This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations .(February 2023) |
Kartalkaya Dam | |
---|---|
Location | Turkey |
Coordinates | 37°28′08″N37°14′22″E / 37.4688°N 37.2394°E |
Kartalkaya Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
The State Hydraulic Works is a state agency, under the Ministry of Environment and Forestry of Turkey, responsible for the utilization of all the country's water resources. The institution's four major functions are energy, agriculture, services and environment. The General Manager of DSI is Kaya Yıldız.
Çakmak Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
The Çat Dam is an embankment dam on the Abdülharap River, located near Çelikhan in Adıyaman Province, Turkey. Constructed between 1985 and 2002, the development was backed by the Turkish State Hydraulic Works. The purpose of the dam is irrigation and it provides water for up to 21,464 ha of land.
Çınarcık Dam is a rock-fill dam on the Orhaneli River about 30 km (19 mi) east of Mustafakemalpaşa in Bursa Province, Turkey. It serves several purposes to include power, irrigation, flood control and municipal water supply to the city of Bursa. The dam was constructed between 1996 and 2002. Construction of the Uluabat Hydroelectric Station, which the dam supplies water to, began in 2006 and it was commissioned in 2010. The 125 m (410 ft) tall dam diverts water north through an 11.27 km (7.00 mi) long tunnel where it reaches the power station on the southern bank of Lake Uluabat. Water discharged from the 100 MW power station then enters the lake. The dam and power station are owned by the Turkish State Hydraulic Works.
The Dilimli Dam is a rock-fill embankment dam on the Büyük River, located 9 km (6 mi) northeast of Yüksekova in Hakkari Province, Turkey. Construction on the project began in 1995 after the main contract was awarded in 1994. Development is backed by the Turkish State Hydraulic Works. It was completed in late November 2014. The mayor of Dilimli opposes the dam because of its effects on nature. The primary purpose of the dam is water supply and it will divert water into a 505 m (1,657 ft) long tunnel for the irrigation of 9,142 ha.
Doyduk Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Göksu Dam is a dam on Göksu Stream south of Diyarbakır city in Turkey. Constructed between 1987 and 1991, the development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is irrigation and it supplies water to 3,582 ha.
Kadıköy Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Karacasu Dam is a dam in Aydın Province, Turkey, completed in 2012. The development was backed by the Turkish State Hydraulic Works.
Kaymaz Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Kovalı Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Koyuntepe Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Manyas Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Mehmetli Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Medik Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Porsuk Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Tatlarin Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Uzunlu Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
Yoncalı Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.
The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) and the other downstream in Artvin Province.