A filling factory was a manufacturing plant that specialised in filling various munitions, such as bombs, shells, cartridges, pyrotechnics, and screening smokes. In the United Kingdom, during both world wars of the 20th century, the majority of the employees were women.

Contents

In World War I, a filling factory belonging to the Ministry of Munitions was known as a National Filling Factory.

In World War II, a filling factory belonging to the Ministry of Supply was known as a Royal Filling Factory (RFF), or a Royal Ordnance Factory (ROF). These were all part of the Royal Ordnance Factory organisation, owned by the MoS.

The filling of smoke screen canisters and other pyrotechnic devices was also carried out by fireworks manufacturers, particularly in World War II, but these are not specifically covered by this article.

Raw materials

The filling factories' raw materials, such as TNT, RDX, or propellants, such as cordite, were manufactured in National Explosives Factories (World War I) or Explosive ROFs (World War II) and transported, by railway trains, to the filling factories for filling into munitions, produced at other plants.

High-explosives, such as TNT, had to be heated to melt them and the liquid was poured hot into heated shell cases. Care had to be taken to ensure that there were no voids in the poured explosive charge as this could lead to the shell detonating in the gun barrel during firing.

Shells and gun cartridges were manufactured in the UK, in World War II, by both the Engineering ROFs and private steel works / forging companies. It is believed that the empty brass cartridge cases for small arms were made at the Small Arms Ammunition Factories.

The filling factories produced their own pyrotechnics, such as fuses and screening smokes, as many of these were sensitive materials. They were then filled or assembled directly into the munitions.

They also would have sewn cotton bags for filling with primer composition or cordite charges.

Filling groups

Filling factories had a large number of buildings. Buildings were needed on the various groups for filling of munitions. Explosives magazines were required by each group to store the incoming explosive materials and to store the outgoing filled shells or gun cartridges, usually packed in ammunition boxes. Storage buildings were also needed on each group to store the incoming empty shells and the empty ammunition boxes.

For safety purposes, munitions were segregated into different compatibility groups. A World War II filling factory would generally fill several different groups of munitions; and these groups would be located in different geographical areas within the danger area of the filling factory.

The World War II groups were:

In addition, a filling factory would have provision for limited proofing and testing of its munitions; and burning grounds for disposal of waste explosive material.

Outside of this danger area, but still within the factory site, would be located:

UK World War I National Filling Factories

At the start of the War munition filling was carried out at Woolwich Arsenal, however it was soon realised that a massive increase in production of munitions was required. A 2015 study by Historic England looked into the 170 National Factories created in England by the Ministry of Munitions in the early part of WW1 (covering 174 locations), among these were the National Filling Factories, including a National Fuse Factory, 5 Trench Warfare Filling Factories, and 3 National Factories for Filling and Assembling Chemical Shells. [WW1 1] Filling of small bore ammunition was increased by the creation of 4 government cartridge factories. Most of the national filling factories followed similar designs with large sites with small lightweight buildings well separated and connected by raised walkways which had lightweight rail lines so materials could be wheeled between buildings on trolleys. Shells, fuses, packing cases, and explosives were brought in by rail to the edge of the factory, and completed munitions left by rail. All the filling work was carried out within the large 'clean area' by a large, mainly female, workforce. People entering the clean area had to change clothes and leave behind anything that could strike a spark, not just matches and lighters but all metal, even hairclips - one male worker being fined £5 for being in possession of 2 nails that he had used to replace a lost button on his trousers. [WW1 2]

While some of the factories were entirely built and managed by the Ministry of Munitions, others had local management. For instance NFF 10 was built on 109 acres of land owned by White and Poppe Ltd who had changed from engine production to manufacturing fuse bodies and 18pdr shell sockets. White and Poppe was given the contract for building the fuse filling plant in September 1915, and when completed in September 1916 it ran under their management. Unfortunately a problem with fuse failures caused a cessation of production in December 1916. The fault identified and the factory reorganised it restarted production in February 1917 as NFF 21, but still under White and Poppe management. [WW1 3]

When the Armistice came in November 1918, production was rapidly terminated and the female workforce laid off. A few sites, with much reduced male staff levels, were used for decommissioning unwanted ammunition. After clean up, most of the buildings, equipment, and stores were sold off by public auctions in the early 1920s.

NameLocationFromPeak WorkforceProductsNotes
Royal Arsenal Woolwich 17th Century80000VariedThe only filling factory in UK in 1914, eventually closing in 1967. Covering 1285 acres.
National Filling Factory No. 1 Barnbow, Leeds April 191616000Quick Fire Ammunition (18pdr to 6 inch)296 acres. Of the 13315 employees in Mar 1917, 12150 were women. Produced 50,000 shells per week by August 1918. An explosion in December 1916 killed 34 women. Since 2016 it is a scheduled monument (No 1415057) as the most complete surviving filling factory.
National Filling Factory No. 2 Aintree, Liverpool Jan 19168599Quick Fire Ammunition (18pdr to 6 inch)175 acres. Partly built to complete 18pdr shells shipped in from USA via Liverpool
National Filling Factory No. 3Willesden Lane, Perivale Dec 1915Components (fuses, detonators, gaines and primers)120 acres. In August 1917 a central experimental unit was setup to study methods for filling and assembling for all the NFFs. [WW1 4] An explosion in Sept 1919 (when being used for decommissioning munitions) caused damage but didn't escalate, but raised questions about the safety of munitions in London suburbs. [WW1 5]
National Filling Factory No. 4 Georgetown, Glasgow Jan 191611088Quick Fire Ammunition (13pdr, 18pdr, 3.4 inch, 12 inch shells)Area 250 acres, then second factory increased it to 540 acres.
National Filling Factory No. 5 Quedgeley, Gloucester Mar 1916636418pdr, 4.5 inch, 60pdr shells, cartridges and primers308 acres. Site cleared in mis 1920s, but was reused in 1939 as RAF Quedgeley
National Filling Factory No. 6 Long Eaton, Chilwell Feb 19167500High explosive shells (4.5 inch to 15 inch shells)208 acres. Suffered serious explosion 1 July 1918, 134 killed, 250 injured. Work restarted the next day. Chilwell produced over 19 million artillery shells by the end of the war.
National Filling Factory No. 7 Hayes Oct 191512500Components (fuses, Gaines) plus 18pdr shells also 4.5 and 6 in howitzerAlso known as Emergency Factory No.2. 200 acres. Had a separate 93acre explosives magazine at Northolt. This had a capacity of 2000 tons of explosive, and about 100 tons a day were delivered to Hayes by rail.
National Filling Factory No. 8Sumner St, Southwark Sept 1915Components (101-103 fuses, Gaines)60,000 sq feet factory also known as Emergency Factory No. 1
National Filling Factory No. 9 Banbury Apr 19161463Mainly high explosive shells (over 4.5 inch), some naval mines and chemical filling (HS)142 acres. Used until 1924 for breaking down unwanted ammunition.
National Filling Factory No. 10Whitmore Park, Coventry Mar 19163864Components (fuses, Gaines) for 18 pdr shells109 acres. Managed by White and Poppe Ltd. Due to a number of fuse failures in late 1916, once remedied this was renamed as NFF 21
National Filling Factory No. 11 Abbey Wood Jan 1916Components (fuses, Gaines)Managed by Kings Norton Metal Co, works built adjacent to their factory. Closed cApril 1918. [WW1 4]
National Filling Factory No. 12 Cardonald, Glasgow Jan 1916Components (detonators, gaines and primers)Near Cardonald railway station. Managed by Nobel's Explosives Ltd.
National Filling Factory No. 13White Lund, Morecambe Jul 1916High explosive shells (over 4.5 inch)250 acres. Managed by Vickers Ltd. Works destroyed by fire and explosion October 1917. A planned rebuild was abandoned in Spring 1916 except for a small portion for chemical gas filling. [WW1 4]
National Filling Factory No. 14Rotherwas, Hereford Nov 1916~8000High explosive shells (over 4.5 inch)519 acres. Built to provide backup capacity should Chilwell or Morecambe be out of commission. Changed to breaking down unwanted ammo after the war at least until 1921.
National Filling Factory No. 18 Burry Port, Pembrey Jun 19151050Filling 4.5in, 6in and 8in shellsOpened in June 1915, later nationalised. From May 1917 changed to disassembling defective munitions to recover components [WW1 4]
National Filling Factory No. 21Whitmore Park, Coventry Feb 1917Components (fuses, Gaines) for 18 pdr shellsNational Filling Factory no 10 was renumbered 21 after a fault in the production system had been fixed, as front line troops had learned to avoid munitions from NFF 10
National Filling Factory No. 22 Gainsborough, Lincolnshire Feb 1918Naval mines143 acres.
National Filling Factory No. 23 Chittening, South Gloucestershire June 19181100Filling shells with chloropicrin, later with dichloroethyl sulphide from the National Smelting Company at Avonmouth Docks [WW1 6] Operated by Nobel Explosives. By November 1918, Chittening had produced 85,424 mustard gas shells; but at a human cost of 1213 cases of associated illness, including two deaths which were later attributed to influenza. [WW1 7]
National Filling Factory No. 24Balmoral Road, Watford 2in and 3in mortar rounds and rifle grenades28 acres. Also known as Trench Warfare Filling Factory No 1 at Watford. Listed as NFF 24 in sale details Jan 1919. [WW1 8]
National Filling Factory No. 25 [WW1 9] Bushey Mill Lane, Callowland, Watford May 1916Heavy trench mortar and aerial bombs. Some chemical filling.Watford No 2 Trench Warfare Filling Factory. 40 acres, 26 sheds, 300 ton magazine. Chemical filling moved to Greenford Chemical Shell Assembly Station in Jan 1917.
National Filling Factory No. 28 Greenford Jan 1917Chemical shell fillingAlso known as Chemical Shell Assembling Station. Formerly Greenford dye works.
Trench Warfare Filling Factory Slade Green, Erith Oct 19152 inch mortars, used after the war for dismantling munitionsProbably had an NFF designation. 14 acre site near to the Thames Munition Works
Trench Warfare Filling FactoryDenaby, Rotherham Jan 19163 inch Stokes mortar bombsProbably had an NFF designation. Built near to (and managed by) British Westfalite's factory
Trench Warfare Filling FactoryStevenage Road, Fulham Aug 19153 inch Stokes mortar bombs, ball grenadesProssibly NFF 27. Nationalisation of W.E.Blake Explosives Loading Co factory in Feb 1916. 3 acres with separate explosives magazines at Worm Holt Farm, Shepherd's Bush.
Trench Warfare Filling FactoryBarlby Road, Selby 19162343 inch 'Russian' shellArdol Ltd (who had a carbon monoxide by-product of food manufacture), built and operated a factory to make phosgene and load into shells. Nationalised in June 1916. Shell filling moved elsewhere c1917. [WW1 10]
National Fuse FactoryChaul End, Luton Mid 19173000Fuses28 acre site built, staffed, and managed by George Kent Ltd who were already making munitions at Biscot Road, Luton

The recruitment of workers for the factories was specifically aimed at women, and in general the workforce at the filling factories was 80 to 90% women. An advert in the papers in January 1917 [WW1 11] was aimed at recruiting 8000 women workers for a munitions filling factory in North-West London (Willesden Employment Exchange). They had to be aged 20 to 40, and live not more than an hour away, though a lodgings register was available. The work was generally 54 hours a week, 'but may be more', and the pay was 27 shillings, day and night shifts had to be undertaken by all workers, a fortnight of each at a time. For more information on women in munitions during WW1 see munitionettes.

WW I references

  1. David Kenyon (9 November 2015). "First World War National Factories: An Archaeological, Architectural and Historical review". Historic England.
  2. News Snippet, Londonderry Sentinel, 31 July 1917, p4
  3. Review of the Work of National Filling Factory No 21, Coventry, The National Archive - MUN 5/155/1122/3/66
  4. 1 2 3 4 Official History of the Ministry of Munitions, Vol X, The supply of munitions, H.M. Stationery Office, 1922
  5. Alarming London Explosion, Sheffield Independent, 19 Sept 1919, p5
  6. Haber L.F. (1986). "10". The Poisonous Cloud. Oxford University Press. ISBN   9780198581420.
  7. Ian F.W. Beckett (31 December 2013). The Home Front 1914–1918: How Britain Survived the Great War. ISBN   9781472908896 . Retrieved 13 May 2014.
  8. National Filling Factory (No 24) Watford, Daily News (London), 23 Jan 1919, p2
  9. Watford and South West Herts in the Great War, Eugenia Russell, Quentin Russell, Pen and Sword, 31 Aug 2015, p70
  10. Paul Francis (October 1999). "Selby National Trench Warfare Factory". Ed Dennison Archaeological Services.
  11. More Women Workers - 8000 Wanted for Munitions, Evening Mail, 19 Jan 1917, p8

UK World War II Royal Ordnance Factory, filling factories

Some of these filling factories were temporary "war duration" only factories and they closed after the end of World War II. Other filling factories were designed to be permanent and to remain open after the War. However, only ROF Glascoed is still open and is now part of BAE Systems.

Twenty World War II filling factories were planned, but only 16 were built. The two largest UK filling factories were:

The other filling factories were:

Explanatory notes

  1. This was a re-opened WW1 National Filling Factory
  2. 1 2 3 4 Factory planned and number assigned, but not built
  3. Later part of the Atomic Weapons Establishment (AWE))

WW II references

See also

Related Research Articles

<span class="mw-page-title-main">Cordite</span> Smokeless propellant, used to replace gunpowder

Cordite is a family of smokeless propellants developed and produced in Britain since 1889 to replace black powder as a military firearm propellant. Like modern gunpowder, cordite is classified as a low explosive because of its slow burning rates and consequently low brisance. These produce a subsonic deflagration wave rather than the supersonic detonation wave produced by brisants, or high explosives. The hot gases produced by burning gunpowder or cordite generate sufficient pressure to propel a bullet or shell to its target, but not so quickly as to routinely destroy the barrel of the gun.

<span class="mw-page-title-main">ROF Bridgwater</span> Former factory between the villages of Puriton and Woolavington

Royal Ordnance Factory (ROF) Bridgwater was a factory between the villages of Puriton and Woolavington in the Sedgemoor district of Somerset, England that produced high explosives for munitions. It was slightly above sea level, between the 5-and-10-metre contour lines on Ordnance Survey maps. BAE Systems closed it when decommissioning was completed in July 2008.

<span class="mw-page-title-main">Shell (projectile)</span> Payload-carrying projectile

A shell, in a military context, is a projectile whose payload contains an explosive, incendiary, or other chemical filling. Originally it was called a bombshell, but "shell" has come to be unambiguous in a military context. A shell can hold a tracer.

<span class="mw-page-title-main">Royal Arsenal</span> Public community common, and housing, formerly a Military owned site

The Royal Arsenal, Woolwich is an establishment on the south bank of the River Thames in Woolwich in south-east London, England, that was used for the manufacture of armaments and ammunition, proofing, and explosives research for the British armed forces. It was originally known as the Woolwich Warren, having begun on land previously used as a domestic warren in the grounds of a mid-16th century Tudor house, Tower Place. Much of the initial history of the site is linked with that of the Office of Ordnance, which purchased the Warren in the late 17th century in order to expand an earlier base at Gun Wharf in Woolwich Dockyard.

<span class="mw-page-title-main">QF 18-pounder gun</span> WW1 British field gun

The Ordnance QF 18-pounder, or simply 18-pounder gun, was the standard British Empire field gun of the First World War-era. It formed the backbone of the Royal Field Artillery during the war, and was produced in large numbers. It was used by British Forces in all the main theatres, and by British troops in Russia in 1919. Its calibre (84 mm) and shell weight were greater than those of the equivalent field guns in French (75 mm) and German (77 mm) service. It was generally horse drawn until mechanisation in the 1930s.

ROF Glascoed was built as a UK government-owned, Royal Ordnance Factory (ROF). It was designed as one of 20 munitions filling factories. It was planned as a permanent ROF with the intention that, unlike some other similar facilities, it would remain open for production after the end of World War II. After privatisation of the Royal Ordnance Factories in the 1980s it became part of Royal Ordnance plc and later a production unit of BAE Systems.

An explosive ROF was a UK government-owned Royal Ordnance Factory (ROF), which specialised in manufacturing explosives during and after World War II. In World War I, the name used in the UK for government-owned explosives factories was National Explosives Factory; the cordite factory at Gretna was known as HM Factory, Gretna.

<span class="mw-page-title-main">Royal Ordnance Factory</span> Former type of UK government munitions factory

Royal Ordnance Factories (ROFs) were munitions factories run by the UK government during and after the Second World War. The three main types of factories were engineering, filling and explosives, and these were dispersed across the country for security reasons. ROFs were the responsibility of the Ministry of Supply and later the Ministry of Defence until privatisation in 1987.

ROF Thorp Arch was one of sixteen Second World War, UK government-owned Royal Ordnance Factory, which produced munitions by "filling" them. It was a medium-sized filling factory.

Royal Ordnance Factory (ROF) Elstow was one of sixteen UK Ministry of Supply, World War II, Filling Factories. It was a medium-sized filling factory,, which filled and packed munitions. It was located south of the town of Bedford, between the villages of Elstow and Wilstead in Bedfordshire. It was bounded on the northeast by the A6 and on the west by a railway line. Hostels were built nearby to accommodate the workers who were mostly female.

This article explains terms used for the British Armed Forces' ordnance (weapons) and ammunition. The terms may have different meanings depending on its usage in another country's military.

<span class="mw-page-title-main">ROF Bishopton</span>

The Royal Ordnance Factory Bishopton was a WW2 Ministry of Supply Explosive Factory. It is sited adjacent to the village of Bishopton in Renfrewshire, Scotland. The factory was built to manufacture the propellant cordite for the British Army and the Royal Air Force. It also later produced cordite for the Royal Navy. The Ministry of Works were responsible for the site. It was the biggest munitions factory the MOD had, with up to 20,000 workers.

<span class="mw-page-title-main">L118 light gun</span> Towed field gun

The L118 light gun is a 105 mm towed howitzer. It was originally designed and produced in the United Kingdom for the British Army in the 1970s. It has since been widely exported. The L119 and the United States Army's M119 are variants that use a different type of ammunition.

A World War I explosive factory, which was to be later known as NEF Pembrey was built, by Nobel's Explosives, with British Government approval, near the village of Pembrey, Carmarthenshire, Wales. The factory was built on a site consisting of mainly sandhills and sand dunes to provide some protection against damage caused by an explosion. Its main product was TNT (Trinitrotoluene) used for shell filling. The same site was used in World War II to build another explosive factory ROF Pembrey, which also made TNT.

<span class="mw-page-title-main">ROF Chorley</span> British munitions filing factory

ROF Chorley was a UK government-owned munitions filling Royal Ordnance Factory. It was planned as a permanent Royal Ordnance Factory with the intention that it, unlike some other similar facilities, would remain open for production after the end of World War II; and, together with ROF Bridgend, would replace the Royal Filling Factory located at the Royal Arsenal, Woolwich. It was built largely in Euxton, but was known as ROF Chorley.

<span class="mw-page-title-main">Small Arms Ammunition Factory</span>

The Small Arms Ammunition Factories (SAAF) were ammunition manufacturing plants run by the Australian government. Nearly all of their production was for domestic use by their military, the police forces, and government-appointed agents.

ROF Rotherwas was a Royal Ordnance Factory filling factory, No 4, located in Rotherwas, Dinedor Parish, Herefordshire, England.

National Filling Factory, Banbury, officially called National Filling Factory No. 9. was a British Ministry of Munitions filling factory, constructed during World War I and located in Banbury, Oxfordshire. The production of filled shells began in April 1916 and ended when the factory closed in 1924

<span class="mw-page-title-main">Defence Explosive Factory Maribyrnong</span> Historic site in Victoria, Australia

Defence Explosive Factory Maribyrnong is a heritage-listed military installation and former munitions factory at Cordite Avenue, Maribyrnong, Victoria, Australia. It was added to the Australian Commonwealth Heritage List on 22 June 2004.

<span class="mw-page-title-main">Defence Industries Limited</span>

Defence Industries Limited (DIL) was a subsidiary of Canadian Industries Limited (C-I-L), founded in 1939 to manufacture munitions for use in World War II. The company operated in number of locations in Canada, in the provinces of Ontario, Quebec, and Manitoba. Its Pickering Works shell-filling plant, along with nearby housing, grew into the town of Ajax.