Company type | Public utility |
---|---|
Industry | Electricity Telecommunications |
Predecessor | Chattanooga Electric Power Board |
Founded | 1935 |
Headquarters | , United States |
Area served | Southeastern Tennessee, Chattanooga, North Georgia |
Key people | David Wade, CEO [1] |
Services | Electricity, Internet, Telecommunications, Cable TV services |
Website | https://epb.com/ |
EPB of Chattanooga, formerly known as the Electric Power Board of Chattanooga, is an American electric power distribution and telecommunication company owned by the city of Chattanooga, Tennessee. [2] EPB serves nearly 180,000 homes and businesses in a 600-square mile area in the greater Chattanooga area and Hamilton County. [3] In 2010, EPB was the first company in the United States to offer 1 Gbit/s high-speed internet over a fiber optic network, over 200 times faster than the national average. [4] As a result, Chattanooga has been called "Gig City" and held up as a national model for deploying the world's fastest internet and the most advanced Smart Grid electric distribution system in the United States. [5] On October 15, 2015, Chattanooga implemented the world's first community-wide 10-gig Internet service. [6] [7] [8]
In 1935, an act of the Tennessee Legislature established EPB as an independent board of the City of Chattanooga to provide electric power to the Greater Chattanooga area. EPB began serving their customers in 1939. [9]
Source: [18]
EPB is providing its gigabit internet service in Chattanooga Airport. They set up a demonstration area in the former gift shop. EPB also provides free high-speed Wi-Fi in Miller Plaza. [19] EPB is one of the largest providers of electric power in the US. [20] EPB has petitioned the FCC to allow them to deliver internet to communities outside of the 600 square mile area that they service. Nineteen states in the US have laws that make it difficult or impossible for utility companies to deliver internet outside of the area that they service. [21]
This section contains promotional content .(December 2017) |
In February 2008, the EPB Board of Directors approved a plan to construct a Smart Grid with 100% fiber-optic network as its backbone. [22] [23] It was also expected to be completely automated and a self-healing smart grid electrical distribution system.
In September 2010, EPB completed the construction of a 9,000-mile community-wide, 100% fiber optic network. As a result, EPB became the first connectivity provider in the United States to offer one gigabit-per-second (1,000 Mbit/s) internet speed to more than 175,000 homes and businesses. [24] This has attracted worldwide attention and earned Chattanooga the nickname "Gig City." [4]
The development of Chattanooga's Smart Grid completed in April 2012 with the installation of more than 200,000 sensors and smart devices, including the deployment of about 1,200 automated smart switches and other advanced power management equipment throughout the system. The initial build-out was completed in four years instead of the expected ten years. [25]
In September 2013, EPB increased its starting speed to 100 Mbit/s with no additional charge to current customers. [26] In 2019, EPB raised its starting speed to 300 Mbit/s.
In October 2014, EPB established a partnership with the U.S. Department of Energy and Oak Ridge National Laboratory to use Chattanooga's smart grid to test and develop new energy technologies. [27]
In October 2018, EPB joined with other community partners in the launch of the Chattanooga Smart Cities Community Collaborative, a joint effort to utilize the Chattanooga area's smart city infrastructure and other expertise and assets in the service of smart city research, including the establishment of a mile-long Smart City Testbed Corridor by the University of Tennessee at Chattanooga's Center for Urban Informatics and Progress. [28] [29] [30] As a result of research efforts completed by members of the Chattanooga Smart Cities Collaborative, Chattanooga was named an IDC Smart City in 2020 for a project to predict hotspots for traffic accidents and address them. [31] U.S. Ignite, a national innovation group led by the NSF and the OSTP, also recognized Chattanooga with a Smart 50 Award in 2019. [32]
In July 2020, EPB and its community partners announced HCS EdConnect, a program to provide the families of all economically challenged K–12 students with high-speed internet and a wireless router at no charge. The program was designed to ensure internet access for all K–12 students in need for at least ten years, with plans to raise the funding necessary to continue the program indefinitely. [33]
In January 2021, an independent study conducted by Bento Lobo, Ph.D. of the University of Tennessee at Chattanooga, documented $2.69 billion in benefits to the community during the first ten years after EPB built the community-wide fiber optic network and advanced smart grid. [34] According to the study, the implementation of EPB's fiber optic system has helped generate an estimated 9,516 jobs and $244 million in business ventures using the fiber optic network." [35]
According to Dr. Bento Lobo's study in 2021, the construction of Chattanooga's smart grid helped avoid 7,900 tons of CO2 emissions from 2014 to 2020 by allowing a significant reduction in road miles driven as well as enhanced power demand management and power factor improvement. [36]
In 2015, EPB partnered with TVA and other partners to provide home energy renovations at no charge to economically challenged homeowners through what is now called the "Home Uplift" program. In April 2021, EPB and its partners announced the completion of its 400th "Home Uplift." According to third-party analysis, each of the 400 homes saves 5,206 kWh on average each year which equates to more than $208,000 in total savings to customers and the avoidance of 1,472 metric tons of carbon emissions. [37]
In July 2017, EPB completed the construction of Solar Share, Chattanooga's first and only community solar installation. [38] The facility consists of 4,408 solar panels that can generate 1.3 megawatts of solar power, which is enough to meet the average energy needs of 130 homes. [39]
In October 2019, EPB's Solar Share community solar installation powered the 3rd International Placemaking Week Conference, making it Chattanooga's first conference with net-zero carbon. [40]
In November 2019, EPB earned the Leadership in Energy and Environmental Design (LEED) certification at the Gold level for an existing building. [41] The certification reflects EPB's success in dramatically reducing its environmental impact through energy efficiency, reduced water use, diverting waste from landfills through composting and recycling, and other measures. [42]
As part of the government-owned infrastructure in Chattanooga, EPB functions as one of the community's first responders to ensure uninterrupted fiber optic and electric power service in the event of natural disasters. [43]
On April 12, 2020, the Easter tornado outbreak that took place in the Chattanooga area disrupted the electric and fiber optic grids. More than 106,000 EPB customers lost power initially, with 44,000 regaining power within hours from Chattanooga's smart grid automatic processing. EPB leveraged mutual aid agreements to bring more than 1,500 utility workers from eight states to restore services for the remaining affected customers. In addition to the utility crews, EPB office employees also assisted by volunteering to distribute food and protective gear and coordinate the staging of reconstruction materials. [44]
When COVID-19 began in 2020, EPB provided community support through in-kind services and financial support, suspending disconnections and waiving late fees to ensure their customers could maintain connectivity, in addition to installing more than 130 Wi-Fi hotspots in publicly accessible areas and housing developments. [45] In July 2020, EPB joined Hamilton County Schools in launching HCS Ed Connect to provide home-based internet to all K-12 students and their families at no charge. [46] Although HCS EdConnect ensured that students could continue their studies remotely during the COVID-19 pandemic was the initial impetus for the program, it originally was designed to remain available to eligible families indefinitely so that it could serve as a lasting solution for bridging the digital divide for students in Hamilton County. [47]
EPB engaged TVA in matching donations to United Way of Greater Chattanooga's Restore Hope Fund to support individuals and families experiencing financial strain due to COVID-19, resulting in a total contribution of more than $785,000. [48]
In November 2020, EPB donated 5,000 face coverings to help local students and teachers stay safe amidst the COVID-19 pandemic. The donation of the face coverings benefitted five schools located in Hamilton County and was initiated by an Economic Recovery Group commissioned by Tennessee state Governor, Bill Lee. [49]
The Tennessee Valley Authority (TVA) is a federally owned electric utility corporation in the United States. TVA's service area covers all of Tennessee, portions of Alabama, Mississippi, and Kentucky, and small areas of Georgia, North Carolina, and Virginia. While owned by the federal government, TVA receives no taxpayer funding and operates similarly to a private for-profit company. It is headquartered in Knoxville, Tennessee, and is the sixth-largest power supplier and largest public utility in the country.
Chattanooga is a city in and the county seat of Hamilton County, Tennessee, United States. It is located along the Tennessee River, and borders Georgia to the south. With a population of 181,099 in 2020, it is Tennessee's fourth-most populous city and one of the two principal cities of East Tennessee, along with Knoxville. It anchors the Chattanooga metropolitan area, Tennessee's fourth-largest metropolitan statistical area, as well as a larger three-state area that includes Southeast Tennessee, Northwest Georgia, and Northeast Alabama.
Southern Company is an American gas and electric utility holding company based in the Southern United States. It is headquartered in Atlanta, Georgia, with executive offices located in Birmingham, Alabama. As of 2021 it is the second largest utility company in the U.S. in terms of customer base. Through its subsidiaries it serves 9 million gas and electric utility customers in 6 states. Southern Company's regulated regional electric utilities serve a 120,000-square-mile (310,000 km2) territory with 27,000 miles (43,000 km) of distribution lines.
Fiber to the x or fiber in the loop is a generic term for any broadband network architecture using optical fiber to provide all or part of the local loop used for last mile telecommunications. As fiber optic cables are able to carry much more data than copper cables, especially over long distances, copper telephone networks built in the 20th century are being replaced by fiber.
Haletown is an unincorporated community in Marion County, Tennessee, United States. It is part of the Chattanooga, TN–GA Metropolitan Statistical Area. Haletown is probably best known as the former location of Hales Bar Dam, a major hydroelectric project completed in 1913 by the former Tennessee Electric Power Company (TEPCO) and as a prominent location along the Tennessee River at Nickajack Lake.
Frontier Communications Parent, Inc. is an American telecommunications company. Known as Citizens Utilities Company until 2000, Citizens Communications Company until 2008, and Frontier Communications Corporation until 2020, as a communications provider with a fiber-optic network and cloud-based services, Frontier offers broadband internet, digital television, and computer technical support to residential and business customers in 25 states. In some areas it also offers home phone services.
Robert Phillips Corker Jr. is an American businessman and politician who served as a United States Senator from Tennessee from 2007 to 2019. A member of the Republican Party, he served as Chair of the Senate Foreign Relations Committee from 2015 to 2019.
The smart grid is an enhancement of the 20th century electrical grid, using two-way communications and distributed so-called intelligent devices. Two-way flows of electricity and information could improve the delivery network. Research is mainly focused on three systems of a smart grid – the infrastructure system, the management system, and the protection system. Electronic power conditioning and control of the production and distribution of electricity are important aspects of the smart grid.
Fiber to the premises (FTTP) in the United States is provided on a limited geographical basis by Google Fiber, Verizon, Lightower, and a number of smaller Internet Service Providers.
An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power transmission to carry power over long distances, and finally electric power distribution to customers. In that last step, voltage is stepped down again to the required service voltage. Power stations are typically built close to energy sources and far from densely populated areas. Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids, wide area synchronous grids, and super grids. The combined transmission and distribution network is part of electricity delivery, known as the power grid.
Andrew Lawrence Berke is an American attorney and politician from Tennessee. He served as the mayor of Chattanooga from 2013 to 2021. A member of the Democratic Party, he represented Hamilton and Marion counties in the 10th district as a state senator from 2007 to 2012. On March 5, 2013, he became Chattanooga's mayor-elect, winning more than 72% of the vote, and he was inaugurated on April 15, 2013. Berke was re-elected on March 7, 2017, and served until April 19, 2021, when he was succeeded by Tim Kelly. On October 6, 2022, President Joe Biden appointed Berke to serve as administrator of the Rural Utilities Service at the U.S. Department of Agriculture (USDA).
Jason Andrew "Drew" Johnson is an American political columnist, policy analyst, former think tank founder and executive, and the Republican nominee for Nevada's 3rd congressional district in the 2024 election.
The U.S. state of Tennessee contains a diverse economy that is made up of many sectors with a mix of industries including manufacturing, agriculture, healthcare, and tourism. The state is home to several major corporations, including FedEx, the largest courier company in the world, and AutoZone, the largest retailer of auto parts in the United States.
Cedar Falls Utilities (CFU) is a municipally-owned public utility serving Cedar Falls, Iowa and is a member of the Iowa Association of Municipal Utilities (IAMU). CFU provides municipal water service, electricity generation and distribution, natural gas service, and combined cable television, Internet access, and phone service to its customers. CFU serves approximately 19,000 Cedar Falls residents and businesses with over 14,900 broadband customers.
Google Fiber, sometimes stylized as GFiber, is a fiber broadband Internet service operated by Google Fiber Inc., a subsidiary of Alphabet, servicing a growing number of households in cities in 19 states across the United States. In mid-2016, Google Fiber was estimated to have about 453,000 broadband customers.
The Volkswagen Chattanooga Assembly Plant is an American automobile assembly plant in Chattanooga, Tennessee. The plant was formally announced in July 2008 and was formally inaugurated in May 2011.
Oncor Electric Delivery Company is the largest transmission and distribution electric utility in the state of Texas and the 5th largest utility company in the US. Their service territory includes east, west, and north-central Texas, including Dallas, Fort Worth, Irving, Plano, Arlington, Beeville, Midland, Odessa, Killeen, Waco, Wichita Falls, Tyler, and other cities throughout Texas. In 2018, Sempra Energy acquired a majority stake in Oncor for US$9.45 billion.
Vermont electric power needs are served by over twenty utilities. The largest is Green Mountain Power, a subsidiary of Énergir which recently also took over Central Vermont Public Service. Together this single company represents 70% of the retail customers in Vermont. The state is a small electricity consumer compared with other states. Therefore, its electricity sector has the lowest carbon footprint in the country. As of 2010, the state had the lowest wholesale electricity costs in New England. Efficiency Vermont engages in aggressive initiatives to cut residential electricity waste, which often identifies other problems that it claims can save hundreds per household per year. Accordingly, Vermont's overall energy bills are also relatively lower than in the rest of the New England states.
Gigabit Seattle was a fiber-to-the-home / fiber-to-the-business network planned to be deployed in Seattle, Washington. The network comes out of a partnership between the City of Seattle, the University of Washington and digital economic development company Gigabit Squared to deploy a next generation network in the City. The project is the second city project announced by Gigabit Squared as part of its Gigabit Neighborhood Gateway Program, after Gigabit Chicago.
As of 2022, there were about 18,500 electric vehicles in Tennessee.
{{cite web}}
: Missing or empty |url=
(help)