Bay d'Espoir Hydroelectric Power Station | |
---|---|
Location | Canada Newfoundland and Labrador |
Coordinates | 47°59′24.88″N55°48′00.51″W / 47.9902444°N 55.8001417°W Coordinates: 47°59′24.88″N55°48′00.51″W / 47.9902444°N 55.8001417°W |
Construction began | 1964 |
Owner(s) | Newfoundland and Labrador Hydro |
Reservoir | |
Creates | Meelpaeg Lake |
Power Station | |
Hydraulic head | 176 m (577 ft) |
Turbines | 7 |
Installed capacity | 613.4 MW [1] |
Capacity factor | 50.2% |
Annual generation | 2,657 GWh |
Website Official website |
The Bay D'Espoir Hydroelectric Development, built by the Newfoundland and Labrador Power Commission is located on the south coast of Newfoundland near the rural community of Bay d'Espoir. It was the second major hydroelectric project undertaken on Newfoundland.
The hydroelectric potential of this area was known by the early 1920s but its development was not seriously considered until 1954 when British Newfoundland Development Corporation (BRINCO) became interested in the site. In 1957 a Shawinigan Engineering survey confirmed the feasibility of building a hydroelectric plant. By 1959 BRINCO had set up a subsidiary, Southern Newfoundland Power and Development Corporation, to carry out the project. However, the subsidiary was unable to attract industrial customers to the area; this, it felt, was necessary before undertaking the project, so in 1964 it sold all its rights and assets to the Newfoundland Government.
The government, by taking over the project, became eligible for a $20 million grant from the Atlantic Development Board a Federal Government agency. The engineering and construction work was carried out by ShawMont Newfoundland Engineering, a joint venture company formed by Shawinigan Engineering and Montreal Engineering in 1964.
The Bay D'Espoir Hydroelectric Development was undertaken to provide the province with a large source of low-cost electric power which would allow the Island's utilities to extend their services, stimulate the expansion of the industries already in the province and attract new industries to Newfoundland and Labrador. The Electric Reduction Company of Canada Industries Limited (ERCO), phosphorus plant at Long Harbour and the Come by Chance Oil Refinery at Come by Chance were built partially because of the availability of cheap power. [2]
Units 1 through 4 went online between 1967 and 1968, with each unit having a rated capacity of 75 MW.
Generating unit 2 underwent a major refurbishment during the summer of 2010, including a stator rewind, rotor pole re-insulation and protection upgrade. [3] This project was the first stator rewind on a unit of this size in Newfoundland and Labrador Hydro's history. [4]
The headwaters of the Bay d'Espoir system begin at Victoria Lake at an approximate elevation of 320 metres. Through a man-made array of dams and canals, this water is directed to generating plants at Granite Canal, Upper Salmon and, finally, 150 km from Victoria Lake to its final tidewater destination at Bay d'Espoir. Water is collected, stored and diverted from a number of drainage areas between Victoria Lake and Long Pond, the forebay for the two Bay d'Espoir generating stations.
The seven generating units at Bay d'Espoir utilize approximately 176 m of head to produce a rated output of 613.4 MW with a rated flow of 397 m3/s. The plant produces an average of 2,657 GWh annually, making it the largest hydroelectric plant on Newfoundland.
Small hydro is the development of hydroelectric power on a scale suitable for local community and industry, or to contribute to distributed generation in a regional electricity grid. Exact definitions vary, but a "small hydro" project is less than 50 megawatts (MW), and can be further subdivide by scale into "mini" (<1MW), "micro" (<100 kW), "pico" (<10 kW). In contrast many hydroelectric projects are of enormous size, such as the generating plant at the Three Gorges Dam at 22,500 megawatts or the vast multiple projects of the Tennessee Valley Authority.
An underground power station is a type of hydroelectric power station constructed by excavating the major components from rock, rather than the more common surface-based construction methods.
New Brunswick Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically-integrated Crown Corporation wholly owned by the Government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.
Newfoundland and Labrador Hydro, commonly known as Hydro, is a provincial Crown corporation that generates and delivers electricity for Newfoundland and Labrador, as well as portions of Quebec and the north-eastern areas of the United States. Between 2007 and 2021, NL Hydro was a subsidiary of the provincial Crown-owned energy holding company Nalcor Energy.
The Hinds Lake Generating Station is a hydroelectric power plant located within the Newfoundland Highland forests ecoregion, in western Newfoundland on the eastern shore of Grand Lake. It makes use of 220 m of head between Hinds Lake on the Buchans plateau and Grand Lake.
The Upper Salmon Hydro Development, a hydroelectric plant in Newfoundland and Labrador. It utilises a portion of the residual head between Meelpaeg Lake Reservoir and Round Pond within the watershed of the Bay d'Espoir Hydroelectric Development.
The Paradise River Hydroelectric Generating Station is a hydroelectric generating plant located near the mouth of the Paradise River in Newfoundland and Labrador. The plant is owned by Newfoundland and Labrador Hydro, and was first synchronized in 1989. It operates with an average rated flow of 25 m3/s to generate 8 MW of electrical power, with an average annual production of 37 GWh. The unit is equipped with a Francis runner. The project, which operates under a run-of-river philosophy, has a 43m high concrete arch dam with an overflow spillway, the largest structure of this design in Eastern North America.
The Granite Canal Hydroelectric Generating Station is a component of the Newfoundland and Labrador Hydro Corporation's Bay d’Espoir Hydro Electric Development system. The generating station has a rated capacity of 40 MW with an annual average energy production of 224 gigawatt hours (GWh). The generating unit at Granite Canal utilizes approximately 37 metres of head with a rated plant flow of 122.4 cubic metres per second. The unit is equipped with a Kaplan turbine and was first synchronized on May 26, 2003.
The Churchill Falls (Labrador) Corporation, also known as CF(L)Co or CFLco is a Canadian electric company. The company was founded in 1961 and is based in St. John's, Newfoundland and Labrador. Churchill Falls (Labrador) Corporation Limited operates as a subsidiary of Newfoundland and Labrador Hydro.
Newfoundland Power Inc. is an electric utility owned by Fortis Inc. which is the primary retailer of electric power in the Canadian province of Newfoundland and Labrador. The company was formed by the Royal Securities Corporation of Montreal in 1924 as the Newfoundland Light & Power Company.
The Petty Harbour Hydro Electric Generating Station is a hydroelectric generating station in Petty Harbour–Maddox Cove, Newfoundland and Labrador. It was constructed in 1898 and it was the first hydroelectric generating station in Newfoundland. It was built by the St. John's Street Railway Company, a company established by Robert Reid. Operation commenced on 19 April 1900.
The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.
St. Alban's is a town of approximately 1,200 located in the Bay d'Espoir estuary on the south coast of Newfoundland, Canada. St. Alban's is the largest community in Bay d'Espoir. The town is 180 kilometres (110 mi) south of Grand Falls-Windsor.
Hydro-Québec is a government-owned public utility established in 1944 by the Government of Quebec. The company is in charge of the generation, transmission and distribution of electricity across Quebec. Its head office is located in Montreal.
The Churchill Falls Generating Station is a hydroelectric underground power station in Labrador. At 5,428 MW, it is the sixteenth largest in the world, and the second-largest in Canada, after the Robert-Bourassa generating station in northwestern Quebec.
The history of electricity sector in Canada has played a significant role in the economic and political life of the country since wide-scale industrial and commercial power services spread across the country in the 1880s. The development of hydropower in the early 20th century has profoundly affected the economy and the political life in Canada and has come to symbolize the transition from "old " industrialism of the 19th century to a "new", modern and diversified, Canadian economy.
The Menihek Hydroelectric Generating Station is a conventional hydroelectric generating station at Menihek Lake in Labrador. The dam and powerhouse are located in the Canadian province of Newfoundland and Labrador, 40 km (25 mi) south of the isolated town of Schefferville, Quebec and two First Nations communities: Matimekosh-Lac-John and Kawawachikamach. The generating station, two 69 kV power lines and the distribution networks in each community form an independent electricity network, off the main North American grid.
The Rapide-Blanc generating station is a hydroelectric facility, comprising a reservoir, a dam and a hydroelectric plant. It is located on the Saint-Maurice River about sixty kilometres (37 mi) north of the city of La Tuque, in Quebec, in Canada. Built between 1930 and 1934 by the Shawinigan Water & Power Company (SWPC), it is the third hydroelectric facility on this river. The plant has been operated by Hydro-Québec since it was acquired from the SWPC in 1963, as part of the nationalisation of electric power companies in Quebec. The plant has a rated power of 204 megawatts (274,000 hp).