach</span> Type of coach used by Indian Railways

Linke-Hofmann-Busch (LHB) coach is a passenger coach of Indian Railways that is developed by Linke-Hofmann-Busch of Germany and produced by rail coach manufacturing units at Kapurthala, Chennai and Raebareli. They have been used since 2000 on the 1,676 mm broad gauge network of Indian railways. Initially, 24 air-conditioned coaches were imported from Germany for use in the Shatabdi Expresses, following which, the Rail Coach Factory started manufacturing after technology transfer. IR declared that all ICF coaches will be replaced by LHB coaches to provide more safety and comfort. The last ICF Coach was flagged off on 19 January 2018, making way for LHB Coaches to be used for all new coaches to be introduced by Indian Railways in the future.

The Indian Government is undertaking several initiatives to upgrade its aging railway infrastructure and enhance its quality of service. The Railway Ministry has announced plans to invest 5,400,000 crore to upgrade the railways by 2030. Upgrades include 100% electrification of railways, upgrading existing lines with more facilities and higher speeds, expansion of new lines, upgrading railway stations, introducing and eventually developing a large high-speed train network interconnecting major cities in different parts of India and development of various dedicated freight corridors to cut down cargo costs within the country.

<span class="mw-page-title-main">Titagarh Rail Systems</span> Indian rolling stock manufacturer

Titagarh Rail Systems Limited, formerly known as Titagarh Wagons Limited, is an Indian rolling stock manufacturer in the private sector. Established in 1984 as a rolling stock foundry unit, the company's headquarters are situated in Kolkata, West Bengal. Titagarh is publicly traded on both the Bombay Stock Exchange (BSE) and National Stock Exchange (NSE).

<span class="mw-page-title-main">Vande Bharat Express</span> Series of Indian semi-high speed EMU train services

Vande Bharat Express is a medium-distance superfast express service operated by Indian Railways. It is a reserved, air-conditioned chair car service connecting cities that are less than 800 km (500 mi) apart or take less than ten hours to travel with existing services. The train entered commercial service on 15 February 2019.

<span class="mw-page-title-main">Bilaspur–Nagpur Vande Bharat Express</span> Vande Bharat Express train route in India

The 20825/20826 Bilaspur - Nagpur Vande Bharat Express is India's 6th Vande Bharat Express train, connecting the states of Chhattisgarh and Maharashtra.

<span class="mw-page-title-main">Vande Bharat (trainset)</span> Indian semi-high-speed EMU trainsets

The Vande Bharat trainset, formerly known as Train 18, is an Indian electric multiple unit chair car trainset designed and developed by Indian Railways at its Integral Coach Factory in Chennai. The train achieved a maximum speed of 183 km/h (114 mph) during its trial runs but the operational speed of the train is restricted to 160 km/h (99 mph) due to tracks' inability to support such speeds.

<span class="mw-page-title-main">Amrit Bharat (trainset)</span> Indian push-pull trainsets

Amrit Bharat is an Indian push-pull train, designed and developed by Indian Railways at its Integral Coach Factory in Chennai. It has non-air-conditioned three-tier sleeper and unreserved coaches.

<span class="mw-page-title-main">Amrit Bharat Express</span> Series of Push-Pull configured Superfast Express train services in India

The Amrit Bharat Express is a superfast express service operated by Indian Railways. It is a non-air-conditioned, low-cost, sleeper cum unreserved service connecting cities that are more than 800 km (500 mi) apart or take more than ten hours to travel with existing services. The trainset consists of two locomotives, one on either side and 22 coaches with a maximum operating speed of 110–130 km/h (68–81 mph). The train entered commercial service on 1 January 2024.

References

  1. "Sleeper version of Vande Bharat train to be designed to travel at 220 kmph". Business Standard. 19 January 2023. Retrieved 22 May 2023.
  2. "Accommodation Classes in Indian Railways". Indian Railways. Archived from the original on 26 April 2017. Retrieved 15 November 2016.
  3. 1 2 "Indian railways to unleash world-class semi-speed trains by 2020". The Better India. 13 October 2017.
  4. 1 2 Dipak K Dash (27 April 2022). "Railways invites bids for 200 Vande Bharat trains with sleeper coaches for long-distance travel". The Times of India. Retrieved 29 April 2023.
  5. "Faster than Rajdhani, Vande Bharat sleeper trains to be rolled out by 2025". Hindustan Times. 4 February 2024. Retrieved 5 February 2024.
  6. "MCF to roll out sleeper coaches for Vande Bharat". The Times of India. 2 February 2024. ISSN   0971-8257 . Retrieved 5 February 2024.
  7. "Six reasons why Indian trains are appallingly slow". First post. 8 July 2014.
  8. "Train-18 country's first engine-less train rolled out; Train 20 next". The Economic Times. 29 October 2018.
  9. "Train-20: Aluminium-bodied trainsets to run on Rajdhani routes". The News Minute. 25 December 2017.
  10. "Train-20: Aluminium-bodied trainsets for Rajdhani routes". Free Press Journal. 26 December 2017.
  11. "Engine-less train: 160 kmph Train 18 to be out in June, Train 20 in 2020". The Indian Express. 23 January 2018.
  12. "Lone bidder for ambitious Rs 2,700 crore Train-20 project". The Week. 14 February 2018.
  13. "Indian Railways' self-propelled modern T-20 train sets may be maintained in Nallasopara-Virar: Report". The Financial Express. 9 July 2018.
  14. "Train 20: World-class semi-high speed train sets to replace Indian Railways Rajdhani Express; know about them". The Financial Express. 8 August 2018.
  15. "Sleeper Edition Vande Bharat Express: Indian Railways Issues Contract Award Letter for Production of 120 Trains". 30 March 2023.
  16. "Vande Bharat Express: Who emerged as the lowest bidder for manufacturing sleeper versions of India's semi-high-speed train? Details here". Financialexpress. 2 March 2023. Retrieved 1 December 2023.
  17. "BHEL-led consortium bags order to supply 80 sleeper class Vande Bharat trains worth over Rs 9,600 crore". The Economic Times. 12 April 2023. ISSN   0013-0389 . Retrieved 1 December 2023.
  18. "Vande Bharat sleeper train commercial production at TRSL's Bengal plant from June 2025". The Economic Times. 25 July 2023. ISSN   0013-0389 . Retrieved 1 December 2023.
  19. Bureau, The Hindu (31 May 2023). "French company Alstom to make 100 Vande Bharat trains with sleeper coaches". The Hindu. ISSN   0971-751X . Retrieved 1 December 2023.
  20. Das, Arun Kumar (28 August 2023). "Russian Major TMH Deposits Rs 200 Crore As Bank Guarantee For Making 120 Vande Bharat Sleeper Trains In Partnership With RVNL". India Infra Hub. Retrieved 7 December 2023.
  21. "Plan for Vande Bharat sleeper trains on track as Russian rolling stock major deposits bank guarantee". The Times of India. 29 August 2023. ISSN   0971-8257 . Retrieved 7 December 2023.
  22. 1 2 "Indian Railways' big 100-day plan: Vande Bharat sleeper, bullet train, J&K rail project with Chenab bridge & more - check details". The Times of India. 4 April 2024. ISSN   0971-8257 . Retrieved 4 April 2024.
  23. 1 2 "Vande Bharat sleeper trains to have a "wow" factor never seen before on Indian Railways; details here". The Times of India. 13 October 2023. ISSN   0971-8257 . Retrieved 7 December 2023.
  24. Reporter, Staff (29 April 2024). "Vande Bharat Metro Trial Runs Expected In July - Metro Rail News" . Retrieved 29 April 2024.
  25. "Vande Bharat Metro trial run in July, Vande Bharat Sleeper in May". News9live. 29 April 2024. Retrieved 29 April 2024.
  26. "Specification and standards of Vande Bharat trains" (PDF). indianrailways. 27 April 2022. Retrieved 4 June 2023.
  27. @AshwiniVaishnaw (3 October 2023). "Concept train - Vande Bharat (sleeper version) Coming soon… early 2024" (Tweet) via Twitter.
  28. "Vande Bharat sleeper coach: Ashwini Vaishnaw shares new photos, rollout in 2024". mint. 3 October 2023. Retrieved 7 December 2023.
  29. "Vande Bharat Sleeper Trains: Features To Design, All You Need To Know". NDTV.com. Retrieved 7 December 2023.
  30. "Exclusive: How Will Vande Bharat Sleeper Train Be Better Than The Rajdhani Express? Top Passenger-Friendly Features To Know". Times of India. 10 January 2024.