Devecikonağı Dam | |
---|---|
Official name | Devecikonağı Baraji ve HES |
Country | Turkey |
Location | Devecikonağı, Mustafakemalpaşa, Bursa Province |
Coordinates | 39°52′31.86″N28°34′27.90″E / 39.8755167°N 28.5744167°E |
Purpose | Power |
Status | Operational |
Construction began | 2010 |
Opening date | 2012 |
Dam and spillways | |
Type of dam | Gravity, roller-compacted concrete |
Impounds | Emet Stream |
Height | 40 m (130 ft) |
Length | 298 m (978 ft) |
Spillway type | Overflow, five tainter gates |
Spillway capacity | 2,545 m3/s (89,900 cu ft/s) |
Reservoir | |
Total capacity | 6,200,000 m3 (5,000 acre⋅ft) |
Active capacity | 1,900,000 m3 (1,500 acre⋅ft) |
Surface area | 660 m2 (0.16 acres) |
Commission date | 2012 |
Turbines | 3 x Kaplan-type |
Installed capacity | 29 MW |
The Devecikonağı Dam is a gravity dam on Emet Stream about 5 km (3.1 mi) south of Devecikonağı in Bursa Province, Turkey. The primary purpose of the dam is to generate hydroelectric power and it has a 29 MW power station. Construction on the 40 m (130 ft) tall dam began in September 2010 and its power station was operational in 2012. To regulate water flow into the dam's reservoir and produce power more consistently, Kizkayasi Dam is planned upstream. [1]
The Ilısu Dam is a concrete-face rock-fill dam on the Tigris near the village of Ilısu and along the border of Mardin and Şırnak Provinces in Turkey. It is one of the 22 dams of the Southeastern Anatolia Project and its purpose is hydroelectric power production, flood control and water storage. When operational, the dam will support a 1,200 MW power station and will form a 10.4 billion m3 reservoir. Construction of the dam began in 2006 and was originally expected to be completed by 2016. As part of the project, the much smaller Cizre Dam is to be constructed downstream for irrigation and power. The dam has drawn international controversy, because it will flood portions of ancient Hasankeyf and necessitate the relocation of people living in the region. Because of this, the dam lost international funding in 2008. Most historical structures in Hasankeyf were moved to the new Hasankeyf prior to the filling of the dam. The dam began to fill its reservoir in late July 2019. Due to rainfall, the dam has achieved water levels up to 100m above the river bed and stored 5 billion cubic meters of water. The water level had reached an elevation of 498.2m on 1 April 2020.
Alpaslan-1 Dam is a dam and hydroelectric power station in Muş Province, Turkey. The foundation stone for the dam was laid in 1994 and construction on the dam superstructure began in 1998. The dam began to impound its reservoir in 2008 and the first of four 40 MW generators was operational in 2009. The second was commissioned in 2012.
Atasu Dam is a concrete-face rock-fill dam on the Gaylan River, 16 km (10 mi) south of Trabzon in Trabzon Province, Turkey. It was built between 1998 and 2010 for the primary purpose of drinking water supply but also has a 5 MW hydroelectric power station.
Çınarcık Dam is a rock-fill dam on the Orhaneli River about 30 km (19 mi) east of Mustafakemalpaşa in Bursa Province, Turkey. It serves several purposes to include power, irrigation, flood control and municipal water supply to the city of Bursa. The dam was constructed between 1996 and 2002. Construction of the Uluabat Hydroelectric Station, which the dam supplies water to, began in 2006 and it was commissioned in 2010. The 125 m (410 ft) tall dam diverts water north through an 11.27 km (7.00 mi) long tunnel where it reaches the power station on the southern bank of Lake Uluabat. Water discharged from the 100 MW power station then enters the lake. The dam and power station are owned by the Turkish State Hydraulic Works.
Deriner Dam is a concrete double-curved arch dam on the Çoruh River 5 km (3.1 mi) east of Artvin in Artvin Province, Turkey. The main purpose of the dam is hydroelectric power production and additionally flood control. Construction on the dam began in 1998, the reservoir began to fill in February 2012 and the power station was completed by February 2013. It will have a 670 MW power house and is the tallest dam in Turkey. The dam is being implemented by Turkey's State Hydraulic Works and constructed by a consortium of Turkish, Russian and Swiss companies.
Gürsöğüt Dam is a rock-fill embankment dam on the Sakarya River in Ankara Province, Turkey. The development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is hydroelectric power generation and it supports a 242 MW power station.
The Kargı Dam is a rock-fill embankment dam on the Sakarya River in Eskişehir Province, Turkey. The development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is hydroelectric power generation and it supports a 194 MW power station.
Kığı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an 8.5 km (5.3 mi) long tunnel. In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site. In January 2016, the dam was completed and the reservoir began to impound water.
The Kılavuzlu Dam is an embankment dam on the Ceyhan River in Kahramanmaraş Province, Turkey. Constructed between 1996 and 2001, the development was backed by the Turkish State Hydraulic Works. The dam supports a 54 MW power station and supplies water for the irrigation of 178,000 hectares.
The Kürtün Dam is a concrete-face rock-fill dam on the Harşit River located 5 kilometres (3 mi) east of Kürtün in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction began in 1986 and the reservoir started to fill in 2002. The dam was completed in 2003 and its underground power station became operational in 2004. The dam is connected with 5.6 km long (3.5 mi) road tunnel, constructed to link the dam site to Kürtün. The hydroelectric power station, located below and just downstream of the right abutment of the dam, has an installed capacity of 80 MW.
The Kuzgun Dam is an embankment dam on the Serçeme River in Erzurum Province, Turkey. Constructed between 1985 and 1996, the development was backed by the Turkish State Hydraulic Works. The dam has a 23 MW power station and provides water for the irrigation of 22,276 hectares
The Uzunçayır Dam is an embankment dam on the Munzur River, located 14 km (9 mi) south of Tunceli in Tunceli Province, Turkey. Constructed between 1994 and 2009, the development was backed by the Turkish State Hydraulic Works. The primary purpose of the dam is hydroelectric power generation and it supports an 84 MW power station.
The Boyabat Dam is a concrete gravity dam on the Kızılırmak River bordering Sinop and Samsun Provinces, Turkey. It is 8 km (5 mi) southwest of Durağan and 24 km (15 mi) southeast of Boyabat. Construction began in 2008 and the dam and power plant were completed in December 2012. Its primary purpose is to generate hydroelectric power. The dam's power plant has an installed capacity of 513 MW.
Alaköprü Dam is a concrete-face rock-fill dam on the Anamur (Dragon) Creek in Anamur district of Mersin Province, southern Turkey. The development is backed by the Turkish State Hydraulic Works (DSİ). The dam was primarily built as part of the Northern Cyprus Water Supply Project, to supply water for drinking and irrigation to Northern Cyprus.
The Artvin Dam an arch-gravity dam on the Çoruh River in Artvin Province, Turkey. Preliminary construction on the dam began in December 2010 and the river diversion tunnels were complete in July 2012 at which time construction on the dam foundation started. The purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 340 MW when completed. The dam is part of the Çoruh Development Plan and its construction was supervised by Turkey's State Hydraulic Works. The dam began to impound its reservoir in October 2015 and the power station was commissioned beginning in January 2016.
The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) and the other downstream in Artvin Province.
The Laleli Dam is an embankment dam, currently under construction near the town of Laleli on the Çoruh River in Erzurum Province, Turkey. The primary purpose of the dam is hydroelectric power production. The dam, which will power a 99 MW power station, will also flood several villages to include Laleli. The dam's reservoir will stretch east into Bayburt Province.
The Yedigöze Dam, also known as Sani Bey Dam, is a concrete-face rock-fill dam on the Seyhan River bordering İmamoğlu and Aladağ districts in Adana Province, Turkey. The primary purpose of the dam is hydroelectric power generation and irrigation. The dam's power station has an installed capacity of 320 MW and the reservoir will help irrigate 75,000 ha. Construction began in 2007 and the river was diverted by 2008. In the same year construction on the actual dam began and the reservoir began to fill on 15 June 2010. By November 2010 the remaining construction work was complete and the generators were commissioned in 2011. Construction on the irrigation works is ongoing.
The Tatar Dam is an earth-fill dam on the Peri River, near the village of Tatarköy in Kovancılar district of Elazığ Province, Turkey. Its primary purpose is hydroelectric power generation and is the sixth and last dam in the Peri River cascade, before Lake Keban. Construction on the dam began in 2008 and it began impounding its reservoir in early 2013. The power station was commissioned in late 2015. Its two generators were commissioned in February/March 2015. The 82 m (269 ft) tall dam withholds a reservoir of 299,570,000 m3 (242,870 acre⋅ft). It is owned and operated by Limak Energy and Bilgin Energy.
The Burç Bendi Dam is a gravity dam on the Göksu River, near the village of Burç in Adıyaman district, Adıyaman Province, Turkey. Its primary purpose is hydroelectric power generation and it supports a 27.9 MW run-of-the-river power station. Construction on the dam began in January 2008 and it was fully operational by 3 November 2010. The 57 m (187 ft) tall concrete dam withholds a reservoir of 26,600,000 m3 (21,600 acre⋅ft). Water is diverted through a 536 m (1,759 ft) long tunnel to the power station downstream which contains three 9.3 vertical Kaplan turbine-generators. It is owned and operated by ČEZ Group.