Obruk Dam

Last updated • a couple of secsFrom Wikipedia, The Free Encyclopedia
Obruk Dam
Obruk Baraji.jpg
Turkey relief location map.jpg
Red pog.svg
Location of Obruk Dam in Turkey
Location Turkey
Coordinates 40°46′13″N34°47′17″E / 40.77028°N 34.78806°E / 40.77028; 34.78806
Construction began1996
Opening date2007
Dam and spillways
Impounds Kızılırmak River
Height67 m (220 ft)
Reservoir
Total capacity661,000,000 m3 (535,881 acre⋅ft)
Power Station
Commission date2009
Turbines 4 x 50.5 MW Francis-type [1]
Installed capacity 202 MW
Annual generation 473 GWh

Obruk Dam is an embankment dam on the Kızılırmak River in Çorum Province, Turkey. Constructed between 1996 and 2007, the development was backed by the Turkish State Hydraulic Works. The dam supports a 203 MW power station.

Contents

See also

Related Research Articles

<span class="mw-page-title-main">Batman Dam</span> Dam in Batman, Turkey in Batman Province

Batman Dam is one of the 22 dams of the Southeastern Anatolia Project of Turkey, built on the Batman River, north of Batman, in southeastern of Turkey. It was constructed between 1986 and 1999. There is a hydroelectric power plant, established in 1998, at the dam, with a power output of 191.7 MW. The dam is designed to service an irrigation area of 37,744 ha. The Silvan Dam is located upstream.

Gökçekaya Dam is 43 km (27 mi) north of Alpu town 45 km (28 mi) east of province of Eskişehir in central Turkey and located 60 km (37 mi) downstream of Sarıyar Dam on the Sakarya River which runs into the Black Sea. The Yenice Dam is located downstream.

<span class="mw-page-title-main">Kılıçkaya Dam</span> Dam in Kelkit River, Sivas Province

Kılıçkaya Dam is a dam located 25 km north of town of Suşehri 158 km northeast of Sivas city in center east of Turkey and located on the Kelkit, a tributary of the Yeşilırmak River which flows down along a large fault in the north east Anatolia than runs into the Black Sea.

Alpaslan-1 Dam is a dam and hydroelectric power station in Muş Province, Turkey. The foundation stone for the dam was laid in 1994 and construction on the dam superstructure began in 1998. The dam began to impound its reservoir in 2008 and the first of four 40 MW generators was operational in 2009. The second was commissioned in 2012.

<span class="mw-page-title-main">Çınarcık Dam</span> Dam in Mustafakemalpaşa, Bursa Province

Çınarcık Dam is a rock-fill dam on the Orhaneli River about 30 km (19 mi) east of Mustafakemalpaşa in Bursa Province, Turkey. It serves several purposes to include power, irrigation, flood control and municipal water supply to the city of Bursa. The dam was constructed between 1996 and 2002. Construction of the Uluabat Hydroelectric Station, which the dam supplies water to, began in 2006 and it was commissioned in 2010. The 125 m (410 ft) tall dam diverts water north through an 11.27 km (7.00 mi) long tunnel where it reaches the power station on the southern bank of Lake Uluabat. Water discharged from the 100 MW power station then enters the lake. The dam and power station are owned by the Turkish State Hydraulic Works.

Demirköprü Dam is an embankment dam on the Gediz River in Manisa Province, Turkey. Constructed between 1954 and 1960, the development was backed by the Turkish State Hydraulic Works. The dams supports a 69 MW power station and provides water for the irrigation of 99,220 hectares.

<span class="mw-page-title-main">Ermenek Dam</span> Dam in Turkey

The Ermenek Dam is a double-curvature concrete arch dam located on the Göksu River in Karaman Province, Turkey. The 210 m (689 ft) tall dam was the highest in Turkey at the time of its construction and currently ranks third after Deriner Dam and Yusufeli Dam. The development was backed by the Turkish State Hydraulic Works. Completed in 2009, the primary purpose of the dam is to support its 300 MW power station.

<span class="mw-page-title-main">Gönen Dam</span> Dam in Turkey

Gönen Dam is a dam in Turkey. The development was backed by the Turkish State Hydraulic Works.

Gürsöğüt Dam is a rock-fill embankment dam on the Sakarya River in Ankara Province, Turkey. The development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is hydroelectric power generation and it supports a 242 MW power station.

The Kargı Dam is a rock-fill embankment dam on the Sakarya River in Eskişehir Province, Turkey. The development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is hydroelectric power generation and it supports a 194 MW power station.

<span class="mw-page-title-main">Kığı Dam</span> Dam in Bingöl

Kığı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an 8.5 km (5.3 mi) long tunnel. In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site. In January 2016, the dam was completed and the reservoir began to impound water.

<span class="mw-page-title-main">Kılavuzlu Dam</span> Dam in Turkey

The Kılavuzlu Dam is an embankment dam on the Ceyhan River in Kahramanmaraş Province, Turkey. Constructed between 1996 and 2001, the development was backed by the Turkish State Hydraulic Works. The dam supports a 54 MW power station and supplies water for the irrigation of 178,000 hectares.

The Kürtün Dam is a concrete-face rock-fill dam on the Harşit River located 5 kilometres (3 mi) east of Kürtün in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction began in 1986 and the reservoir started to fill in 2002. The dam was completed in 2003 and its underground power station became operational in 2004. The dam is connected with 5.6 km long (3.5 mi) road tunnel, constructed to link the dam site to Kürtün. The hydroelectric power station, located below and just downstream of the right abutment of the dam, has an installed capacity of 80 MW.

The Kuzgun Dam is an embankment dam on the Serçeme River in Erzurum Province, Turkey. Constructed between 1985 and 1996, the development was backed by the Turkish State Hydraulic Works. The dam has a 23 MW power station and provides water for the irrigation of 22,276 hectares

Özlüce Dam is a rock-fill embankment dam on the Peri River, located 10 km (6 mi) south of Yayladere in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the third dam in the Peri River cascade. Constructed between 1992 and 2000, the development was backed by the Turkish State Hydraulic Works.

<span class="mw-page-title-main">Tortum Dam</span> Dam in Turkey

Tortum Dam is a dam on the Tortum River in Erzurum Province, Turkey. The development, backed by the Turkish State Hydraulic Works, was built on a natural landslide near Tortum Waterfall and raises the level of the existing lake for hydroelectric power production.

The Uzunçayır Dam is an embankment dam on the Munzur River, located 14 km (9 mi) south of Tunceli in Tunceli Province, Turkey. Constructed between 1994 and 2009, the development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is hydroelectric power generation and it supports an 84 MW power station.

Yenice Dam is a dam on the Sakarya River near Yenice on the border of Eskişehir and Ankara Province, Turkey. It houses a 38 MW hydroelectric power station. It was constructed between 1985 and 2000. The development was backed by the Turkish State Hydraulic Works.

The Artvin Dam an arch-gravity dam on the Çoruh River in Artvin Province, Turkey. Preliminary construction on the dam began in December 2010 and the river diversion tunnels were complete in July 2012 at which time construction on the dam foundation started. The purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 340 MW when completed. The dam is part of the Çoruh Development Plan and its construction was supervised by Turkey's State Hydraulic Works. The dam began to impound its reservoir in October 2015 and the power station was commissioned beginning in January 2016.

<span class="mw-page-title-main">Arkun Dam</span> Dam in İspir, Erzurum Province

The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) and the other downstream in Artvin Province.

References

  1. "Hydroelectric Power Plants in Northern Turkey". IndustCards. Archived from the original on 3 January 2013. Retrieved 25 November 2011.