| Chongqing Suburban Railway | |
|---|---|
| Overview | |
| Native name | 重庆市郊铁路 |
| Locale | Chongqing, China |
| Transit type | Commuter rail, rapid transit |
| Website | http://www.cqrailway.com |
| Operation | |
| Operator(s) | Chongqing Railway Group Co, Ltd |
| Technical | |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 25 kV AC overhead line |
| Top speed | 100 km/h (62 mph) – 200 km/h (120 mph) |
| Chongqing Suburban Railway | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Simplified Chinese | 重庆市郊铁路 | ||||||||||
| Traditional Chinese | 重慶市郊鐵路 | ||||||||||
| |||||||||||
Chongqing Suburban Railway is a commuter rail transit system in construction in Chongqing,China. According to the Comprehensive Transport Plan of Chongqing Main City Zone,the system will have a total of 14 lines.
This section needs to be updated.(September 2024) |
| Opening | Project | Terminus | Top speed | Type | Length (km) | New stations | Start of construction | Status | Notes | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2022 | Jiangtiao [Note 1] | Phase I | Tiaodeng | Shengquansi | 120 km/h (75 mph) | Double-track | 26.7 | 7 | 2014 | Operational | [1] |
| TBA | Yuhe | Yuhe line | Moxinpo | Weituo | 160 km/h (99 mph) | Double-track | 49.5 | 5 | TBA | On hold | |
| TBA | Heyong | Heyong line | Huangniba | Yongchuannan | 160 km/h (99 mph) | Single-track | 95.0 | 8 | TBA | In planning | |
| 2025 | Bitong | Bitong line | Bishan | Tongliangxi | 140 km/h (87 mph) | Double-track | 37.5 [2] | 9 [2] | 2019 | Operational | [2] |
| 2025 | Jiangtiao [Note 1] | Phase II | Shengquansi | Dingshan | 120 km/h (75 mph) | Double-track | 4.61 | 2 | 2022 | In full construction | [1] |