Chongqing Suburban Railway

Last updated

Chongqing Suburban Railway
Overview
Native name重庆市郊铁路
Locale Chongqing, China
Transit type Commuter rail, rapid transit
Website http://www.cqrailway.com
Operation
Operator(s)Chongqing Railway Group Co, Ltd
Technical
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification 25 kV AC overhead line
Top speed100 km/h (62 mph) – 200 km/h (120 mph)
Chongqing Suburban Railway
Simplified Chinese 重庆市郊铁路
Traditional Chinese 重慶市郊鐵路
Transcriptions
Standard Mandarin
Hanyu Pinyin Chóngqìng Shìjiāo Tiělù
other Mandarin
Sichuanese Pinyin Cong2qin4 Si4jiao1 Tie2nu4
OpeningProjectTerminusTop speedTypeLength (km)New stationsStart of constructionStatusNotes
2022 Jiangtiao [Note 1] Phase ITiaodengShengquansi120 km/h (75 mph)Double-track26.772014Operational [1]
TBA Yuhe Yuhe lineMoxinpoWeituo160 km/h (99 mph)Double-track49.55TBAOn hold
TBA Heyong Heyong lineHuangnibaYongchuannan160 km/h (99 mph)Single-track95.08TBAIn planning
2025 Bitong Bitong lineBishanTongliangxi140 km/h (87 mph)Double-track37.5 [2] 9 [2] 2019Operational [2]
2025 Jiangtiao [Note 1] Phase IIShengquansiDingshan120 km/h (75 mph)Double-track4.6122022In full construction [1]

See also

References

  1. 1 2 "重点项目". 重庆铁路(集团)有限公司 (in Chinese (China)). Retrieved April 2, 2017.
  2. 1 2 3 "璧铜线开工 璧铜线设站9座 新型快线车从铜梁一小时飙拢解放碑". November 29, 2019.

Notes