Iron Range and Huron Bay Railroad

Last updated
One of the two 4-8-0 locomotives owned by the IR&HB. They were later sold to the Algoma Central Railway. IRHB 480 locomotive.jpg
One of the two 4-8-0 locomotives owned by the IR&HB. They were later sold to the Algoma Central Railway.

The Iron Range & Huron Bay Railroad (IR&HB) is a defunct railroad constructed to haul iron ore in Michigan's Upper Peninsula during the 1890s. Financial and engineering problems prevented the railroad's operation; it remains an unusual example of a railroad which was completed but never used.

Contents

Background

Rich iron ore deposits were first discovered in the Upper Peninsula in the 1840s, and remain a significant source of wealth for the state. By the 1890s Michigan was the largest supplier of iron ore in the United States. Railroads would haul ore from the mines to great ore docks on the Great Lakes in places such as Escanaba and Marquette, where it would be loaded on ore freighters and transported to the rest of the country. The Huron Mountains west of Marquette were known to be rich in ore deposits, particularly around Lake Michigamme (near Michigamme, Michigan), and were believed to contain marble, granite, silver, gold, lead, graphite, asbestos, and silica. [1]

History

The IR&HB faced hilly country throughout; some grades reached 5-8%. IRHB railroad cut.jpg
The IR&HB faced hilly country throughout; some grades reached 5–8%.
The ore dock at Skanee, Michigan. The steamer Christopher Columbus is in the foreground. IRHB ore dock.jpg
The ore dock at Skanee, Michigan. The steamer Christopher Columbus is in the foreground.

The IR&HB was formed on June 27, 1890 by seven businessmen, [2] all from Michigan's Lower Peninsula and all but one from Detroit. Milo H. Davis, [3] [4] also of Detroit, was engaged as chief engineer.

The company proposed to construct a line from Champion, near the Lake Michigamme ore fields, to a new ore dock on Huron Bay [5] (in Arvon Township), which connected to Lake Superior. From there the ore would be shipped by freighter through the Soo Locks. [6]

Construction

The terrain for the line proved forbidding. The country was hilly and broken; grading the roadbed proved an expensive and intensive activity. By June 1891 an initial workforce of 500 men had swelled to 1,500, which strained the local transportation network. The builder, Wallace Dingman of Battle Creek, Michigan, ran out of money in August and abandoned work, leaving the IR&HB with unpaid bills and swamping Marquette County's limited poor relief resources. [7] New contractors were hired and the grading was finally finished in the summer of 1892, reportedly at the cost of $400,000well above the $265,000 budgeted for the project. One major obstacle was a 1,000-foot (305 m) cut near Mount Arvon, from which 40,000 cubic yards (31,000 m3) of rock were removed. The rails were laid between July and November 1892. [8]

The ore dock was built on the shores of Huron Bay for $170,000 under the supervision of John Munro, Jr. It measured 1,000 feet (305 m) in length and required 2,000,000 board feet (4,719 m3) of lumber. A sawmill was constructed to process the vast amounts of timber necessary for the project. [9]

Failure

Although the IR&HB completed the 42-mile (68 km) line [10] between Champion and Huron Bay and purchased two 4-8-0 "Mastodon" steam locomotives from the Brooks Locomotive Works, no trains were ever operated. Reference Barnett implies 35 miles in his calculates; Dompier claims 42 miles, as does the Times article cited below. The completion of the line coincided with the Panic of 1893, which reduced the demand for iron ore. Additionally, the ore mines around Lake Michigammewhich the IR&HB had intended to servebegan to play out. There were richer mines in Ishpeming to the east, but the IR&HB lacked the wherewithal to construct such a line, which would have spanned 15 to 20 miles (24 to 32 km). In places the IR&HB line exceeded a grade of 5%, which would have made the haulage of freight difficult. For a standard-gauge non-rack rail railroad like the IR&HB, 3% was "excessive" and anything over 4.5% unheard of. Some sources claim the IR&HB exceeded 8% in places. [11]

A test run was done with one of the newly delivered locomotives. A number of internet sources cite differing times, length of the travel and the outcome. A fair use quote of the 2 M ride page from Sam Beck, a railroad watchman: “As the last eleven miles of the road were downgrade, we decided the uphill run from Huron Bay would be a good test. I was in the cab with the engineer and we had proceeded just a short distance up the grade when the railroad gave way and we went into a ditch.” “From that moment on, the Iron Range and Huron Bay Railroad ceased to exist as a railroad!” [12]

By 1893 the IR&HB found itself in serious financial difficulties. In 1890 it had begun with $1,400,000 in capital through an initial stock issue coupled with the sale of bonds. Additional bonds worth $600,000 were sold to cover construction overruns and keep the railroad afloat, but its debts mounted. Finally, in 1900, the company's owners sold it outright to the Detroit Construction Company for $110,000. [13]

Legacy

Following the sale the Detroit Construction Company dismantled the entire line. The 67 pound per yard rails were re-used in various interurban schemes in the Lower Peninsula, [14] including the Grand Rapids, Holland and Lake Michigan Rapid Railway and the Detroit, Lake Orion and Flint Railway.

The two locomotives were sold for $14,000 to Francis Clergue [14] of the Algoma Central Railway. A track was built to the lighter at the dock and the engines, under their own steam were loaded onto the tugboat Daniel L. Hebard. [14] The great ore dock was dismantled and shipped to Detroit. [14] [15]

Davis, the chief engineer, was reported (by a few newspaper articles) to have fled to Mexico to escape allegations of fraud. [16] But no one knows that for sure. [17] [18] According to the New York Times , the state took possession of the right-of-way [19] and other property as compensation for unpaid taxes; Marquette County purchased the section within its borders in 1902 for $1,600 and converted it into a roadway. [15] [20]

In 1905 the Lake Superior Southern Railway [21] proposed to construct a new line from Huron Bay to Madison, Wisconsin; the company failed to attract financing and dissolved in 1908. [15]

The "Rock Cut" midway along the line has become a local tourist attraction. Various out of state news sources misquote its 1,300 ft long length and 60 foot depth. Source - The Negaugnee Iron Herald, August 5th, 1892. [22]

Local historians are investigating a possibility of linking a predecessor operation (only the first mile or so) to the IR&HB Railroad, Huron Bay Terminus Railway. [23] This highly detailed page does document a large part of the IR&HB right-of-way and shows many details of the local slate mining industry that once existed in that era.

Notes

  1. Barnett (2007), 46.
  2. "Ore Docks on Huron Bay :: Wesley Perron Railroad Collection". updigit.uproc.lib.mi.us. Marquette, Mi: The Mining Journal. October 11, 1890. Retrieved 30 October 2021. It is reported that the CM&StP is behind the IR&HB, of which James M. Turner is one of the incorporators.
  3. Elections and Officials Changes (Volume 16 ed.). Philadelphia, Pa.: Railway World, Railroad and Mining Register. August 9, 1890. p. 753. Retrieved 26 October 2021.
  4. George H. Frost (September 6, 1890). "Construction News - Iron Range & Huron Bay". Engineering News and American Railway Journal. University of Chicago. 24 (27): 219. Retrieved 26 October 2021. The preliminary surveys have been completed and location is now in progress for this line, which is projected to run from Huron Bay to Champion, Mich., 60 miles. The work is generally light, maximum grade 20 ft. per mile and maximum curve 5'. The road is being built for the iron ore trade. The contract for construction has been let to Wallace Dingman, of Battle Creek, Mich. The road to be completed in August, 1890.
  5. "Huron Bay". Natural Atlas. Natural Atlas, Inc. Retrieved 30 October 2021. better map than Wikipedia
  6. Barnett (2007), 47.
  7. J. Long (June 21, 1893). "Michigan Slate Co. v. Iron Range & Huron Bay Railroad, 101 Mich. 14 (1894)". Caselaw Access Project - Harvard Law School Library. Michigan Supreme Court 101 Mich. 14. Retrieved 26 October 2021. This action was commenced by attachment to recover against the defendant company the value of certain merchandise. Plaintiff claims under a written guaranty, signed by Milo Davis, chief engineer of the railroad company, as follows:
  8. Barnett (2007), 48–9.
  9. Barnett (2007), 47–9.
  10. Barnett (2007), 46.
  11. Barnett (2007), 49–50.
  12. Frimodig, David M. (2013). "The Iron Range and Huron Bay Railroad really did exist – for twenty long minutes". Michigan Natural Resources March-April 1969. Grand Marais, MI: Great Lakes Pilot Publishing Inc. Retrieved 30 October 2021.
  13. Barnett (2007), 50.
  14. 1 2 3 4 "Pictures Reveal Fabulous Story of Two Million Dollar Train". The Mining Journal. Soo Line Archives. April 29, 1950.
  15. 1 2 3 Barnett (2007), 51.
  16. "Railroad Fraud". Michigan Historical Center, Department of History, Arts and Libraries. 2006-05-18. Archived from the original on 2007-12-19. Retrieved 2007-12-25.
  17. "Detroit School Trustees Arrested". No. XCIV, 33. Norwalk, Ct: Norwalk Gazette. August 17, 1894. p. 8. Retrieved 29 October 2021. At a meeting of the city school trustees Joseph A. Walsh, William C. Liphart, Milo H. Davis and Julius Leichtenberg were arrested and taken to police headquarters, charged with accepting bribes. The investigation was instigated by Mayor Pingree and the complaint was sworn to by Defective Palmer, who worked up the case.
  18. "Michigan Happenings". No. 37. Milford Oakland Co., Mi: The Milford Times - I.P. Jackson. October 20, 1894. p. 2. Retrieved 29 October 2021. The disappearance of Milo H. Davis some weeks ago to avoid arrest on the same charge gave color to the accusation
  19. Board of Trustees and Officers. "Points of Interest in Our Local Area – CBHHS". Champion, M: Champion-Beacon-Humboldt Historical Society. Retrieved 30 October 2021. The grade developed formed much of the current CR 607 and provided important access to the Huron Mountains region.
  20. "News of the Railroads; Passenger Agents of Big Roads Deny that a Fight Is Imminent Against Excess Fares". New York Times . August 26, 1900. Retrieved 2007-12-25.
  21. Chief Engineer's Office, L.S.S.Ry. (September 2, 2015). "Lake Superior Southern Railway". Maps and Atlases in Our Collections. Oshakosh, Wi: Wisconsin Historical Society. Retrieved 28 October 2021.
  22. "The Rock Cut". The Negaugnee Iron Herald. August 5, 1892.
  23. Stull, Marshall (15 February 2021). "Huron Bay Terminus Railway – Slate Mining in Michigan". Small Model Railroads. Retrieved 28 October 2021.

Related Research Articles

Marquette, Michigan City in Michigan, United States

Marquette is a city in Marquette County in the U.S. state of Michigan. The population was 20,629 at the 2020 United States Census, which makes it the largest city in the Upper Peninsula. It also serves as the county seat of Marquette County. Located on the shores of Lake Superior, the city is a major port, known primarily for shipping iron ore. The city is partially surrounded by Marquette Charter Township, but the two are administered autonomously.

Upper Peninsula of Michigan Northern major peninsula of the U.S. state of Michigan

The Upper Peninsulaof Michigan – also known as Upper Michigan or colloquially the U.P. – is the northern and more elevated of the two major landmasses that make up the U.S. state of Michigan; it is separated from the Lower Peninsula by the Straits of Mackinac. It is bounded primarily by Lake Superior to the north, separated from the Canadian province of Ontario at the east end by the St. Marys River, and flanked by Lake Huron and Lake Michigan along much of its south. Although the peninsula extends as a geographic feature into the state of Wisconsin, the state boundary follows the Montreal and Menominee rivers and a line connecting them.

The Pere Marquette Railway operated in the Great Lakes region of the United States and southern parts of Ontario in Canada. It had trackage in the states of Michigan, Ohio, Indiana and the Canadian province of Ontario. Its primary connections included Buffalo; Toledo; and Chicago. The company was named after Père Jacques Marquette S.J. (1637–1675), a French Jesuit missionary who founded Michigan's first European settlement, Sault Ste Marie.

Grand Trunk Western Railroad American railroad

The Grand Trunk Western Railroad Company is an American subsidiary of the Canadian National Railway operating in Michigan, Illinois, Indiana, and Ohio. Since a corporate restructuring in 1971, the railroad has been under CN's subsidiary holding company, the Grand Trunk Corporation. Grand Trunk Western's routes are part of CN's Michigan Division. Its primary mainline between Chicago and Port Huron, Michigan serves as a connection between railroad interchanges in Chicago and rail lines in eastern Canada and the Northeastern United States. The railroad's extensive trackage in Detroit and across southern Michigan has made it an essential link for the automotive industry as a hauler of parts and automobiles from manufacturing plants.

Duluth, Missabe and Iron Range Railway

The Duluth, Missabe and Iron Range Railway (DM&IR), informally known as the Missabe Road, was a railroad operating in northern Minnesota and Wisconsin that used to haul iron ore and later taconite to the Great Lakes ports of Duluth and Two Harbors, Minnesota. Control of the railway was acquired on May 10, 2004, by the Canadian National Railway (CN) when it purchased the assets of Great Lakes Transportation.

<i>Michigan Services</i>

Michigan Services are three Amtrak passenger rail routes connecting Chicago, Illinois with the Michigan cities of Grand Rapids, Port Huron, and Detroit, and stations en route. The group is a component of the Midwest Regional Rail Initiative.

Duluth, South Shore and Atlantic Railway

The Duluth, South Shore and Atlantic Railway (DSS&A) was an American railroad serving the Upper Peninsula of Michigan and the Lake Superior shoreline of Wisconsin. It provided service from Sault Ste. Marie, Michigan, and St. Ignace, Michigan, westward through Marquette, Michigan to Superior, Wisconsin, and Duluth, Minnesota. A branchline stretched northward from Nestoria, Michigan up to the Keweenaw Peninsula and terminating at Houghton, Michigan, with two branches extending further to Calumet, Michigan and Lake Linden, Michigan.

The Lake Superior and Ishpeming Railroad, is a U.S. railroad offering service from Marquette, Michigan, to nearby locations in Michigan's Upper Peninsula. It began operations in 1896. The LS&I continues to operate as an independent railroad from its headquarters in Marquette.

History of railroads in Michigan

Railroads have been vital in the history of the population and trade of rough and finished goods in the state of Michigan. While some coastal settlements had previously existed, the population, commercial, and industrial growth of the state further bloomed with the establishment of the railroad.

The Flint and Pere Marquette Railroad (F&PM) is a defunct railroad which operated in the U.S. state of Michigan between 1857 and 1899. It was one of the three companies which merged to become the Pere Marquette Railway.

Ore dock Transportation construction

An ore dock is a large structure used for loading ore onto ships, which then carry the ore to steelworks or to transshipment points. Most known ore docks were constructed near iron mines on the upper Great Lakes and served the lower Great Lakes. Ore docks still in existence are typically about 60 feet (18 m) wide, 80 feet (24 m) high, and vary from 900 feet (270 m) to 2,400 feet (730 m) in length. They are commonly constructed from wood, steel, reinforced concrete, or combinations of these materials.

County Road 510 is a primary county road in Marquette County, Michigan, that connects Negaunee Township with the community of Big Bay. The road runs through rural forests as a paved and dirt road in northern Marquette County. It crosses the Dead River near the Hoist and McClure dams and runs for 26.103 miles (42.009 km) before terminating at an intersection with CR 550 south of Big Bay.

Ferries in Michigan

Due to its unique geography, being made of two peninsulas surrounded by the Great Lakes, Michigan has depended on many ferries for connections to transport people, vehicles and trade. The most famous modern ferries are those which carry people and goods across the Straits of Mackinac to the car-free Mackinac Island but before the Mackinac Bridge was built, large numbers of ferries carried people and cars between the two peninsulas. Other ferries continue to provide transportation to small islands and across the Detroit River to Canada. Ferries once provided transport to island parks for city dwellers. The state's only national park, Isle Royale cannot be reached by road and is normally accessed by ferry. The largest ferries in Michigan are the car ferries which cross Lake Michigan to Wisconsin. One of these, the SS Badger is one of the last remaining coal steamers on the Great Lakes and serves as a section of US Highway 10 (US 10). The Badger is also the largest ferry in Michigan, capable of carrying 600 passengers and 180 autos.

Huron Bay Bay on Lake Superior in Michigan

Huron Bay is a long, narrow fjord 12.3 miles (19.8 km) long, located in Baraga County, Michigan, on the northern shore of the Upper Peninsula of the State of Michigan. The bay, oriented in a northeast-southwest direction, is bounded by the Huron Mountains on its east and the Abbaye Peninsula on its west.

SS <i>Clifton</i> Whaleback Great Lakes freighter

SS Clifton, originally Samuel Mather, was a whaleback lake freighter built in 1892 for service on the Great Lakes. She was 308 foot (94 m) long, 30 foot (9.1 m) beam, and 24 foot (7.3 m) depth, and had a 3,500 ton capacity. The self-propelled barge was built by the American Steel Barge Company in West Superior, Wisconsin. Her builders used a design well-suited to carry iron ore, her intended trade. The new vessel was christened Samuel Mather, after a cofounder of Pickands Mather and Company, which at the time was the second largest fleet on the Great Lakes.

SS <i>Choctaw</i> Unique steamship wrecked in Lake Huron in 1915

SS Choctaw was a steel-hulled American freighter in service between 1892 and 1915, on the Great Lakes of North America. She was a so-called monitor vessel, containing elements of traditional lake freighters and the whaleback ships designed by Alexander McDougall. Choctaw was built in 1892 by the Cleveland Shipbuilding Company in Cleveland, Ohio, and was originally owned by the Lake Superior Iron Company. She was sold to the Cleveland-Cliffs Iron Company in 1894 and spent the rest of her working life with it. On her regular route between Detroit, Escanaba, Marquette, and Cleveland, she carried iron ore downbound, and coal upbound.

The Eureka Iron & Steel Works was an American iron and steel company in Wyandotte, Michigan. It started in 1853 with the discovery of unusually high-quality iron ore in the Upper Peninsula of Michigan. A group of businessmen in the Detroit area figured this could be a profitable enterprise to manufacture iron and steel, so they pooled together funds to form a new company. The company produced the first commercially available steel in America. One of the first uses for this steel was tracks for railroads. It was in business until 1892.

Lake Superior and Ishpeming Railroad No. 23 is a preserved SC-4 class 2-8-0 "consolidation" type steam locomotive originally built by the American Locomotive Company (ALCO) in January 1910 for the Lake Superior and Ishpeming Railroad as No. 9. It was renumbered 23 in 1923. It was used for pulling carloads of iron ore, as well as some passenger trains on branch lines, until 1962. In 1963, it was leased to the Marquette and Huron Mountain tourist railroad for use in excursion service between Marquette and Big Bay, until 1974. It was the locomotive that had the longest operating career on the M&HM. After the M&HM was shut down in 1984, No. 23 was sold off to the Empire State Railway Museum in Phoenicia, New York, where it remained as a display piece until 2002. That year, ESRM announced that they would restore the locomotive to operating condition, and they began the rebuilding process at the Catskill Mountain Railroad's Kingston yard site. As of 2022, No. 23 is still undergoing restoration.

Lake Superior and Ishpeming Railroad No. 33 is a preserved SC-1 class 2-8-0 "consolidation" type steam locomotive originally built by the Baldwin Locomotive Works in April 1916 for the Munising, Marquette and Southeastern Railway as No. 44. In 1924, the MM&SE was purchased by the Lake Superior and Ishpeming Railroad and the locomotive was renumbered to 33. It served the LS&I by pulling heavy iron ore trains until it was retired from revenue service in 1962. The following year, it was sold to the Marquette and Huron Mountain tourist railroad to operate in excursion service, but instead sat idle in Marquette. In 1965, No. 33 was purchased by the founders of the Hocking Valley Scenic Railway in Ohio. Rebuilt to operating condition, No. 33 ran on the HVSR for many years before being sidelined in 1996 for an FRA-required overhaul that couldn't be accomplished. In 2003, No. 33 was traded to the Ohio Central Railroad and was overhauled for some occasional excursion runs between 2005 and 2008. The locomotive briefly operated again around the Age of Steam Roundhouse between 2018 and 2020. As of 2022, No. 33 is sidelined, awaiting to go through a 1,472-day inspection.

References