Overview | |||
Locale | Xi'an and Xianyang | ||
Transit type | Rapid transit | ||
Number of lines | 9 | ||
Number of stations | 212 | ||
Daily ridership | 2.8 million (2021 average) [1] | ||
Annual ridership | 1.0 billion (2021) [1] | ||
Operation | |||
Began operation | 16 September 2011 | ||
Operator(s) | Xi'an Rail Transit Group Co., Ltd. | ||
Technical | |||
System length | 311 km (193 mi) | ||
Track gauge | 1435 mm (standard gauge) | ||
|
Xi'an Metro | |||||||
---|---|---|---|---|---|---|---|
Traditional Chinese | 西安地鐵 | ||||||
Simplified Chinese | 西安地铁 | ||||||
|
The Xi'an Metro,also known as the Xi'an Rail Transit,is a rapid transit system in the city of Xi'an and the neighbouring city of Xianyang,in Shaanxi province,China.
The system has 9 lines in operation. Line 2 opened to the public on September 16,2011. [2] Line 1 began operation on September 15,2013. Line 3 began operation after months of delay on November 8,2016. Line 4 opened on December 26,2018. Lines 5,6,9 opened in December 2020. Line 14 opened in September 2019 and extended in June 2021. Line 16 opened on June 27,2023. [3]
Initial proposals for a subway in Xi'an were created in the 70s which called for the Xi'an City Wall to be demolished to make way for a ring subway line. This was similar to what was done to create Beijing Subway Line 2,but the plan was scrapped due to successful opposition by preservationists and lack of funding for the project. [4] Later,Xi'an began its planning a multiline metro system in the mid-1980s. The plan was first submitted to the State Council in 1994,with four planned lines and a total length of 73.2 km (45.5 mi). In February 2004,the re-drafted plan was submitted to the State Government,which received final approval on September 13,2006.
The first line,Line 2,began construction along Chang'an Street on 29 September 2006 and was completed in 2011. It runs north–south and passes under such historic sites as the Bell Tower and the Xi'an City Wall. It is 26.6 km (16.5 mi) long with 23.5 km (14.6 mi) lying underground,approximately 20 metres (65 ft 7 in) below the surface. It is estimated to have cost 17.9 billion yuan (US$2.24 billion). [5] The route stretches from the Beikezhan to Weiqunan with 20 stops. The travel time is 39 minutes for the entire length,cutting the commute almost in half. Operations began on 28 September 2011.[ citation needed ]
Four other routes were planned to start construction in 2011 and to be finished by around 2020. When completed,the system will span 251.8 km (156.5 mi) and will mainly service the urban and suburban districts of Xi'an and part of Xianyang. [6]
On June 12,2019,the NDRC approved the Phase III (2018-2024) Construction Plan of Xi'an Metro. The plan includes Line 1 (Phase 3),Line 2 (Phase 2),Line 8,Line 10 (Phase 1),Line 14,Line 15 (Phase 1),Line 16 (Phase 1). The total length of Xi'an Metro will be 423 kilometres (263 mi) in 2024. [7]
Line | Terminals (District) | Commencement | Newest Extension | Length km | Stations | Operators | |
---|---|---|---|---|---|---|---|
1 | Xianyangxizhan (Qindu,Xianyang) | Fangzhicheng (Baqiao) | 2013 | 2023 | 41.45 [8] | 30 | |
2 | Caotan (Weiyang) | Changninggong (Chang'an) | 2011 | 2023 | 33.637 [9] [10] | 25 | |
3 | Yuhuazhai (Yanta) | Baoshuiqu (Baqiao) | 2016 | — | 39.15 | 26 | |
4 | Xi'an Beizhan (Weiyang) | Hangtian Xincheng (Chang'an) | 2018 | — | 35.2 | 29 | |
5 | Matengkong (Yanta) | Chuangxingang (Chang'an) | 2020 | — | 41.6 [11] | 31 | |
6 | Xi'anguojiyixuezhongxin (Chang'an) | Fangzhicheng (Baqiao) | 2020 | 2022 | 35.1 [11] | 30 | |
9 | Fangzhicheng (Baqiao) | Qinlingxi (Lintong) | 2020 | — | 25.3 | 15 | |
14 | Airport West (T1,T2,T3) (Weicheng,Xianyang) | Heshao (Baqiao) | 2019 | 2021 | 42.96 | 17 [lower-alpha 1] | |
16 | Qinchuangyuanzhongxin | Shijingli | 2023 | 15.03 | 9 | ||
Total | 311 | 212 |
The second route, Line 1, was scheduled to start in late 2009 but was brought one year earlier as per Chinese government's response to the Great Recession. Line 1 opened on 15 September 2013. The route runs from east to west. The line is 31.45 km (19.54 mi) [8] with 23 stations.
To accelerate the speed of overall economic development between Xi'an and Xianyang cities, the Transportation Department of Xi'an decided to extend Line 1 to promote business travel between the two cities, as well as improve the efficiency of land use alongside Line 1. The preparation phase for the extension Line 1 started with the compilation of a feasibility study on November 4, 2007.
Line 2 opened on 16 September 2011. This line is 26.715 km (16.600 mi) [9] long with 21 stations. [12]
Construction of Xi'an Metro's Line 3 broke ground in May 2011, [13] began public trial testing on September 20, 2016, and was opened at November 8, 2016. The line is currently 39.15 km (24.33 mi) long with 26 stations. When Phase 2 (still under planning) opens, the line will be 50.5 km (31.4 mi) long and with 31 stations.
Construction of test section of Line 4 of Xi'an Metro started in late 2012.
Line 6 opened on 28 December 2020.[ citation needed ]
The 29.31 km western section from Airport West (T1, T2, T3) to Xi'an Beizhan opened on 29 September 2019. The 13.65 km (8.48 mi) eastern section from Xi'an Beizhan to Heshao opened on 29 June 2021.
Line 16 opened on 27 June 2023. [3]
The final sections of Lines 5 & 6 connect to two new railway stations and are to open at the same time as those stations.
On June 12, 2019, the NDRC approved the Phase III (2018-2024) Construction Plan of Xi'an Metro. The plan includes Line 1 (Phase 3), Line 2 (Phase 2), Line 8, Line 10 (Phase 1), Line 14, Line 15 (Phase 1), Line 16 (Phase 1). The total length of Xi'an Metro will be 423 kilometres (263 mi) in 2024. [17]
Planned operation time | Construction since | Line | Phase/Section | Terminals | Length in km | Stations | Reference | |
2024 | 2021 | 6 | Phase I (remaining section) | Xi'annanzhan (Xi'an South Railway Station) | Xi'anguojiyixuezhongxin | 4.5 | 2 | |
2019 | 8 | Loop Line | 49.89 [10] | 37 [10] | [10] | |||
10 | Phase I | Yangjiazhuang | Shuijinggongyuan | 34.2 [18] | 17 [18] | [18] | ||
2025 | 5 | Phase I (remaining section) | Matengkong | Xi'andongzhan (Xi'an East Railway Station) | 3.66 | 3 | ||
2020 | 15 | Phase I | Xiliu | Hanjiawan | 19.5 [19] | 13 [19] | [19] | |
On 30 December 2008, a fire occurred that was extinguished within an hour; all workers evacuated safely. Just 66 hours later, on 2 January, another fire occurred at another station on Line 2. [20]
On 26 May 2009, an individual suffered minor injuries from a fire during infrastructure work on Line 1.
On 2 August 2009, 9:20am, a cave-in at the construction site of Sajinqiao section of Line 1 trapped migrant workers under 10 cubic meters of earth for over three hours, hospitalizing at least two who later died at the hospital. [21]
The Chengdu Metro is the rapid transit system of Chengdu, the capital of Sichuan, China. With the opening of Line 1 on 27 September 2010, the system consists of 13 subway lines and 1 light rail line. It has subsequently undergone rapid expansion. Since the opening of Lines 6, 8, 9, and 17 on 18 December 2020, the Chengdu Metro is the 4th longest metro system in the world.
Urban rail transit in China encompasses a broad range of urban and suburban electric passenger rail mass transit systems including subway, light rail, tram and maglev. Some classifications also include non-rail bus rapid transport. As of 31 December 2023, China has the world's longest urban rail transit system with more than 10,000 km (6,200 mi) of urban rail nationwide in 49 systems in 47 cities, accounting for 9 of the 10 longest metro systems, with the exceptions of the Moscow Metro or metro systems in Seoul combined if metro systems in the same cities are merged in the rank.
The Shenyang Metro is a rapid transit system serving the city of Shenyang, Liaoning, China. It's the seventh operational subway system in Mainland China and the first in Northeast China.
The Changping Line of the Beijing Subway is a rapid transit line in northern Beijing. It is 43.2 km (26.8 mi) in length with 20 stations. Changping line's color is pink.
Zhengzhou Metro is a rapid transit rail network serving urban and suburban districts of Zhengzhou, the capital city of Henan province. It is operated by the state owned Zhengzhou Metro Group. As of December 2023, the network has 11 operational lines, with a network length of 344 km (213.8 mi) and 217 stations. Opened on 28 December 2013, it is the first metro system in Henan province, and 18th in mainland China.
Qingdao Metro is a rapid transit system in Qingdao, Shandong province, China. The first line, Line 3 began operation on December 16, 2015.
The Guiyang Metro is a rapid transit system in the city of Guiyang, Guizhou province, China. It is operated and branded as Guiyang Urban Rail Transit (GYURT).
Nanchang Metro, officially Nanchang Rail Transit, is a rapid transit system in Nanchang, Jiangxi, China. As of 2021, four lines are operational. The Metro opened for commercial operation in December 2015. The network is currently 128.3 km (79.7 mi) in length with 4 lines. A total length of 163 km (101.3 mi) of network is planned, with Line 5 which is currently under planning.
Line 19 of the Beijing Subway is a rapid transit line in Beijing. It is 20.9 km (13.0 mi) in length and has 10 stations. It is fully underground. Line 19's color is lavender.
Line 11 of the Beijing Subway is a rapid transit line of the Beijing Subway. The line opened between Jin'anqiao and Xinshougang on December 31, 2021, and between Jin'anqiao and Moshikou on December 30, 2023. Line 11's color is grapefruit.
Line 2 of the Xi'an Metro is a rapid transit line in Xi'an, Shaanxi Province, China, running from north to south. The line is 33.637 km (20.901 mi) long with 25 stations. The line is colored red on system maps.
Line 1 of the Xi'an Metro is a rapid transit line running from west to east Xi'an. It was opened on 15 September 2013. Currently, this line measured 42 km (26 mi) long with 30 stations. The line is colored blue on system maps.
Xiaohang station, is a station of Line 10 of the Nanjing Metro. It started operations on 3 September 2005 as part of Line 1's Phase I that ran from Maigaoqiao to Olympic Stadium. On 1 July 2014, with the opening of Line 10, the former branch of Line 1 from Andemen to Olympic Stadium became re-designated as Line 10.
Olympic Stadium station, is a station of Line 10 of the Nanjing Metro. It started operations on 3 September 2005 as part of Line 1's Phase I that ran from Maigaoqiao to this station, On 1 July 2014, with the opening of Line 10, the former branch of Line 1 from Andemen to this station became re-designated as Line 10.
Shijiazhuang Metro is a rapid transit system in Shijiazhuang, Hebei province, China.
Nantong Rail Transit is a rapid transit system in Nantong, Jiangsu Province, China.
Line 15 of the Xi'an Metro is a rapid transit line currently under construction in Xi'an, Shaanxi Province, China, running from west to east. Phase 1 of Line 15 will be 19.46 km (12.09 mi) long with 13 stations. It is expected to open in 2025.
Line 6 is a line of the Xi'an Metro. The line runs from southwest to northeast, starting at Xi'anguojiyixuezhongxin and ending at Fangzhicheng. The line is colored Pantone 2726C (blue) on maps.
Line 16 of the Xi'an Metro is a rapid transit line in Xi'an, Shaanxi Province, China. The line is 15.03 km (9.34 mi) long with 9 stations. Phase 1 of Line 16 opened on 27 June 2023.