B1 (Guangzhou Metro car)

Last updated
B1
CSR Zhuzhou-Siemens train of Line 3, Guangzhou Metro.jpg
B1 train at Xiajiao Depot
Stock typeClass B EMU
In service26 December 2005-present
Manufacturer Siemens Mobility and CSR Zhuzhou Locomotive
Built at Zhuzhou, China
Family nameModular Metro
Constructed2005-2007
Entered service26 December 2005
Number built120
Number in service120
FormationMcp-T-Mcp
Fleet numbers03A001~03A002-03A039~03A040
Capacity240 per car
Operators Guangzhou Metro Group
DepotsXiajiao Depot
Jiahe Depot
Lines served  3  
Specifications
Car body construction Aluminum alloy
Train length59.94 m (196 ft 8 in)
Car length19.98 m (65 ft 7 in)
Width2.8 m (9 ft 2 in)
Height3.8 m (12 ft 6 in)
DoorsElectric doors
Maximum speed120 km/h (75 mph)
Traction systemSiemens Mobility G1500 D1000/300 M5-1 IGBT-VVVF
Traction motors Siemens Mobility 1TB2013-1GA02 3-phases AC induction motors
Acceleration Maximum 0.9 km/(h⋅s) (0.559 mph/s)
Deceleration 1.0 km/(h⋅s) (0.621 mph/s) (service)
1.3 km/(h⋅s) (0.808 mph/s) (emergency)
Electric system(s) 1,500 V DC
Current collector(s) Single-arm Pantograph
UIC classification Bo′Bo′+2′2′+Bo′Bo′
Bogies Siemens Mobility SF2500 [1]
Track gauge 4 ft 8+12 in (1,435 mm)

The B1 (commonly known as Guangzhou Metro Line 3 Trains) is a class of rolling stock built for Line 3 of Guangzhou Metro. They are built by Siemens Mobility and CSR Zhuzhou Locomotive. B1 is the first mass-produced B-class rolling stock for the Guangzhou Metro. They entered service on 26 December 2005. [2]

Contents

B1 sets are double-paired for service since 20 April 2010, to expand the service capacity of Line 3. [3]

Description

The B1s feature Siemens traction motors, Knorr EP-2002 electronic braking systems, plug-style doors and electronic strip maps. [4]

History

The B1 contract was awarded to Siemens Mobility on 19 May 2003, who won the A1 contract before. The first train completed on 18 November 2005. [5]

On 8 January 2010, the first train (set 03x001-002) received an overhaul at Xiajiao Depot. [6]

Roster

 
Formation03A0xx

(Tcp)

03B0xx

(T)

03C0xx

(Tcp)

Numbers03A001

03A039

03B001

03B039

03C001

03C039


References

  1. "First Class Bogies" (PDF). Siemens Mobility . Archived from the original (PDF) on 2019-07-22.
  2. 广州地铁3号线开通 时速达120公里 Archived 2005-12-29 at the Wayback Machine .信息时报.2005-12-27
  3. 广州地铁三号线列车提前加长 3节车厢改6节 Error in Webarchive template: Empty url..南方日报.2010-04-05
  4. 陶功安,袁立祥,马景成 (2006). "广州地铁3号线地铁车辆". 机车电传动 (4): 53~59. Archived from the original on 2022-01-07. Retrieved 2022-01-07.
  5. "我国设计时速最快的地铁列车在湖南株洲下线". Archived from the original on 2014-03-18. Retrieved 2014-05-14.
  6. "三号线首列车运行5年大体检". Archived from the original on 2014-03-18. Retrieved 2012-06-21.
  7. 广州地铁集团有限公司 (2013-12-24). "三号线列车介绍". Archived from the original on 2021-11-06. Retrieved 2022-01-06.