Bristol and Exeter Railway 4-2-4T locomotives

Last updated

8ft 10in Pearson 4-2-4T no. 2002 (previously no. 40) at Exeter in 1876 BER 2002 Exeter.jpg
8ft 10in Pearson 4-2-4T no. 2002 (previously no. 40) at Exeter in 1876

The 14 Bristol and Exeter Railway 4-2-4T locomotives were broad gauge 4-2-4T steam locomotives built to three different designs. The first entered service in 1853. The Bristol and Exeter Railway was amalgamated into the Great Western Railway on 1 January 1876, and the last of the 4-2-4Ts was withdrawn in 1885.

Contents

The distinctive designs by James Pearson, the railway company's engineer, featured single large flangeless driving wheels and two supporting bogies. The water was carried in both well and back tanks, leaving the boilers exposed in the same way as tender locomotives.

The three types are distinguished by the size of driving wheel; the early 9-foot-diameter (2.7 m) wheels being replaced by smaller ones on later designs.

List of locomotives

9 feet

B&ER 9ft 4-2-4T
HLB Lok 1.jpg
B&ER locomotive no.44
Type and origin
Power typeSteam
Designer James Pearson
Builder Rothwell and Company
Specifications
Configuration:
   Whyte 4-2-4T
Gauge 7 ft (2,134 mm)
Leading dia. 4 ft 0 in (1.219 m)
Driver dia.9 ft 0 in (2.743 m)
Trailing dia. 4 ft 0 in (1.219 m)
Wheelbase 24 ft 9 in (7.54 m)
Cylinder size 16.5 in × 24 in (419 mm × 610 mm)

The first of Pearson's 4-2-4Ts were eight locomotives built by Rothwell and Company in 1853 and 1854 and were all withdrawn by 1873.

The large wheels gave these locomotives a good turn of speed, 81.8 mph being reported on one train descending Wellington Bank in Somerset.

7 feet 6-inch

B&ER 7ft 6in 4-2-4T
Type and origin
Power typeSteam
Designer James Pearson
Builder Bristol and Exeter Railway
Specifications
Configuration:
   Whyte 4-2-4T
Gauge 7 ft (2,134 mm)
Leading dia. 4 ft 0 in (1.219 m)
Driver dia.7 ft 6 in (2.286 m)
Trailing dia. 4 ft 0 in (1.219 m)
Wheelbase 25 ft 1 in (7.65 m) or
25 ft 2 12 in (7.68 m)
Cylinder size 16.5 in × 24 in (419 mm × 610 mm) or
17 in × 24 in (432 mm × 610 mm)

These two locomotives were built as replacements for more conventional 2-2-2 express passenger locomotives with 7-foot-6-inch (2.29 m) driving wheels and were given wheels of this same size, rather than the 9-foot-diameter (2.7 m) wheels of their 4-2-4T predecessors.

No. 29 was the first locomotive built at the Bristol and Exeter Railway's new Bristol workshops in 1859. It had slightly larger 17-inch-diameter (430 mm) cylinders and a 25-foot-2 12-inch (7.684 m) wheelbase. When withdrawn in 1885 it was the end of Pearson's 4-2-4Ts.

No. 12 followed in 1862 and returned to 16 12-inch (420 mm) cylinders and had a slightly shorter 25-foot-1-inch (7.65 m) wheelbase.

8 feet 10-inch

B&ER 8ft 10in 4-2-4T
4-2-4 B&ER No40.jpg
Type and origin
Power typeSteam
Designer James Pearson
Builder Bristol and Exeter Railway
Specifications
Configuration:
   Whyte 4-2-4T
Gauge 7 ft (2,134 mm)
Leading dia. 4 ft 0 in (1.219 m)
Driver dia.8 ft 10 in (2.692 m)
Trailing dia. 4 ft 0 in (1.219 m)
Wheelbase 25 ft 6 in (7.77 m)
Cylinder size 18 in × 24 in (457 mm × 610 mm)

Four of the 9-foot locomotives were replaced by these "renewals", built in the Bristol and Exeter Railway workshops at Bristol. A pair of their new 8-foot-10-inch-diameter (2.69 m) driving wheels can be seen at Swindon Steam Railway Museum.

No. 39, recently renumbered as GWR 2001, derailed at Long Ashton near Bristol on 27 July 1876 and was withdrawn from service. While the poor condition of the track was a contributing factor, it was decided to rebuild the remaining three express 4-2-4Ts to more conventional 4-2-2 tender locomotives.

Related Research Articles

Great Western Railway British railway company (1833-1947)

The Great Western Railway (GWR) was a British railway company that linked London with the southwest and west of England, the West Midlands, and most of Wales. It was founded in 1833, received its enabling Act of Parliament on 31 August 1835 and ran its first trains in 1838. It was engineered by Isambard Kingdom Brunel, who chose a broad gauge of 7 ft —later slightly widened to 7 ft 14 in —but, from 1854, a series of amalgamations saw it also operate 4 ft 8 12 in standard-gauge trains; the last broad-gauge services were operated in 1892.

Locomotives of the Great Western Railway

The first Locomotives of the Great Western Railway (GWR) were specified by Isambard Kingdom Brunel but Daniel Gooch was soon appointed as the railway's Locomotive Superintendent. He designed several different 7 ft 14 in broad gauge types for the growing railway, such as the Firefly and later Iron Duke Class 2-2-2s. In 1864 Gooch was succeeded by Joseph Armstrong who brought his standard gauge experience to the workshops at Swindon. To replace some of the earlier locomotives, he put broad gauge wheels on his standard gauge locomotives and from this time on all locomotives were given numbers, including the broad gauge ones that had previously carried just names.

The Great Western Railway (GWR) Bogie Class 4-4-0ST were broad gauge steam locomotives for passenger train work. The first two locomotives of this class were introduced into service in August/September 1849, with the remainder following between June 1854 and March 1855. All but one were withdrawn between October 1871 and 1873, with the final locomotive being withdrawn in December 1880.

GWR Iron Duke Class

The Great Western Railway Iron Duke Class 4-2-2 was a class of 7 ft 14 in broad gauge steam locomotives for express passenger train work.

The Great Western Railway Swindon Class 0-6-0 broad gauge steam locomotives for goods train work. This class was introduced into service between November 1865 and March 1866, and withdrawn between June 1887 and the end of the GWR broad gauge in May 1892. The entire class was sold to the Bristol and Exeter Railway between July 1872 and September 1874, where they were numbered 96-109, but returned to the GWR when that railway was absorbed. The locomotives were then renumbered 2077-2090; their names were not restored.

4-2-4T

Under the Whyte notation for the classification of steam locomotives, 4-2-4 represents the wheel arrangement of four leading wheels on two axles, two powered driving wheels on one axle, and four trailing wheels on two axles. This type of locomotive is often called a Huntington type.

Rothwell, Hick and Rothwell

Rothwell, Hick and Rothwell was an engineering company in Bolton, England. Set up in 1822, the partners became interested in the production of steam locomotives after the Rainhill Trials. The company's first engine was Union, a vertical boiler, 2-2-0 with horizontal cylinders for the Bolton and Leigh Railway of which Hick and Rothwell were promoters and original shareholders, followed by three more locomotives the following year for American railways.

Bristol and Exeter Railway

The Bristol & Exeter Railway (B&ER) was an English railway company formed to connect Bristol and Exeter. It was built on the broad gauge and its engineer was Isambard Kingdom Brunel. It opened in stages between 1841 and 1844. It was allied with the Great Western Railway (GWR), which built its main line between London and Bristol, and in time formed part of a through route between London and Cornwall.

South Devon Railway 0-4-0 locomotives

The South Devon Railway 0-4-0 locomotives were small 0-4-0 broad gauge locomotives operated on the South Devon Railway, Cornwall Railway, mainly on the dockside lines around Plymouth.

Bristol and Exeter Railway locomotives

The Bristol and Exeter Railway locomotives worked trains on the Bristol and Exeter Railway from 1 May 1849 until the railway was amalgamated with the Great Western Railway on 1 January 1876.

The 26 Bristol and Exeter Railway 4-4-0ST locomotives were broad gauge 4-4-0 saddle tank steam locomotives. They first entered service in 1855 and the last was withdrawn in 1892. The Bristol and Exeter Railway was amalgamated into the Great Western Railway on 1 January 1876.

Bristol and Exeter Railway 4-2-2 locomotives

The 20 Bristol and Exeter Railway 4-2-2 locomotives were broad gauge 4-2-2 express steam locomotives built for the Bristol and Exeter Railway by the Stothert and Slaughter in Bristol. The first entered service in 1849. The Bristol and Exeter Railway was amalgamated into the Great Western Railway on 1 January 1876 and eight 4-2-2s survived at this time, the last being withdrawn in 1889.

The Bristol and Exeter Railway 0-6-0 locomotives include three different types of broad gauge and standard gauge 0-6-0 steam locomotives designed for working freight trains. On 1 January 1876 the Bristol and Exeter Railway was amalgamated with the Great Western Railway, after which the locomotives were given new numbers.

The seven Bristol and Exeter Railway 2-2-2WT locomotives were small 2-2-2 well tank locomotives designed by James Pearson for working branch lines such as those to Tiverton and Clevedon, as well as acting as pilot locomotives at Bristol. The first was delivered in 1851, and the last withdrawn in 1880.

The Bristol and Exeter Railway 0-4-0T locomotives were two small 0-4-0T locomotives built for shunting by the Bristol and Exeter Railway. On 1 January 1876 the Bristol and Exeter Railway was amalgamated with the Great Western Railway, after which the locomotives were given new numbers.

The Bristol and Exeter Railway Fairfield was an experimental broad gauge self-propelled steam carriage. In later use the carriage portion was removed and it was used as a small shunting locomotive.

James Pearson (engineer)

James Pearson was a 19th-century English railway engineer. He is best remembered as the designer of the distinctive Bristol and Exeter Railway 4-2-4T locomotives.

The first 19 locomotives ordered by Isambard Kingdom Brunel for the Great Western Railway included six 2-2-2 Charles Tayleur locomotives. They were built by Charles Tayleur and Company, which became later the Vulcan Foundry. The locomotives were unsuccessful and rapidly supplemented by the Star Class locomotives ordered by Daniel Gooch once he had been appointed as the Locomotive Engineer. As built, they comprised two groups of three: the first group, delivered in 1837, had cylinders having a bore of 14 inches (360 mm) and the second group, delivered in 1838, had cylinders having a bore of 12 inches (300 mm); all had a stroke of 16 inches (410 mm).

During the 1880s William Dean constructed a series of experimental locomotives to test various new ideas in locomotive construction for the Great Western Railway.

Between 1854 when the Shrewsbury and Chester and Shrewsbury and Birmingham Railways were absorbed by the Great Western Railway, and 1864 when he moved south to Swindon Works, Joseph Armstrong occupied the post of the GWR's Locomotive Superintendent, Northern Division, at Wolverhampton Works. For ten years the task of providing new locomotives for the GWR's newly acquired standard gauge lines fell jointly to Armstrong and to his superior Daniel Gooch, the railway's principal Locomotive Superintendent who was based at Paddington.

References