Flatiron Construction

Last updated

Flatiron Construction Corporation, a subsidiary of Hochtief, is a heavy civil infrastructure contractor headquartered in Broomfield, Colorado in the United States.

Contents

Flatiron builds infrastructure such as bridges, highways, railways, roads, tunnels, hydropower facilities, oil, gas and industrial infrastructure for the transportation, energy and water sectors, specializing in large-scale infrastructure projects. The company conducts projects through contracting methods such as design-build and public-private partnerships.

History

Named after the flatiron rock formations found near Boulder, Colorado, Flatiron was originally a small materials company. In the late 1980s, the company conducted work along Interstate 70 (I-70) through the Glenwood Canyon Corridor in Colorado.

Flatiron opened two regional offices in California in the 1990s. In 1997, Flatiron worked on the first design-build bridge project in Maine, the Sagadahoc Bridge in Bath. [1] In 1998, Flatiron secured a contract for the Eastern Toll Road project. From 1999 to 2004, Flatiron worked on projects in Florida, Texas, Louisiana and the Carolinas, such as the Carolina Bays Parkway project. [2]

In 2005, Flatiron began working in Western Canada with their first public-private partnership project, the Park Bridge east of Golden, British Columbia. [3] Other projects during the 2000s include the Carquinez Bridge project in 2007, [4] the Port Mann Bridge/Highway 1 project in 2008, [5] the I-35 W Saint Anthony Falls Bridge in 2008, [6] and work in Utah in 2009.

Projects from the 2010s include Circle Drive in 2010, [7] the John James Audubon Bridge [8] over the Mississippi River, sections of the Anthony Henday Drive [9] project in Edmonton, Alberta, the Lake Champlain Bridge [10] connecting New York and Vermont and the Yadkin River Bridges in North Carolina. Flatiron has also worked on several contracts on the new eastern span of the San Francisco–Oakland Bay Bridge. [1] Flatiron has been part of a team that has bid on construction packages for the California High Speed rail and won a contract that was announced on December 12, 2014.

Dragados/Flatiron/Shimmick submitted a bid of $1.23 billion to design and build the 65-mile stretch from the south end of Fresno to near the Tulare-Kings county line and was deemed the “apparent best value” bidder by the California High-Speed Rail Authority. [11]

As of 2013 Flatiron operated across the U.S. and Canada, with more than 2,000 employees and 12 regional offices. Flatiron also works in heavy civil construction in the northeast via E.E. Cruz and Company. The company is a subsidiary of Flatiron and Turner Construction. [12]

Related Research Articles

<span class="mw-page-title-main">Marine Parkway–Gil Hodges Memorial Bridge</span> Bridge between Brooklyn and Queens, New York

The Marine Parkway–Gil Hodges Memorial Bridge is a vertical-lift bridge in New York City, New York, that crosses Rockaway Inlet. The bridge, which opened on July 3, 1937, connects the Rockaway Peninsula in Queens, with Flatbush Avenue to Floyd Bennett Field, Belt Parkway, and the Marine Park neighborhood in Brooklyn. The bridge is designated as New York State Route 901B, an unsigned reference route.

FasTracks is a multibillion-dollar public transportation expansion plan under construction in metropolitan Denver, Colorado, United States. Developed by the Regional Transportation District (RTD), the plan consists of new commuter rail, light rail, and express bus services. Six new light rail, electric commuter rail and diesel commuter rail lines with a combined length of 122 miles (196 km) will be constructed under the plan. It expands on previous transportation projects, notably T-REX, and includes 57 new transit stations and stops, 21,000 new parking spaces, 18 miles (29 km) of a bus service between Denver and Boulder and the renovation of Denver Union Station as a multi-modal transportation hub.

<span class="mw-page-title-main">Stoney Trail</span> Freeway in Calgary, Alberta

Alberta Provincial Highway No. 201, officially named Stoney Trail and Tsuut'ina Trail, is an approximately 92-kilometre (57 mi) freeway in Calgary, Alberta. It forms part of the CANAMEX Corridor which connects Calgary to Edmonton and Interstate 15 in the United States via Highways 2, 3, and 4. Planned for a total length of 101 kilometres, the final segment of the ring road is currently under construction to be completed by 2024 at the latest, delayed from an original target of 2022. The freeway serves as a bypass for the congested routes of 16 Avenue N and Deerfoot Trail through Calgary. At its busiest point near Beddington Trail in north Calgary, the six-lane freeway carried nearly 79,000 vehicles per day in 2019.

<span class="mw-page-title-main">South Carolina Highway 31</span> State highway in South Carolina

South Carolina Highway 31 (SC 31), also known as the Carolina Bays Parkway, is a 28.097-mile (45.218 km) six-lane, limited-access highway that parallels the Intracoastal Waterway around Myrtle Beach. The first phase opened on December 17, 2002, completing a 22-mile (35 km) link between U.S. Route 501 (US 501) and SC 9. The second phase opened in March 2005, running from US 501 southwest to S.C. Highway 544. The third phase opened on November 7, 2019, extending to SC 707. While usually referred to only as the Carolina Bays Parkway, the highway is also dedicated the John B. Singleton Parkway in memory of John B. Singleton, a former Myrtle Beach City Council member and police commissioner.

<span class="mw-page-title-main">Anthony Henday Drive</span> Freeway that encircles Edmonton, Alberta, Canada

Anthony Henday Drive (Highway 216) is a 78-kilometre (48 mi) freeway that encircles Edmonton, Alberta. It is a heavily travelled commuter and truck bypass route with the southwest quadrant serving as a portion of the CANAMEX Corridor that links Canada to the United States and Mexico. Henday is one of the busiest highways in Western Canada, carrying over 108,000 vehicles per day in 2019 at its busiest point near West Edmonton Mall. Rush hour congestion is common on the four-lane section in southwest Edmonton, where traffic levels have risen due to rapid suburban development. Work began in fall 2019 to widen this section to six lanes by the end of 2022.

<span class="mw-page-title-main">Hochtief</span> German construction company

Hochtief AG is a German construction company based in Essen, North Rhine-Westphalia, Germany. Hochtief is Germany's largest construction company and operates globally, ranking as one of the largest general construction companies in the United States through its Turner subsidiary, and in Australia through a 90% shareholding in CIMIC Group. In 2010 it employed more than 70,000 employees across five corporate divisions. One of these, Hochtief Concessions, is a major airport operator. The others are involved with construction project planning, finance, construction and operation. Work done in 2010 was €23.23 billion, with more than 80% coming from operations outside Germany.

<span class="mw-page-title-main">John James Audubon Bridge (Mississippi River)</span> Bridge in West Feliciana Parish, Louisiana

The John James Audubon Bridge, completed and opened in May 2011, is a Lower Mississippi River crossing between Pointe Coupee and West Feliciana parishes in south central Louisiana. The bridge has the second longest cable-stayed span in the Western Hemisphere at 1,583 ft (482 m), after Mexico's Baluarte Bridge with a 1,706 ft (520 m) span, and has a total length of 12,883 ft (3,927 m)—nearly three-and-a-half times longer than the Baluarte Bridge's 3,688 ft (1,124 m) total length. The Audubon Bridge replaces the ferry between the communities of New Roads and St. Francisville. The bridge also serves as the only bridge structure on the Mississippi River between Natchez, Mississippi and Baton Rouge, Louisiana. The bridge conveys Louisiana Highway 10, which is in a concurrence there with the Zachary Taylor Parkway.

<span class="mw-page-title-main">Lake Champlain Bridge (1929–2009)</span> Bridge in New York and Chimney Point, Vermont

The Champlain Bridge was a 2,184-foot-long (666 m) vehicular bridge in the United States that traversed Lake Champlain between Crown Point, New York and Chimney Point, Vermont. It was opened to traffic in 1929 as a toll bridge; the tolls were removed in 1987. The bridge was closed due to safety concerns on October 16, 2009, and was taken down by explosive demolition on December 28, 2009. It was replaced by a new bridge which opened on November 7, 2011.

<span class="mw-page-title-main">Sherwood Park Freeway</span> Highway in Alberta, Canada

Sherwood Park Freeway is a 7.1-kilometre (4.4 mi) freeway that connects east Edmonton to Sherwood Park in Alberta, Canada. It begins in the Gainer Industrial area, where Argyll Road and 82 (Whyte) Avenue merge, before it intersects 50 Street. It then curves slightly northeast through industrial areas in southeastern Edmonton across 34 Street into Strathcona County, then across 17 Street, and the freeway ends at Anthony Henday Drive. It then continues into Sherwood Park as Wye Road (Highway 630). It is primarily a commuter route, with heavier weekday volume westbound in the morning and eastbound in the afternoon, as residents of Sherwood Park commute to Edmonton.

TYLin is a global, multi-disciplinary infrastructure services firm. Headquartered in San Francisco, TYLin established its business in the design of long-span bridges and specialty structures.

Harrelson Boulevard is a four-lane highway in Myrtle Beach, South Carolina, named for Myrtle Beach's first mayor Dr. W. Leroy Harrelson Sr., who was elected to office in 1938. It starts at U.S. 17, and goes to Myrtle Beach International Airport and runs near Coastal Grand Mall. The highway is also the southern terminus for Grissom Parkway. It replaced the two-lane Jetport Road.

<span class="mw-page-title-main">I-35W Saint Anthony Falls Bridge</span> Bridge in Minneapolis, Minnesota

The I-35W Saint Anthony Falls Bridge crosses the Mississippi River one-half mile downstream from the Saint Anthony Falls in Minneapolis, Minnesota in the U.S., carrying north–south traffic on Interstate Highway 35W. The ten-lane bridge replaced the I-35W Mississippi River bridge, which collapsed on August 1, 2007. It was planned and is maintained by the Minnesota Department of Transportation (Mn/DOT). The planning, design, and construction processes were completed more quickly than normal because Interstate 35W is a critical artery for commuters and truck freight. The bridge opened September 18, 2008, well ahead of the original goal of December 24.

<span class="mw-page-title-main">Interstate 69 in Kentucky</span> Highway in Kentucky

Interstate 69 (I-69) in the US state of Kentucky is a 148.1-mile-long (238.3 km) freeway running from Fulton to Henderson. The route makes use of the entirety of the former Purchase Parkway and existing portions of I-24, the Western Kentucky Parkway, and the Pennyrile Parkway. Eventually, I-69 will leave the former Pennyrile Parkway just south of the Audubon Parkway interchange or remain on its current alignment and travel through Henderson on U.S. Route 41 (US 41) north into Indiana. The proposed route for the remainder of I-69 in Kentucky travels about 10 miles (16 km) to utilize an as-of-yet-unbuilt bridge into Indiana.

CIMIC Group Limited is an Australian construction contractor. It is active in the telecommunications, engineering and infrastructure, building and property, mining and resources, and environmental services industries. It has operations in Australia, Southeast Asia, New Zealand and the Middle East. Formerly listed on the Australian Securities Exchange, it is a subsidiary of Hochtief.

<span class="mw-page-title-main">Lake Champlain Bridge (2011–present)</span> Bridge in New York and Chimney Point, Vermont

The Lake Champlain Bridge is a vehicular bridge traversing Lake Champlain between Crown Point, New York and Chimney Point, Vermont. It replaced an older bridge that was demolished in 2009. The bridge was designed and constructed during an aggressive two-year schedule to minimize the social and economic impact of the original bridge's demolition. It is the only fixed-link crossing of Lake Champlain/Champlain canal between US 4 in Whitehall, 42 miles (68 km) to the south and US 2 at Rouses Point, 85 miles (137 km) to the north.

<span class="mw-page-title-main">Yellowhead Trail</span> Freeway in Edmonton, Alberta

Yellowhead Trail is a 24.6-kilometre (15.3 mi) expressway segment of the Yellowhead Highway in northern Edmonton, Alberta, Canada. It carries a significant amount of truck traffic to and from the industrial areas of north Edmonton and serves as a key commuter route for the bedroom communities of Stony Plain, Spruce Grove, and Sherwood Park, carrying nearly 80,000 vehicles per weekday in 2015. A suburban bypass of the route was completed when the northeast leg of Anthony Henday Drive (Highway 216) opened in late 2016, providing an alternate route through north Edmonton.

Majura Parkway is a 11.5-kilometre-long (7.1 mi) north–south parkway located in the Majura district of the Australian Capital Territory (ACT). It links the interchange with Federal Highway and Horse Park Drive at the edge of Gungahlin district to Monaro Highway in Fyshwick.

Nissan Parkway is a short divided highway in central Mississippi. The road starts at Mississippi Highway 22. It travels east to an interchange with Interstate 55 (I-55) and intersects a road leading to a Nissan assembly plant. The parkway then continues eastward to its eastern terminus at U.S. Route 51 and MS 16. Nissan Parkway was constructed in 2002 from MS 22 to I-55, after being proposed in one year before. The road was extended to its current eastern terminus by 2003.

<span class="mw-page-title-main">Construction of California High-Speed Rail</span> Ongoing infrastructure megaproject in California, US

The construction of the California High-Speed Rail system is an undertaking by the California High-Speed Rail Authority. The project is expected to span about 800 miles (1,300 km) and will be completed in two phases:

Michael Martin OBE is a British bridge engineer. He grew up in Carlisle and studied at the Carlisle Technical College before achieving a degree in civil engineering from the University of Leeds. Martin began his career as a design engineer at Ove Arup & Partners and served as their representative during the construction of the Kessock Bridge. He thereafter joined the contractor Morrison and was their chief engineer for the construction of the Dornoch Firth and Kylesku Bridges. Under Martin's direction the company won some of the first Private Finance Initiative infrastructure contracts in the UK. He transferred to Anglian Water after that company purchased Morrison in 2000 and became their head of health and safety. After a brief early retirement he returned as a consultant for WS Atkins and to lead a £2.2 billion water infrastructure partnership programme. He returned from retirement for a second time to act as Galliford Try representative on the board of the company constructing the £1.4 billion Queensferry Crossing. In 2014 he was appointed project director for all companies in the contracting joint venture and oversaw the project's completion in 2017.

References