Burwood North railway station

Last updated

Burwood North
General information
LocationCorner Burwood & Parramatta Roads, Concord, New South Wales
Owned by Transport Asset Holding Entity
Line(s) Sydney Metro West
Platforms2
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
StatusPlanned
Website www.sydneymetro.info
ElectrifiedYes
Services
Preceding station TfNSW M.svg Sydney Metro Following station
North Strathfield
toward Westmead
M3 Sydney Metro West Five Dock

Burwood North Metro Station is an under construction station on the Sydney Metro West that will serve the Sydney suburb of Burwood. It will be located on the corner of Burwood and Parramatta Roads and is scheduled to open with the rest of the line by 2030. [1] [2] [3]

Related Research Articles

<span class="mw-page-title-main">Epping railway station, Sydney</span> Railway station in Sydney, New South Wales, Australia

Epping railway station is a railway station in Epping, in the northern region of Sydney. It is served by Sydney Trains T9 Northern Line, NSW TrainLink Central Coast & Newcastle Line, and Metro North West Line services.

<span class="mw-page-title-main">Burwood, New South Wales</span> Suburb of Sydney, New South Wales, Australia

Burwood is a suburb in the Inner West of Sydney, in the state of New South Wales, Australia. It is 10 kilometres (6.2 mi) west of the Sydney central business district and is the administrative centre for the local government area of Municipality of Burwood. People from Burwood are colloquially known as Burwoodiens or Burwooders.

<span class="mw-page-title-main">Northern Line (Sydney)</span> Rail service in Sydney, Australia

The Northern Line is a commuter rail line operated by Sydney Trains in Sydney, New South Wales, Australia. It serves some of Sydney's Inner West and Northern suburbs. It was spun off from the old T1 North Shore, Northern & Western Line as a separate line in April 2019, to distinguish and make it more easily identified from the other T1 services. It is also a reincarnation of the older Northern Line which was under operation until 2013.

<span class="mw-page-title-main">Bankstown railway station</span> Railway station in Sydney, New South Wales

Bankstown railway station is located on the Bankstown line, serving the Sydney suburb of Bankstown. It is served by Sydney Trains T3 Bankstown line services.

<span class="mw-page-title-main">Kingsgrove railway station</span> Railway station in Sydney, New South Wales, Australia

Kingsgrove railway station is located on the East Hills line, serving the Sydney suburb of Kingsgrove. It is served by Sydney Trains T8 Airport & South line services.

<span class="mw-page-title-main">Hurlstone Park railway station</span> Railway station in Sydney, New South Wales, Australia

Hurlstone Park railway station is located on the Bankstown line, serving the Sydney suburb of Hurlstone Park. It is served by Sydney Trains T3 Bankstown line services.

<span class="mw-page-title-main">Campsie railway station</span> Railway station in Sydney, New South Wales, Australia

Campsie railway station is located on the Bankstown line, serving the Sydney suburb of Campsie. It is served by Sydney Trains T3 Bankstown line services.

<span class="mw-page-title-main">Belmore railway station</span> Railway station in Sydney, New South Wales, Australia

Belmore railway station is a heritage-listed railway station located on the Bankstown line at Burwood Road, Belmore in the City of Canterbury-Bankstown local government area of New South Wales, Australia. It is served by Sydney Trains T3 Bankstown line services. It was designed and built by NSW Government Railways from 1895 to 1937. It is also known as Belmore Railway Station Group and Burwood Road. The property was added to the New South Wales State Heritage Register on 2 April 1999.

<span class="mw-page-title-main">North Strathfield railway station</span> Railway station in Sydney, New South Wales, Australia

North Strathfield railway station is located on the Main Northern line, serving the Sydney suburb of North Strathfield. It is served by Sydney Trains T9 Northern Line services.

<span class="mw-page-title-main">Sydney Metro Northwest</span> Rapid transit rail project in Sydney, New South Wales, Australia

Sydney Metro Northwest was a rapid transit project involving the construction of a rail line through the north-western suburbs of Sydney, New South Wales, Australia. The line included the conversion of the existing Epping to Chatswood Rail Link to metro standards and connects the suburbs of Rouse Hill and Chatswood via Castle Hill and Epping. The project was managed by Transport for NSW through its Sydney Metro agency and opened to service on 26 May 2019 as the Metro North West Line.

Burwood railway station may refer to:

<span class="mw-page-title-main">Sydney Metro</span> Transit system in Sydney, Australia

The Sydney Metro is a fully automated rapid transit system serving the city of Sydney, New South Wales, Australia. Currently consisting of one line that opened on 26 May 2019, it runs from Tallawong to Chatswood and consists of 13 stations and 36 km (22.4 mi) of twin tracks, mostly underground. Work is progressing to extend this line from Chatswood to Bankstown, running under Sydney Harbour and the Sydney Central Business District (CBD) with a scheduled 2024 completion. When completed, this line will have 66 km (41.0 mi) of twin tracks and 31 stations.

<span class="mw-page-title-main">North Shore & Western Line</span> Rail service in Sydney, New South Wales, Australia

The North Shore & Western Line is a commuter rail line operated by Sydney Trains in Sydney, New South Wales, Australia. It serves the North Shore, parts of the Inner West and Western Suburbs.

<span class="mw-page-title-main">Hills Showground railway station</span> Sydney Metro railway station

Hills Showground railway station is an underground rapid transit station built by the Metro Trains Sydney consortium at Doran Drive, Castle Hill, in Sydney, Australia. The station, located near the Castle Hill Showground, was built as part of Transport for NSW's Sydney Metro Northwest project, to serve future train services to Rouse Hill and Chatswood. The station is planned to eventually serve trains to the Sydney central business district and Bankstown as part of the government's 20-year Sydney's Rail Future strategy. The station opened 26 May 2019.

<span class="mw-page-title-main">Sydney Metro City & Southwest</span> Rapid transit project in Sydney, New South Wales, Australia

Sydney Metro City & Southwest is a 30-kilometre (19 mi) rapid transit project currently under-construction in Sydney, New South Wales, Australia. The project will extend the Metro North West Line from Chatswood on the North Shore, to Bankstown in the city's south-west via the Sydney central business district. The centrepiece of the project is a new 15.5-kilometre (9.6 mi) twin-tunnel rail crossing under Sydney Harbour and through the city to Sydenham. Together with planned improvements to the Main Western line, the project is expected to increase capacity on the Sydney rail network by up to 60%, and allow for the movement of over 100,000 extra commuters across the network every hour.

Sydney Metro West is a rapid transit project under construction in Sydney, New South Wales, Australia, involving the construction of a rail line linking the Sydney City Centre (CBD) with Westmead in the outer western suburbs of Greater Sydney. The metro line will run parallel to the existing Main Suburban and Main Western railway lines, with the main aims being the doubling of rail capacity between the City Centre and Greater Western Sydney and the relief of overcrowding on the Western Line. The line will form part of the Sydney Metro network.

The Bays Precinct is a proposed urban renewal project in Sydney, Australia. It will involve the redevelopment of 95 hectares of land adjoining Sydney Harbour formerly used by industry. Among the sites to be redeveloped are the Rozelle railway yards, White Bay Power Station, Glebe Island port, the Sydney Fish Market and Wentworth Park.

The Western Sydney Airport line, previously known as Sydney Metro Greater West, is an under-construction 23-kilometre (14 mi) line of the Sydney Metro. The line will operate between St Marys, where the line will connect to the Main Western railway line, and Badgerys Creek Aerotropolis via Western Sydney Airport. It is intended to provide public transport for the upcoming Western Sydney Airport. The line is expected to start construction in December 2022 and to be completed in late 2026 in time for the opening of the airport.

<span class="mw-page-title-main">Metro North West Line</span> Metro line in Sydney

The Metro North West Line is a rapid transit rail line in Sydney, New South Wales, Australia. The first–and currently the only line on the Sydney Metro network, it commenced operation on 26 May 2019, running between Tallawong and Chatswood.

Parramatta metro station is a proposed station on the Sydney Metro West that will serve the Parramatta central business district. It is to be built within the block bounded by George, Macquarie, Church and Smith streets, to the north of the existing Parramatta railway station. An entrance is proposed to be built on Horwood Place, with other potential entrances still to be determined. The metro station is anticipated to increase capacity at Parramatta railway station by relieving demand in peak times. It is scheduled to open with the rest of the line by 2030.

References