Curbans Solar Park | |
---|---|
![]() | |
Official name | Parc Solaire Curbans |
Country | France |
Location | Curbans |
Coordinates | 44°24′10″N6°01′59″E / 44.4028°N 6.033°E |
Commission date | 2011 |
Construction cost | €80 million |
Solar farm | |
Type | Flat-panel PV |
Site area | 321 acres (129.9 ha) |
Power generation | |
Units operational | 145,000 |
Nameplate capacity | 33 MW |
Capacity factor | 15.0% |
Annual net output | 43.5 GW·h |
Curbans Solar Park is a 33 MW solar farm near Curbans, France. It has 145,000 Yingli PV panels and is at an altitude of 1000 m. [1] [2] [3] [4] [5]
The Moura Photovoltaic Power Station is a large photovoltaic power station in Amareleja, in the municipality of Moura, Portugal. It is one of the largest power stations of its kind, and is built in one of the sunniest regions in Europe. Its construction involved two stages: stage 1 was completed in 2008 after 13 months, and stage 2 was completed in 2010. The entire project exceeded a total cost of €250 million.
Gottelborn Solar Park is an 8.4-MWp photovoltaic power station located in Göttelborn, in Quierschied municipality, Germany. The power plant was constructed by City Solar in two stages. The first stage was completed in August, 2004, followed by the second stage three years later in November 2007.
The El Coronil Solar Power Plant is a photovoltaic power station in El Coronil, Spain. The project includes different generating units. El Coronil I is a 10.08 MWp project that is equipped with 386 2X trackers, and 51,794 Yingli polycrystalline photovoltaic modules, and 24 Siemens inverters of 400 kW. The annual production capacity is 20 GWh. El Coronil II has a capacity of 10.2 MWp and it is equipped with 53,206 Yingli polycrystalline photovoltaic modules, and 24 inverters of 400 kW.
The Rothenburg Solar Park is a photovoltaic power station in Rothenburg, Oberlausitz in Germany. Initially it had a capacity of 20.5 megawatts (MW). The solar park is equipped with 273,240 CdTe-modules from First Solar, and 11 Siemens central inverters. The project was commissioned in 2009. The original solar farm was divided into three fields on the airfield site.
Huanghe Hydropower's Golmud Solar park is a 200 megawatt (MW) photovoltaic power station located in Golmud, Qinghai Province, China. Construction began in August 2009, and it was commissioned on October 29, 2011. 80 MW was provided by Yingli. The project won the 2012 China Quality Power Project Award. Output is expected to be 317 GWh per year.
The Gabardan Solar Park is a 67.5 megawatt (MW) photovoltaic power station in France. It has about 872,300 thin-film PV panels made by First Solar, and incorporates a 2 MW pilot plant using 11,100 solar trackers.
The Avenal Solar Facility is a 57.7 megawatt (MW) photovoltaic power station in Kings County, California, constructed using 450,900 SHARP-128W thin-film modules. At its completion, it was California's largest photovoltaic facility.
The Lauingen Energy Park is a 25.7–megawatt (MW) photovoltaic power station, located in Bavarian Swabia, Germany. It covers an area of 63 hectares and was commissioned in June 2010.
Qinghai Golmud Solar Park is a photovoltaic power station located in Golmud, Qinghai Province, China. It is 20.16 megawatt-peak (MWp), and was completed in 2011 by Longyuan Power. It uses 18.63079 MW of polycrystalline silicon solar cell modules and 1.530144 MW of amorphous silicon thin film modules. The polysilicon modules are by Yingli, and the amorphous ones are from Golden Sun Solar (GS-Solar). The capacity factor is expected to be 0.189.
Solarpark Eiche is a 26.5-megawatt (MW) photovoltaic power station located in Ahrensfelde‐Eiche, Germany, near the capital Berlin, and covers an area of 73 hectares.
Ernsthof Solar Park is a photovoltaic power station near Dörlesberg, Wertheim, Germany. It has a capacity of 34.4 MWp making it the largest Solar Park in the state of Baden-Württemberg. Phase I of 6.88 MWp and covering an area of 16.6 hectares, consisted of 31,280 modules by LDK Solar Energy Systems was completed on March 30, 2010. The second phase of 7.25 MWp was completed in December 2010, and it was expanded to 29.5 MW and then to 34.4 MW, with over 120,000 modules being fitted in December. Ernsthof East is 6.8 MW and Ernsthof West is 27.5 MW. The total area is 85 ha. Ernsthof is part of the Tauberlandpark, a planned 72 MW solar park consisting of Ernsthof and Solarpark Gickelfeld, which has been delayed due to the political uncertainty of solar parks of over 10 MW receiving the FIT. They may need, instead, to sign a Power Purchase Agreement with the grid distribution power company, which is better than subdividing large projects into multiple smaller segments just to qualify for the FIT.
Brandenburg-Briest Solarpark is photovoltaic power station, located at a former military airfield in Brandenburg, Germany. At the time of its completion, it was the largest solar park in Europe. Equipped with Q-Cells solar modules, it consists of three sections, namely
The Toul-Rosières Solar Park is a 115 megawatt (MW) solar farm located at the former Toul-Rosières Air Base, in France. Among other units, the airbase formerly housed the 21st Fighter-Bomber Group of the United States Air Force in the late 1950s, before being handed over to the French Air Force.
Templin Solar Park is a 128 megawatt (MW) photovoltaic power station, located at the former Templin military airport.
The Crucey Solar Park is a 60 MW solar farm in France. It was built by EDF Énergies Nouvelles in the communes of Maillebois, Crucey-Villages, and Louvilliers-lès-Perche. It has 741,150 thin-film photovoltaics panels made by First Solar.
The Perleberg Solar Park is a photovoltaic power station, with an installed capacity of 35 megawatts (MW). It uses 144,144 solar panels manufactured by Chinese company Yingli. The panels are mounted at a fixed angle on posts that are driven into the ground, at a former military airport.
The Cestas Solar Park is a 300 megawatt (MW) photovoltaic power station in Cestas, France. Built by Eiffage and Schneider Electric for the developer, Neoen, it opened on December 1, 2015. When it opened on 1 December 2015, Cestas Solar Park was the largest solar photovoltaic power station in Europe. Located in Cestas, to the south of Bordeaux, it spans 260 hectares and produces 300 MWp.