Fulton, 1930 | |
History | |
---|---|
France | |
Name | Fulton |
Namesake | Robert Fulton |
Builder | Arsenal de Cherbourg |
Laid down | November 1913 |
Launched | 1 April 1919 |
Completed | July 1920 |
Out of service | May 1936 |
Fate | Stricken in May 1936 |
General characteristics | |
Type | Submarine |
Displacement | |
Length | 74 m (242 ft 9 in) |
Beam | 6.4 m (21 ft 0 in) |
Draught | 3.62 m (11 ft 11 in) |
Propulsion |
|
Speed |
|
Range |
|
Complement | 47 |
Armament |
|
The French submarine Fulton was a Joessel-class diesel-electric attack submarine built for the French Navy between 1913 and 1919. Fulton was built in the Arsenal de Cherbourg from 1913 to 1920, entered the French Marine Nationale in July 1920 and served until May 1936.
Fulton was ordered in the French fleet's 1914 program as part of the two ship Joessel class. The ships were designed by Jean Simonot, as a modification of his previous project, Gustave Zédé, using two Parsons steam turbines with a power of 2,000 hp (1,491 kW). During construction, though, the idea was abandoned and the ships were instead equipped with diesel engines. [1] [2] [3]
The submarine had a surfaced displacement of 870 long tons (884 t ) and a submerged displacement of 1,247 long tons (1,267 tonnes). The dimensions were 74 metres (242 feet 9 inches) long, with a beam of 6.4 m (21 ft 0 in) and a draught of 3.62 m (11 ft 11 in). She had two shafts powered by two diesel engines built by Schneider-Carels for surface running with a combined total of 2,700 hp (2,013 kW) and two electric motors which together produced 1,640 horsepower (1,220 kilowatts) for submerged propulsion. Her maximum speed was 16.5 knots (30.6 kilometres per hour; 19.0 miles per hour) on the surface and 11 knots (20 km/h; 13 mph) while submerged with a surfaced range of 4,300 nautical miles (8,000 kilometres; 4,900 miles) at 10 knots (19 km/h) and a submerged range of 125 nautical miles (232 km) at 5 knots (9.3 km/h). The boat's complement was 47 men. [1] [Note 1] [2] [3]
Fulton was armed with eight 450 mm torpedo tubes (four in the bow, two stern and two external trainable mounts), with a total of 10 torpedoes and two 75 mm (3.0 in) guns. [1] [2] [3]
Fulton was built in the Arsenal de Cherbourg. [3] She was laid down in November 1913, [1] launched on 1 April 1919, [2] [3] and was completed in July 1920. [1] Fulton was named after Robert Fulton, the American inventor of the first commercially successful steamboat [4] and first practical submarine, Nautilus, and received the pennant number Q 110. [3]
She was refitted during the 1920s when she received a new conning tower, bridge and two periscopes of 7.5 m (at the conning tower) and 9.5 m (at Headquarters). [1] [2] [3]
Fulton served in the Atlantic until the early 1930s when she was transferred to Indochina. [2] She was stricken in May 1936. [1] [3]
Rubis was one of six Émeraude-class submarines built for the French Navy in the first decade of the 20th century.
Opale was one of six Émeraude-class submarines built for the French Navy in the first decade of the 20th century.
Ajax was a Redoutable-class submarine of the French Navy launched in 1930 at Brest, France. It participated in the Second World War, first on the side of the Allies from 1939 to 1940 then on the side of the Axis for the rest of the war. On 23 September 1940, during the Battle of Dakar she was badly damaged by depth charges from HMS Fortune and was then scuttled.
The Requin-class submarines were a class of nine diesel-electric attack submarines built for the French Navy in the mid-1920s. Most saw action during World War II for the Vichy French Navy or the Free French Naval Forces. Nine ships of this type were built in the shipyards of Brest, Cherbourg and Toulon between 1923 and 1928. The class was part of the French Marine Nationale, serving in the Mediterranean Sea. All member ships took part in World War II, fighting on both sides of the conflict; Four were captured by Italian forces and sunk by the Allies. Only one ship survived the war - Marsouin, decommissioned shortly after the war's end.
The French submarine Caïman was a Requin-class submarine built for the French Navy in the mid-1920s. Laid down in August 1924, it was launched in March 1927 and commissioned in February 1928. On 9 June, Caïman narrowly missed the British light cruiser HMS Ajax off Syria. It was scuttled at Toulon on 27 November 1942 to prevent her capture by the Germans, then raised in February 1943. It was sunk again on 11 March 1944 by Allied aircraft.
Aigrette was the lead boat of the Aigrette-class submarines built for the French Navy between 1902 and 1905. Laid down in May 1902, she was launched in February 1904 and commissioned in 1908. She was essentially an experimental submarine, and although in service during World War I, saw no action. The class was designed by Maxime Laubeuf and used Drzewiecki drop collar launchers and external cradles to launch torpedoes.
Cigogne was the second of two Aigrette-class submarines built for the French Navy between 1903 and 1905. Laid down in May 1902, she was launched in November 1904 and commissioned in July 1906. She was an essentially experimental submarine, and although in service during World War I, saw no action. The class was designed by Maxime Laubeuf and used Drzewiecki drop collar launchers and external cradles to launch torpedoes.
The Lagrange-class submarines were a class of four submarines built for the French Navy during World War I and the interwar period. Three ships of this type were built in the Arsenal de Toulon from 1913 to 1924, and one was built at the Arsenal de Rochefort shipyard. Entering the French Marine Nationale from 1918 to 1924, the submarines served until the mid-1930s.
The French submarine Laplace (Q111) was a Lagrange-class submarine built for the French Navy built between 1913 and 1919. It was laid down in the Arsenal de Rochefort shipyards and launched on 12 August 1919. Laplace was completed in 1921 and served in the French Marine Nationale until 1935.
The French submarine Lagrange (Q112) was a Lagrange-class submarine built for the French Navy built between 1913 and 1918. It was laid down in the Arsenal de Toulon shipyards and launched on August 12, 1919. Lagrange was completed in 1918 but saw no action during World War I and served in the French Marine Nationale until 1935.
The French submarine Regnault (Q113) was a Lagrange-class submarine built for the French Navy built between 1913 and 1924. It was laid down in the Arsenal de Toulon shipyards and launched on 25 June 1924. Regnault was completed in 1924 and served in the French Marine Nationale until 1937.
The French submarine Romazotti (Q114) was a Lagrange-class submarine built for the French Navy built between 1914 and 1918, during World War I. It was laid down in the Arsenal de Toulon shipyards and launched on March 31, 1918. Romazotti was completed in 1918 and served in the French Marine Nationale until 1937.
The Joessel-class submarines were a class of two diesel-electric submarines built for the French Navy laid down before the start of World War I and completed after. They were built in the Arsenal de Cherbourg from 1913 to 1920, before entering the French Marine Nationale in 1920 and serving until 1936.
The French submarine Joessel was a Joessel-class diesel-electric attack submarine built for the French Navy between 1913 and 1919. Joessel was built in the Arsenal de Cherbourg from 1913 to 1917, entered the French Marine Nationale in February 1920 and served until 1936.
The Armide-class submarines were a class of three diesel-electric submarines built for the Greek and Japanese Navies before and during World War I. They were built in the Schneider-Creusot shipyards 1913 to 1918, but were seized during the war by the French government before they could be sold. The Armide class ships operated in the Mediterranean during the course of World War I and were stricken from the Navy list between 1928 and 1935.
Armide was a submarine ordered by the Japanese Navy from the Schneider-Creusot shipyard before World War I but was requisitioned by the French government before it was launched. Armide operated in the Mediterranean during the course of World War I and was stricken from the Navy list in July 1932.
The French submarine Amazone was an Armide-class diesel-electric attack submarine built for the Greek Navy before and during World War I. It was built in the Schneider-Creusot shipyards between 1913 and 1916, but was seized during the war by the French Government before it could be sold, on 3 June 1915. Amazone operated in the Adriatic Sea during the course of World War I and was stricken from the Navy list in July 1932.
The French submarine Antigone was an Armide-class diesel-electric attack submarine originally ordered by Greece. It was built in the Schneider-Creusot shipyards between 1912 and 1917, but was requisitioned on 30 May 1917 by the French Government before it was delivered. Antigone operated in the Mediterranean during the course of World War I and was stricken from the Navy list in August 1935.
The French submarine Argonaute was an experimental attack submarine built for the French Navy between 1903 and 1911. Initially named Omega, Argonaute was laid down in January 1903, launched in November 1905 and commissioned in 1911. She was essentially an experimental submarine, and although in service during World War I, saw no action. Argonaute was decommissioned in 1919.
Pierre Chailley was a French Navy minelayer submarine commissioned in 1923. She was the ancestor of the Saphir-class submarines, which were the last French minelayer submarines. She was decommissioned in 1936.