Harvard Bridge

Last updated

Harvard Bridge
2017 Harvard Bridge from Memorial Drive, Cambridge, Massachusetts.jpg
Seen from Cambridge (2017)
Coordinates 42°21′16″N71°05′29″W / 42.35457°N 71.09132°W / 42.35457; -71.09132
CarriesMA Route 2A.svg Route 2A
Crosses Charles River
Locale BostonCambridge, Massachusetts, United States
Maintained by MassDOT
ID number B160124EYDOTNBI
Characteristics
DesignHaunched girder bridge
MaterialSteel
Total length2,164.8 ft (387.72 sm; 659.82 m) [1] (roadway)
364.4 smoots ± one ear (620 m) (sidewalk from Storrow Drive to Cambridge only)
Width69.3 ft (12.42 sm; 21.13 m) (total width) [1]
52 ft (9.3 sm; 15.8 m) (roadway) [2]
No. of spans25 [3]
Piers in water24 [3]
Load limit86.4 short tons (78.4 t) [2]
Clearance below 12 ft (2.2 sm; 3.7 m) [2]
History
Constructed by Boston Bridge Works [4]
Construction start1887
Construction end1891
OpenedSeptember 1, 1891;132 years ago (1891-09-01), [5] 1990
Closed1983 (temporary closure for repairs)
Statistics
Daily traffic 49,000 as of 2005 [2]
Location
Harvard Bridge

The Harvard Bridge (also known locally as the MIT Bridge, the Massachusetts Avenue Bridge, and the "Mass. Ave." Bridge) is a steel haunched girder bridge carrying Massachusetts Avenue (Route 2A) over the Charles River and connecting Back Bay, Boston with Cambridge, Massachusetts. It is the longest bridge over the Charles River at 2,164.8 feet (387.72  sm ; 659.82  m ). [1]

Contents

After years of disagreement between the cities of Boston and Cambridge, the bridge was built jointly by the two cities between 1887 and 1891. [6] It was named for Harvard University founder John Harvard. [7] Originally equipped with a central swing span, it was revised several times over the years until its superstructure was completely replaced in the late 1980s due to unacceptable vibration and the collapse of a similar bridge in Connecticut.

The bridge is known locally for being marked off in the idiosyncratic unit of length called the smoot. [8] [9]

Conception

In 1874 the Massachusetts Legislature authorized construction of a bridge between Boston and Cambridge, [10] and in 1882 follow-up legislation set out its location. [11]

The bridge was to have a draw with an opening of at least 38 feet (12 m; 6.8 sm). [11] Boston interests opposed the bridge, mainly because it did not provide for an overhead crossing of the Grand Junction Branch of the Boston and Albany Railroad. Further legislation in 1885 changed the draw to a clear opening of at least 36 feet (11 m; 6.4 sm) and no more, until the other bridges below the proposed location were required to have a larger opening. [12] There was still no substantive progress until 1887, when Cambridge petitioned the Legislature to compel Boston to proceed; the resulting act required each city pay half the cost, and allowed Boston to raise up to $250,000 (US$8,140,000 with inflation [13] ) for this purpose, in excess of its debt limit. This implied an estimated cost of US$500,000 (US$16,300,000 with inflation [13] ) for the bridge.

The Legislature provided for a bridge commission, to consist of the mayors of Boston and Cambridge plus a third commissioner to be appointed by the mayors. [14] The mayors of Boston and Cambridge, Hugh O'Brien and William E. Russell, appointed Leander Greeley of Cambridge as the third commissioner, [15] though this appointment changed over time. [16]

Year(s)Mayor of BostonMayor of CambridgeThird Commissioner
1887–1888 Hugh O'Brien William E. Russell Leander Greeley
1889–1890 Thomas N. Hart Henry H. Gilmore
1891 Nathan Matthews, Jr. Alpheus B. AlgerLeander Greeley (died February 15, 1891 [17] or February 16, 1891 [18] )
George W. Gale

The commission's 1892 report claimed: [17]

The effect that the bridge will have upon both cities is obvious. The low land and marshes on the Cambridge side, formerly almost valueless, have been filled in and have become valuable; and Cambridge is now connected with the choicest residential portions of Boston. The residents of the Back Bay, South End, Roxbury, and other southern sections of Boston are now connected directly, by way of West Chester park and the bridge, with Cambridge, Belmont, Arlington, and adjacent towns; and this thoroughfare in Boston, it is believed, will ultimately be the central one of the city.

Name

The bridge is named for the Reverend John Harvard, for whom Harvard University is also named, rather than for the university itself. Other names suggested included Blaxton, Chester, Shawmut, and Longfellow. [7] [lower-alpha 1]

Engineering

Postcard showing Harvard Bridge looking toward Boston in 1910, from the roof of the Riverbank Court Hotel (now Maseeh Hall, an MIT dormitory) Harvard Bridge postcard, 1910.jpg
Postcard showing Harvard Bridge looking toward Boston in 1910, from the roof of the Riverbank Court Hotel (now Maseeh Hall, an MIT dormitory)
Postcard showing Harvard Bridge, looking toward Cambridge and MIT sometime between 1916 and 1924 Harvard Bridge postcard 1920ish.jpg
Postcard showing Harvard Bridge, looking toward Cambridge and MIT sometime between 1916 and 1924

Originally projected as a wooden pile structure with stone pavement for the first 200 feet (61 m; 36 sm) (because the Charles River Embankment extension was expected to take that space) the design was changed to be entirely iron spans on stone piers. The general plans were approved on July 14, 1887. [19] The engineers were William Jackson (Boston City Engineer), John E. Cheney (assistant Boston City Engineer), Samuel E. Tinkham (assistant engineer), and Nathan S. Brock (assistant engineer at bridge). [20]

The subsurface conditions at the bridge location are extreme. Much of Boston is underlain with clay, but the situation at the bridge is exacerbated by a fault which roughly follows the path of the Charles River itself. From a depth of approximately 200 to 300 feet (60 to 90 m; 40 to 50 sm) below existing ground, is a very dense till composed of gravel and boulders with a silt-clay matrix. Above that to approximately 30 feet (9 m; 5 sm) below the surface is Boston blue clay (BBC). Over this are thin layers of sand, gravel, and fill. The BBC is overconsolidated up to a depth of approximately 70 feet (20 m; 10 sm). [3]

The substructure originally consisted of two masonry abutments and twenty-three masonry piers, as well as one pile foundation with a fender pier for the draw span. The superstructure was originally twenty-three cantilevered fixed spans and suspended spans, of plate girders with one swing span. [21] The Boston abutment rests on vertical piles, while the Cambridge end is directly on gravel. [3]

Originally, the bridge was built across the Charles River connecting West Chester Park, in Boston, with Front Street, in Cambridge. This is now called Massachusetts Avenue on both sides of the river. As originally built, the total length between centers of bearings on abutments was 2,164 feet 9 inches (659.82 m; 387.72 sm) with a draw 48 feet 4 inches (14.73 m; 8.66 sm) wide between centers. The width of the bridge was 69 feet 4 inches (21.13 m; 12.42 sm) except near and on the draw. [22]

The bridge as built was composed of fixed and suspended spans roughly 75 feet (23 m; 13.4 sm) long and piers 90 feet (27 m; 16 sm) apart, center to center. [23] The span lengths alternated between 75 and 105 feet (23 and 32 m; 13.4 and 18.8 sm). The longer spans were cantilevered, while the shorter spans were suspended between the cantilevers. [3]

The original roadway contained two lanes for horse-drawn vehicles and two street car tracks, for a total width of 51.0 feet (15.5 m; 9.13 sm). There were also two 9-foot-2-inch (2.79 m; 1.64 sm) sidewalks. [6] The original roadway and sidewalk stringers were of wood, with an approximately 1.25-inch (32 mm; 0.0187 sm) thick covering of asphalt on the sidewalk and a 2-inch (51 mm; 0.030 sm) spruce wearing surface on the roadway. [6]

The exception was at the swing span, which was 48 feet (15 m; 8.6 sm) wide. This span was approximately 149 feet (45 m; 26.7 sm) long, and sat on a wooden pier. It was a double-cantilevered, electrically-driven structure also carrying a bridge caretaker's house. [6]

The bridge opened on September 1, 1891. [5] The original cost of construction was $511,000, [24] $16,640,000 in current dollars. [13]

Maintenance and events

Harry Houdini before he jumped from the bridge 1908 Harry Houdini jumps from Harvard Bridge, Boston, Massachusetts, 1908 - John H. Thurston, stereopticons LCCN2015650990 - restoration.jpg
Harry Houdini before he jumped from the bridge 1908

In 1898, 3-foot-wide (0.91 m; 0.54 sm) bicycle lanes were installed next to each curb. [6] In 2011 (113 years later), the City of Boston finally connected these lanes to its own bike lanes. [25]

A marker near the southeast end of the bridge memorializes one of Harry Houdini's "well known escapes", during which he jumped from the bridge on May 1, 1908. (Other sources give the date as April 30, 1908.) [26]

The bridge was declared unsafe in 1909, requiring all of the iron and steel to be replaced. The draw was elevated slightly and the trolley rails were replaced as well. [27]

When the Metropolitan District Commission (MDC) took control of the bridge in 1924, they rebuilt much of the bridge superstructure. They replaced the wooden stringers with steel "I" beams, topped wooden deck elements with concrete and brick, and replaced the street car rails. [6] Structural steel hangers replaced wrought iron. The swing span was converted into two 75-foot (23 m; 13.4 sm) fixed spans the same width as the rest of the bridge. The wooden pier was heavily modified with concrete and stone to make it resemble the other piers, increasing the number of stone piers from 23 to 24. [3] [28]

Heavy traffic at the Mass Ave and Memorial Drive intersection on the Cambridge end of the bridge led to the construction of an underpass in 1931. [8]

The bridge was formerly referred to as the "Xylophone Bridge" because of the sound its wooden decking made when traffic traveled over it. This decking was replaced in 1949 with 3-inch (76 mm; 0.045 sm) concrete-filled "I-beam lok" grating topped with a 2.25-inch (57 mm; 0.0336 sm) thick bituminous wearing surface. At this time, all bearings were replaced, and the trolley car tracks were removed, as were granite blocks. The trolley car poles were reused for street lights. Ramps between the bridge and the under-construction Storrow Drive were added. [8]

The 1924 sidewalk slabs were replaced by precast, prestressed slabs in 1962. [8] The fifteen expansion dams were replaced or repaired in 1969. [29]

Engineering study, 1971–1972

The Harvard Bridge is decorated with both serious and whimsical works of art. Harvard Bridge Art.JPG
The Harvard Bridge is decorated with both serious and whimsical works of art.

An engineering study was performed by the Metropolitan District Commission (later merged into the Department of Conservation and Recreation) in 1971–1972 due to complaints by bridge users of excessive vibration. [8] [30] The bridge was found to be understrength for its load. Before the final study was complete, the recommendation was to place a load limit of 8 short tons (7.3  t ) per axle and a total of 15 short tons (14 t) per vehicle, or to restrict trucks to the interior lanes, where the bridge was stronger. A 25-short-ton (23 t) limit was imposed. [31]

Suggestions made included strengthening the existing structure by adding either struts or plates to make the existing four beams along the length of the bridge into a stiffening truss, or to replace the superstructure with a new one, made of either steel or concrete, which would be up to current standards. [30] The recommendation was to replace the superstructure with one weighing approximately the same in order to reuse the piers, which were in good condition. [31]

The reasoning was that the cost of a new structure could be predicted much more easily than the cost of repairing and reinforcing the existing bridge. The resulting new bridge would be of known materials and quality, such as ductile structural steel rather than brittle wrought iron, and rated at AASHO HS-20. Repairing the existing structure would leave old wrought iron of uncertain quality and condition standing, and would not bring the design up to (then) current standards. [31] Detailed engineering calculations were included. [32] The price was estimated at US$2.5 million to US$3 million [31] (US$17,000,000 to US$21,000,000 with inflation [13] ).

The action taken based on this study was to establish load restrictions on the bridge, 15 short tons (14 t) in the outer lanes, 25 short tons (23 t) on the inner lanes. This was expanded in 1979 to a flat limit of 15 short tons (14 t) on the whole bridge. [33]

Superstructure replacement, 1980s

After the failure of the Mianus River Bridge at Greenwich, Connecticut in 1983, the Harvard Bridge was shut down and inspected because it contained similar elements, specifically the suspended spans. [34] [35] Traffic was restricted to the inner two lanes due to the discovery of two failed hangers on span 14. A few days later, all trucks and buses were banned from the bridge. [33]

In 1986, a report was published containing the plan to replace the superstructure on the existing supports. Alternatives considered were very similar to the 1972 report, and were similarly decided. [36] Structural modifications included an upgrade from four longitudinal girders to six of the same shape and replacement of a stairway with a handicapped pedestrian ramp on the Boston end of the bridge. [37]

Ramp "B", from southbound (Boston bound) bridge lanes to eastbound Storrow Drive, caused traffic to merge onto Storrow Drive from the left (high speed) lanes using a short acceleration lane, causing safety issues. The MDC requested elimination of this ramp. Compared to overall bridge traffic of 30,000 vehicles per day, traffic on ramp B was found to be low, approximately 1,500 vehicles per day with a peak of 120 vehicles per hour. [38]

The historic value of the bridge was considered significant, so the plan was to make the replacement superstructure appear similar, with similar railing and lighting. In order to document the pre-existing structure, a Historic American Engineering Record (HAER) would be prepared. [39]

Pier 12 was exhibiting inappropriate movement and was scheduled for reinforcement. [40]

The work would be done in two phases. Phase 1 would reinforce the downstream side of the bridge to allow MBTA bus traffic, and was expected to take 5 months. Most of this effort would be spent on the underside of the bridge and would not affect existing traffic. Phase 2 would replace the entire superstructure and was expected to take three construction seasons to implement. Cost was estimated to be US$20M [40] (US$53,000,000 with inflation [13] ). Phase 1 finished in 1987, and Phase 2 in 1990. [41]

Subsequent events

In the fall of 2014, the Charles River Conservancy announced that an anonymous donor would fund an upgrade of the street lights for both the roadway and both sidewalks on the bridge. [42] [43] The new roadway and aesthetic lighting was installed in 2015, highlighting the smoot marks along the sidewalk. The design was selected after a competition won by Miguel Rosales of Rosales + Partners. [44] [45] [46] The light posts will be located 30 smoots (167.5 ft; 51.05 m) apart. [47] "It will provide safe lighting for pedestrians and drivers, and the elements of design on the bridge will be pulled out and emphasized. It will become a really beautiful bridge," said Renata von Tscharner, founder and president of the Charles River Conservancy. [48] [49]

Harvard Bridge Separated Bicycle Lanes

In November 2021, to improve bicycle safety, MassDOT initiated a separated bicycle lane pilot on the Harvard by placing cones to create two wide bicycle lanes. This reduced general purpose lanes from four to two over the bridge. Despite some hiccups involving vandalism, the pilot was deemed a success in the Fall 2022. MassDOT went on to hire Toole Design Group to engineer flex-post separated bicycle lanes, bus priority lanes, and new traffic signal phasing for the corridor. These changes were implemented just before 2023, and have been in place since. To this date, the Harvard Bridge remains one of the most popular cycling routes in New England, with an average of over 1,000 bicyclists in each direction per day.

Smoots

Smoot mark 210, east side of the bridge Smoot mark 210, east.jpg
Smoot mark 210, east side of the bridge

The Harvard Bridge is marked off in an idiosyncratic unit of measure, the smoot.

In 1958, members of the Lambda Chi Alpha fraternity at MIT measured the bridge's eastern sidewalk by using that year's shortest pledge, Oliver Smoot nominally, 5 feet 7 inches (1.70 m) tallas a measuring stick. [8] [9] Years after this stunt, Smoot became president of the American National Standards Institute (ANSI), and later president of the International Organization for Standardization (ISO). [50]

Markers painted at 10-smoot (55.83 ft; 17.02 m) intervals give the bridge's length 364.4 smoots long, "plus one ear". Originally this read "plus or minus one ear"representing measurement uncertainty [51] but over the years the words "or minus" disappeared. [52] The marks are repainted twice each year by members of the fraternity [8] [53] [ failed verification ]originally surreptitiously and later openly. [54]

During the major reconstruction in the 1980s, the new sidewalks were divided into smoot-length slabs rather than the standard six feet, and the smoot markings were painted on the new deck. [55] Officials' original determination to omit the smoot markings from the reconstructed bridge, and to scrupulously prevent the fraternity from repainting them, evaporated when it was realized that police routinely used the smoot marks as reference points in accident reports. [54]

The nominal length of 364.4 smoots (from two designated points at the bridge's ends) corresponds to about 2030 feet or 620 m, somewhat less than the bridge's published length of 2,170 feet; 390 smoots (660 m). [1] [22] A possible cause is that in 1958, there were ramps to Storrow Drive on both sides of the bridge, which interrupted the sidewalk earlier than it extends today. A bridge of 2,164.8 feet (659.82 m) [1] [56] corresponds to 387.7 smoots ± one ear.

Harvard bridge panorama.jpg
Panoramic view from Harvard Bridge in the winter, looking east (downstream), with the Cambridge shore on the left and the Boston shore on the right. The Longfellow Bridge is in the middle of the image, far downstream, with the triangular Zakim Bridge further behind it.

See also

Related Research Articles

<span class="mw-page-title-main">Smoot</span> Non-standard unit of length

The smoot is a nonstandard, humorous unit of length created as part of an MIT fraternity pledge to Lambda Chi Alpha by Oliver R. Smoot, who in October 1958 lay down repeatedly on the Harvard Bridge between Boston and Cambridge, Massachusetts, so that his fraternity brothers could use his height to measure the length of the bridge.

<span class="mw-page-title-main">Red Line (MBTA)</span> Rapid transit line in Massachusetts, US

The Red Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south and east underground from Alewife station in North Cambridge through Somerville and Cambridge, surfacing to cross the Longfellow Bridge then returning to tunnels under Downtown Boston. It continues underground through South Boston, splitting into two branches on the surface at JFK/UMass station. The Ashmont branch runs southwest through Dorchester to Ashmont station, where the connecting light rail Ashmont–Mattapan High Speed Line continues to Mattapan station. The Braintree branch runs southwest through Quincy and Braintree to Braintree station.

<span class="mw-page-title-main">Longfellow Bridge</span> Bridge in Massachusetts

The Longfellow Bridge is a steel rib arch bridge spanning the Charles River to connect Boston's Beacon Hill neighborhood with the Kendall Square area of Cambridge, Massachusetts. The bridge carries Massachusetts Route 3, the MBTA Red Line, bicycle, and pedestrian traffic. The structure was originally known as the Cambridge Bridge, and a predecessor structure was known as the West Boston Bridge; Boston also continued to use "West Boston Bridge" officially for the new bridge. The bridge is also known to locals as the "Salt-and-Pepper Bridge" due to the shape of its central towers.

<span class="mw-page-title-main">Sellwood Bridge</span> Bridge in Portland, OR

The Sellwood Bridge is a deck arch bridge that spans the Willamette River in Portland, Oregon, in the United States. The current bridge opened in 2016 and replaced a 1925 span that had carried the same name. The original bridge was Portland's first fixed-span bridge and, being the only river crossing for miles in each direction, the busiest two-lane bridge in Oregon. The Sellwood Bridge links the Sellwood and Westmoreland neighborhoods of Portland on the east side with Oregon Route 43/Macadam Avenue on the west side. At its east end it leads to Tacoma Street. The bridge is owned and operated by Multnomah County. The original span of 1925 was a steel truss bridge, while its 2016 replacement is a deck-arch-type bridge.

<span class="mw-page-title-main">Tobin Bridge</span> Bridge in Boston, Massachusetts, US

The Maurice J. Tobin Memorial Bridge is a cantilever truss bridge that spans more than two miles (3.2 km) from Boston to Chelsea over the Mystic River in Massachusetts. The bridge is the largest in New England. It is operated by the Massachusetts Department of Transportation and carries U.S. Route 1. It was built between 1948 and 1950 and opened to traffic on February 2, 1950, replacing the former Chelsea Bridge. The 36-foot (11 m)-wide roadway has three lanes of traffic on each of the two levels with northbound traffic on the lower level and southbound traffic on the upper level.

<span class="mw-page-title-main">Boston University Bridge</span> Bridge over the Charles River between Boston and Cambridge, Massachusetts

The Boston University Bridge, originally the Cottage Farm Bridge and commonly referred to as the BU Bridge, is a steel truss through arch bridge with a suspended deck carrying Route 2 over the Charles River, connecting the Boston University campus to Cambridge, Massachusetts.

The Sagamore Bridge in Sagamore, Massachusetts carries Route 6 and the Claire Saltonstall Bikeway across the Cape Cod Canal, connecting Cape Cod with the mainland of Massachusetts. It is the more northeastern of two automobile canal crossings, the other being the Bourne Bridge. Most traffic approaching from the north follows Massachusetts Route 3 which ends at Route 6 just north of the bridge, and the bridge provides direct expressway connections from Boston and Interstate 93.

<span class="mw-page-title-main">Huey P. Long Bridge (Jefferson Parish)</span> Road and railroad bridge in Louisiana, U.S.

The Huey P. Long Bridge, located in Jefferson Parish, Louisiana, is a cantilevered steel through-truss bridge that carries a two-track railroad line over the Mississippi River at mile 106.1, with three lanes of US 90 on each side of the central tracks. It is several kilometers upriver from the city of New Orleans. The East Bank entrance is at Elmwood, Louisiana, and the West Bank at Bridge City.

<span class="mw-page-title-main">Coraopolis Bridge</span> Bridge in Coraopolis, Pennsylvania

The Coraopolis Bridge is a girder bridge over the back channel of the Ohio River connecting Grand Avenue on Neville Island to Ferree Street in Coraopolis, Pennsylvania. It opened in 1995 to replace a structure of historic significance. The original Pratt/Bowstring/Pennsylvania through truss spans, designed by Theodore Cooper, were formerly the (third) Sixth Street Bridge, spanning the Allegheny River, in downtown Pittsburgh, and were built in 1892 by the Union Bridge Company. They were floated downstream by the Foundation Company in 1927 rather than being demolished when the bridge was removed to enable construction of the present (fourth) Three Sisters (Pittsburgh) Sixth Street Self-anchored suspension bridge. However, by the late 1980s, the old bridge could no longer support traffic volumes and was replaced by a newer structure.

<span class="mw-page-title-main">University Heights Bridge</span> Bridge between Manhattan and the Bronx, New York

The University Heights Bridge is a steel-truss revolving swing bridge across the Harlem River in New York City. It connects West 207th Street in the Inwood neighborhood of Manhattan with West Fordham Road in the University Heights neighborhood of the Bronx. The bridge is operated and maintained by the New York City Department of Transportation.

<span class="mw-page-title-main">Milton–Madison Bridge</span> Continuous truss bridge that connects Milton, Kentucky and Madison, Indiana across the Ohio river

The Milton–Madison Bridge is a continuous truss bridge that connects Milton, Kentucky and Madison, Indiana. It carries approximately 10,000 cars a day. The old structure was replaced with a completely new continuous truss which was constructed on temporary piers adjacent to the operational span between 2011 and 2012 and slid into place after demolition of the old span using a construction method called "truss sliding." The new crossing opened to vehicle traffic in April 2014, and a pedestrian sidewalk opened that October.

<span class="mw-page-title-main">North Avenue Bridge</span> Bridge in Chicago, Illinois

The North Avenue Bridge can refer to one of three bridges that has carried North Avenue over the North Branch of the Chicago River on the north side of Chicago, Illinois. A center-pier swing bridge built in 1877 was replaced in 1907 by a bascule bridge, allowing river traffic more room for maneuvering in and out of the North Canal, just north of Goose Island.

<span class="mw-page-title-main">Walnut Lane Memorial Bridge</span> Bridge in Philadelphia, Pennsylvania

The original Walnut Lane Memorial Bridge was a prestressed concrete girder bridge in Philadelphia, Pennsylvania, designed by Belgian Engineer Gustave Magnel and built by the City of Philadelphia. Completed and fully opened to traffic in 1951, this three-span bridge carried Walnut Lane over Lincoln Drive and Monoshone Creek. It was the first major prestressed concrete beam bridge designed and built in the United States when completed.

<span class="mw-page-title-main">Anderson Memorial Bridge</span> Bridge in Massachusetts to Boston, Massachusetts

Anderson Memorial Bridge connects Allston, a neighborhood of Boston, and Cambridge. The bridge stands on the site of the Great Bridge built in 1662, the first structure to span the Charles River. It brings Boston traffic into Harvard Square and was finished in 1915.

<span class="mw-page-title-main">Washington Crossing Bridge</span> Bridge in New Jersey and Washington Crossing section of Upper Makefield Township, Pennsylvania

Washington Crossing Bridge is a truss bridge spanning the Delaware River that connects Washington Crossing, Hopewell Township in Mercer County, New Jersey with Washington Crossing, Upper Makefield Township in Bucks County, Pennsylvania. It was built in 1904 by the Taylorsville Delaware Bridge Company. The bridge is currently owned and operated by the Delaware River Joint Toll Bridge Commission.

<span class="mw-page-title-main">Schell Bridge</span> Bridge in Northfield, Massachusetts

The Schell Memorial Bridge is a steel cantilever Pennsylvania (Petit) truss bridge spanning the Connecticut River in the town of Northfield, Massachusetts. Designed by Edward S. Shaw, the bridge abutments and piers were built by the firm of Ellis & Buswell of Woburn, Massachusetts, and the superstructure was built by the New England Structural Company of East Everett, Massachusetts. The bridge was commissioned by Francis R. Schell, who gave $42,000 for design and construction. Construction began in 1901 and was completed in 1903. In 1985, due to advanced deterioration of the steel truss members, the bridge was barricaded and abandoned.

<span class="mw-page-title-main">Willimansett Bridge</span> Bridge in Massachusetts to Holyoke, Massachusetts

The Willimansett Bridge is a steel truss bridge over the Connecticut River located between Chicopee, Massachusetts and Holyoke, Massachusetts. It carries Massachusetts state routes 116 and 141.

<span class="mw-page-title-main">Locke Avenue Bridge</span> Bridge in Swedesboro, New Jersey

Locke Avenue Bridge is located on Locke Avenue, a two-lane rural route located at the northwest corner of Swedesboro in Gloucester County, New Jersey. This roadway runs generally north-south, connecting Auburn Road with U.S. Route 322. The posted speed limit on Locke Avenue is 40 miles per hour (60 km/h).

<span class="mw-page-title-main">Tomlinson Lift Bridge</span> Bridge in Connecticut, United States

The Tomlinson Lift Bridge is a crossing of the Quinnipiac River in New Haven, Connecticut. The bridge forms a segment of U.S. Route 1. The Tomlinson Vertical Lift Bridge carries four lanes of traffic across New Haven Harbor and a single-track freight line owned by the Providence & Worcester Railroad that connects the waterfront with the Northeast Corridor line of Metro North and CSX. A sidewalk is present along the southern edge of the bridge.

<span class="mw-page-title-main">Chelsea Street Bridge (Boston)</span> Bridge

The Chelsea Street Bridge is a vertical-lift bridge that carries Chelsea Street between East Boston, Massachusetts, and Chelsea, Massachusetts, over the Chelsea Creek. It opened to traffic on May 12, 2012, after a $125.3M construction project replaced the previous bridge, a single-leaf bascule-type drawbridge. The span is 450 feet (140 m) with a vertical clearance, when opened, of 175 feet (53 m). There are two lanes and a sidewalk in each direction.

References

Informational notes

  1. The structure now called the Longfellow Bridge opened 15 years later, originally called the Cambridge Bridge, was given its current name in 1927.

Citations

  1. 1 2 3 4 5 Harvard Bridge at Structurae
  2. 1 2 3 4 Department of Conservation and Recreation National Bridge Inventory (2012). "Place Name: Boston, Massachusetts; NBI Structure Number: 417208078401120; Facility Carried: Route 2A; Feature Intersected: Charles River". Nationalbridges.com (Alexander Svirsky). Retrieved March 28, 2012.
  3. 1 2 3 4 5 6 HAER, p.4
  4. Massachusetts Commissioner (1892). Harvard Bridge Boston to Cambridge. Rockwell and Churchill. p. 16 via New York Public Library.
  5. 1 2 Alger & Matthews 1892, p. 15.
  6. 1 2 3 4 5 6 HAER, p. 3
  7. 1 2 Alger & Matthews 1892, p. 14.
  8. 1 2 3 4 5 6 7 HAER, p. 5
  9. 1 2 "This Month in MIT History, "The Tech", volume 119, number 49". Tech.mit.edu. Retrieved October 17, 2014.
  10. Alger & Matthews 1892, p. 5.
  11. 1 2 Alger & Matthews 1892, pp. 5–6.
  12. Alger & Matthews 1892, p. 9.
  13. 1 2 3 4 5 1634–1699: McCusker, J. J. (1997). How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States: Addenda et Corrigenda (PDF). American Antiquarian Society. 1700–1799: McCusker, J. J. (1992). How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States (PDF). American Antiquarian Society. 1800–present: Federal Reserve Bank of Minneapolis. "Consumer Price Index (estimate) 1800–" . Retrieved February 29, 2024.
  14. Alger & Matthews 1892, pp. 10–12.
  15. Alger & Matthews 1892, p. 13.
  16. Alger & Matthews 1892, p. 31.
  17. 1 2 Alger & Matthews 1892, p. 30.
  18. "Recent Deaths". Boston Evening Transcript. Boston, Massachusetts: Boston Transcript Company. February 16, 1891. p. 2. Retrieved April 17, 2012. Mr. Leander Greeley, a prominent master builder of Boston and Cambridge and one of the three Harvard Bridge Commissioners, died this morning. Mr. Greeley, who in health was a man of fine physique, had of late been subject to ailments for which he had sought Florida as a relief. He was an enterprising and public-spirited citizen of Cambridge, where he had often been called by the public to positions of trust. He was also a working member of several benevolent orders. There are many monuments of his skill as a builder in and about Boston, including many churches. The Master Builders' Association will sincerely mourn his loss. He was about sixty years old and leaves a family.
  19. Alger & Matthews 1892, pp. 13–14.
  20. Alger & Matthews 1892, p. 32.
  21. Alger & Matthews 1892, pp. 18–26.
  22. 1 2 Alger & Matthews 1892, p. 17.
  23. Alger & Matthews 1892, p. 18.
  24. Alger & Matthews 1892, p. 29.
  25. Kaiser, Johanna (January 6, 2012). "Mass. Ave, BU Bridge bike lanes completed". Boston Globe. New York Times Co. Retrieved March 20, 2012. The city installed bike lanes on the northbound and southbound lanes between Huntington Avenue and the Harvard Bridge, connecting them to existing bike lanes, just before the start of the new year.
  26. Clinger, Julia (June 1, 2007). It Happened in Boston . It Happened In (1st ed.). TwoDot. pp.  61–63. ISBN   978-0-7627-4134-2.
  27. "Famous Harvard Bridge Unsafe" (PDF). New York Times. July 16, 1909. Retrieved March 20, 2012. The famous Harvard Bridge connecting Cambridge and Boston was declared to be unsafe in a report made to-day by a commission of Boston and Cambridge engineers, and announcement was made that work would be started on Monday next to strengthen the structure. The commission finds that all of the iron and steel beams of the bridge, which is nearly three-quarters of a mile long, will have to be replaced by new ones, at the same time the draw will be elevated slightly, and new surfacing will be put on. The Boston elevated railway company, which operates its cars across the bridge, is ordered to install new rails and new supports.
  28. "Commonwealth Begins Work on Harvard Bridge" (PDF). The Tech. Cambridge, Massachusetts: Massachusetts Institute of Technology. October 3, 1924. p. 5, col. 4. Retrieved April 27, 2009.
  29. HAER, p.6
  30. 1 2 Leet, phase 2
  31. 1 2 3 4 Leet, phase 3
  32. Leet, phase 3, appendices
  33. 1 2 HAER, p.8
  34. Keane, Tom (September 10, 2006). "It's the Engineering, Stupid". Boston Globe Magazine. Boston Globe . Retrieved September 11, 2006.
  35. "AROUND THE NATION; Boston's Harvard Bridge Closed to Heavy Trucks". The New York Times. United Press International. July 6, 1983. Retrieved April 13, 2009.
  36. Replacement, p.7
  37. Replacement, p.4
  38. Replacement, page 4-6
  39. Replacement, p.11. Note the use of the HAER document throughout this article.
  40. 1 2 Replacement, page 5
  41. Ronald Rosenberg, Globe Staff (September 12, 1990). "MASS. AVE. BRIDGE TO REOPEN FOUR LANES AFTER SEVEN YEARS". Boston Globe. Boston, Massachusetts. p. 35 (METRO section).
  42. "Smoot lighting: $2.5 million gift will brighten Mass. Ave. bridge - Metro - The Boston Globe". BostonGlobe.com. Retrieved October 17, 2014.
  43. "$2.5 million gift will shed light on the Harvard Bridge". Thecharles.org. Retrieved October 17, 2014.
  44. "Smoot Lighting to Set the Mood on Harvard Bridge". Archived from the original on November 29, 2014. Retrieved November 21, 2014.
  45. Ramos, Nestor (October 14, 2014). "$2.5 million gift will shed light on the Harvard Bridge". Boston Globe. Boston Globe . Retrieved October 22, 2014.
  46. "With Smoot design, Harvard Bridge is the latest to shine". Boston Globe. Boston Globe. October 21, 2014. Retrieved October 22, 2014.
  47. "Smoot legacy continues on Harvard Bridge - The Tech". Tech.mit.edu. Retrieved November 20, 2014.
  48. "An Anonymous Donor Is Bringing Light to the Mass. Ave. Bridge". Bostonmagazine.com. September 2, 2014. Retrieved October 17, 2014.
  49. "An Anonymous Donor is Bringing Light to the Mass. Ave. Bridge". Thecharles.org. Retrieved October 17, 2014.
  50. "Oliver R. Smoot". American National Standards Institute (ANSI). Retrieved January 10, 2014.
  51. Tavernor, Robert, Smoot's Ear: the Measure of Humanity (Yale University Press, 2007; paperback edition 2008), ISBN   978-0-300-12492-7, Preface
  52. "Smoot in Stone". MIT News. Cambridge, Massachusetts: Massachusetts Institute of Technology. June 4, 2009. Retrieved July 20, 2010. Specifically noting the bridge's length of 364.4 Smoots (+/- 1 ear), the plaque, a gift of the MIT Class of 1962, honors the prank's 50th anniversary.
  53. "MIT Tech Review article". Alumweb.mit.edu. Retrieved October 17, 2014.
  54. 1 2 Brehm, Denise (September 1, 1999). "Keyser describes his top five hacks - MIT News Office". MIT News. Cambridge, Massachusetts: Massachusetts Institute of Technology. Retrieved March 4, 2012. When the bridge was rebuilt in the 1980s, the Cambridge police requested that the smoots remain because they use them to indicate precise locations in accident reports.
  55. Fahrenthold, David A. (December 8, 2005). "The Measure of This Man Is in the Smoot". The Washington Post. Washington DC. Retrieved April 20, 2009. And then there was a little help from the government: When the bridge was renovated about 15 years ago, officials agreed to let the markings stay, even going so far as to score the sidewalk at 5-foot-7 Smoot intervals instead of the usual six-foot ones.
  56. Alger and Matthews, p. 17

Bibliography