2,800m (difficult sections)"},"maxincline":{"wt":""},"racksystem":{"wt":""},"routenumber":{"wt":""},"electrification":{"wt":"50 Hz 25,000 V"},"speed":{"wt":"{{convert|200|km/h|mph|0|abbr=on}}"},"elevation":{"wt":""},"website":{"wt":""},"map":{"wt":"{{Jiujiang–Quzhou railway}}"}},"i":0}}]}" id="mwBA">.mw-parser-output .infobox-subbox{padding:0;border:none;margin:-3px;width:auto;min-width:100%;font-size:100%;clear:none;float:none;background-color:transparent}.mw-parser-output .infobox-3cols-child{margin:auto}.mw-parser-output .infobox .navbar{font-size:100%}body.skin-minerva .mw-parser-output .infobox-header,body.skin-minerva .mw-parser-output .infobox-subheader,body.skin-minerva .mw-parser-output .infobox-above,body.skin-minerva .mw-parser-output .infobox-title,body.skin-minerva .mw-parser-output .infobox-image,body.skin-minerva .mw-parser-output .infobox-full-data,body.skin-minerva .mw-parser-output .infobox-below{text-align:center}
Jiujiang–Quzhou railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() A train crossing a bridge in Kaihua | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 10 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Heavy rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 28 December 2017 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 333 km (207 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum radius | 3,500m 2,800m (difficult sections) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 50 Hz 25,000 V | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 200 km/h (124 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Jiujiang–Quzhou railway is an electrified railway in China. The line is 333 kilometres (207 mi) long and has a design speed of 200 kilometres per hour (120 mph). [1] [2]
The railway opened on 28 December 2017. [3]
The line has the following passenger stations:
Hefei–Fuzhou high-speed railway, is a dual-track, electrified, passenger-dedicated, high-speed rail line between Hefei and Fuzhou, the provincial capitals of Anhui and Fujian, respectively. It has a total length of 813 km (505 mi) and runs through Anhui, Jiangxi and Fujian province. Construction began on April 27, 2010 and the line was opened on 28 June 2015. The total cost of the line was about ¥109.8 billion. On this line, trains can reach top speeds of 300 kilometres per hour, reducing the travel time by rail from Hefei to Fuzhou from fourteen to four hours. The railway is part of the future Beijing–Taipei high-speed rail corridor.
The Baoji–Lanzhou high-speed railway is a high-speed railway operated by China Railway High-speed between Baoji in western Shaanxi province and Lanzhou, the capital of Gansu province. The railway cut the rail travel between Baoji and Lanzhou from five hours to one hour and a half. It connects with the Xi'an–Baoji high-speed railway to the east and the Lanzhou–Urumqi high-speed railway to the west. The feasibility study report has been approved by the National Development and Reform Commission. The construction work was expected to start in the first half of 2011, but it actually started in October 2012. The line started operations on July 9, 2017.
The Nanjing–Xi'an railway or Ningxi railway, is a major trunkline railroad in China between Nanjing, the capital of Jiangsu Province and Xi'an, the capital of Shaanxi Province. The Chinese name for the line, Ningxi, is named after the two terminal cities, Ning, the Chinese character shorthand for the city of Nanjing, and Xi for Xian. The line is 1,196 km (743 mi) in length and comprises the Xi’an-Hefei section in the west, 1,196 km (743 mi) in length, that opened on January 7, 2004, and the high-speed Hefei–Nanjing section in the east, better known as the Hefei–Nanjing passenger railway, 166 km (103 mi) in length, that opened on April 18, 2008. In addition, a connection line 72 km (45 mi) in length was built in 2004 between the main line in Sui County and the Hankou–Danjiangkou railway in northern Hubei. The Ningxi railway passes through five provinces in central and eastern China. Major cities along route include Nanjing and Pukou in Jiangsu Province; Feidong, Hefei and Lu'an in Anhui Province; Huangchuan, Xinyang, Nanyang and Xixia County in Henan Province and Shangluo, Weinan and Xian in Shaanxi Province. The main line skirts Hubei Province near Sui County.
Nanchang Metro, officially Nanchang Rail Transit, is a rapid transit system in Nanchang, Jiangxi, China. As of 2021, four lines are operational. The Metro opened for commercial operation in December 2015. The network is currently 128.3 km (79.7 mi) in length in December 2021 with 4 lines. A total length of 163 km (101.3 mi) of network is planned, with Line 5 which is currently under planning.
The Wuhan–Jiujiang railway or Wujiu railway, is a double-track, electrified railroad in central China between Wuhan in Hubei Province and Jiujiang in Jiangxi Province. The line is 258 km (160 mi) long and follows the south bank of the Yangtze River from Wuchang District in Wuhan to Lushan Station in Jiujiang. Major cities and towns along route include Wuhan, Huarong, Huanggang, Ezhou, Huangshi, Daye Yangxin, Ruichang and Jiujiang.
Changsha–Kunming high-speed railway is a China Railway High-speed line connecting Changsha and Kunming, respectively the provincial capitals of Hunan and Yunnan. It is the western end of a larger rail project, the Shanghai–Kunming high-speed railway, which is one of the Ministry of Railways's strategic four east–west high-speed railways, and an integral part of the long-term railway network plan.
Hangzhou–Changsha high-speed railway is a China Railway High-speed line connecting Hangzhou, Nanchang, and Changsha, respectively the provincial capitals of Zhejiang, Jiangxi, and Hunan. This railway forms a section of the Shanghai–Kunming high-speed railway, part of the National Railway Grid Network, as one of the four major east-west lines.
The Shenyang–Dandong intercity railway, also known as the Shendan intercity railway or Shenyang–Dandong passenger railway, is a high-speed rail line within Liaoning province, connecting the cities of Shenyang and Dandong. The railway has been built to a design speed of 250 km/h (160 mph), consisting of double track electrified railway. The first public trains on the line started operating September 1, 2015.
Harbin–Jiamusi intercity railway is a high-speed railway with in Heilongjiang province of China, connecting the capital Harbin to Jiamusi. It has a total length of 343 km and it is being built as a 200 kilometres per hour, double tracked electrified express railway. With an expected journey time of two and a half hours from Harbin to Jiamusi. Total cost of the project is budgeted to be 34.714 billion yuan. The project started construction on June 30, 2014, and opened to traffic by September 30, 2018.
The Coastal corridor is a high-speed rail corridor running along the eastern coast of China, stretching from Dalian in the north to Fangchenggang in the south and passing through the cities of Shenyang, Qinhuangdao, Tianjin, Dongying, Weifang, Qingdao, Lianyungang, Yancheng, Nantong, Shanghai, Ningbo. Fuzhou, Xiamen, Shenzhen, and Zhanjiang. The Weifang–Qingdao stretch splits into two, one directly connecting Weifang to Qingdao, the other connecting Weifang to Qingdao through Yantai. Announced in 2016 as part of the national "eight vertical and eight horizontal" high-speed railway network as an expanded Hangzhou–Fuzhou–Shenzhen passenger railway from the "four vertical and four horizontal" plan. The line will comprise a mixture of high-speed railway lines, upgraded conventional rail lines and intercity railways.
The Hohhot–Nanning corridor is a proposed high-speed railway in China running from Hohhot in Inner Mongolia to Nanning in Guangxi. It will pass through the cities of Taiyuan, Zhengzhou, Xiangyang, Changde, Yiyang, Shaoyang, Yongzhou and Guilin. The corridor is one of the sixteen railway lines proposed under the "eight horizontal and eight vertical" railway network introduced in 2016.
The Shanghai–Wuhan–Chengdu high-speed railway is a high-speed rail line under construction in China. The Chinese name of the railway line, Huyurong, is a combination of the abbreviations for Shanghai, Chongqing, and Chengdu. It will run in an east-west direction largely parallel to the Yangtze River, connecting the cities of Shanghai, Nanjing, Hefei, Wuhan, Chongqing and Chengdu.
The Beijing–Kunming corridor is a high-speed rail corridor running from Beijing to Kunming in Yunnan Province. The main route passes from Beijing through Xiong'an, Xinzhou, Taiyuan, Xi'an and Chengdu before reaching Kunming. Apart from the main route, a branch line runs from Beijing to Taiyuan through Zhangjiakou and Datong, and a spur line from Chongqing connects to Kunming.
The Eurasia Continental Bridge corridor is a high-speed rail corridor connecting Lianyungang, a port in northern Jiangsu province, to Ürümqi, the regional capital of Xinjiang. The corridor passes through the cities of Xuzhou (Jiangsu), Zhengzhou (Henan), Xi'an (Shaanxi), Lanzhou (Gansu), and Xining (Qinghai) en route. Announced in 2016 as part of the "eight verticals and eight horizontals" railway network plan, the rail corridor is an extension of the existing Xuzhou–Lanzhou high-speed railway.
The Lianyungang–Xuzhou high-speed railway is a high-speed railway in China. The railway has a design speed of 350 kilometres per hour (220 mph).
The Nanchang–Jiujiang high-speed railway is a high-speed railway currently under construction in Jiangxi Province, China. The railway will have a design speed of 350 kilometres per hour (220 mph). It is part of the Beijing–Hong Kong (Taipei) corridor.
The Chongqing–Kunming high-speed railway is a high-speed railway line currently under construction in China. The line, which runs from Chongqing West to Kunming South, will be part of the Beijing–Kunming corridor. The line will be 699 kilometres (434 mi) long and have a maximum speed of 350 kilometres per hour (220 mph).
The Mile–Mengzi high-speed railway or Mimeng HSR is a high-speed railway line in Honghe, Yunnan, China. It is operated by China Railway Kunming Group. It is the first high-speed railway line which runs entirely in an autonomous prefecture in mainland China (PRC).