Country Kenya
Location Embu County/Kitui County
Coordinates 00°48′38″S37°48′46″E / 0.81056°S 37.81278°E / -0.81056; 37.81278 Coordinates: 00°48′38″S37°48′46″E / 0.81056°S 37.81278°E / -0.81056; 37.81278
PurposePower
StatusOperational
Opening date1968;54 years ago (1968)
Owner(s) Kenya Electricity Generating Company
Dam and spillways
Type of dam Embankment
Impounds Tana River
Height24 m (79 ft)
Length549 m (1,801 ft)
Reservoir
CreatesKindaruma Lake
Total capacity18,300,000 m3 (14,800 acre⋅ft)
Surface area10 km2 (3.9 sq mi) [1]
Kindaruma Hydroelectric Power Station
Coordinates 00°48′38″S37°48′46″E / 0.81056°S 37.81278°E / -0.81056; 37.81278
Operator(s) Kenya Electricity Generating Company
Commission date1968/2012
Turbines 3 x 24 MW, 2 (Units 1 & 2) Kaplan-type & 1 (Unit 3) Fixed Blade Propeller Type
Installed capacity 72 MW (97,000 hp)

The Kindaruma Hydroelectric Power Station, also Kindaruma Dam is an embankment dam with two gravity dam sections on the Tana River in Kenya. It straddles the border of Embu and Machakos counties in Kenya. The primary purpose of the dam is hydroelectric power generation and it supports a 72 megawatts (97,000 hp) power station. It is Kenya's first post-independence hydroelectric power plant. It was commissioned in 1968 as part of the Seven Forks Scheme. The power station is operated by Kenya Electricity Generating Company. [2]

Between 2007 and 2013 the power stationed underwent a rehabilitation and upgrade which increased its installed capacity from 40 MW to 72 MW. [3] In June 2012 a third Kaplan turbine-generator, rated at 24 MW, was commissioned. In January and June 2013, the original two 20 MW Kaplan turbine-generators were upgraded to 24 MW each, respectively. [4]

See also

Related Research Articles

Kajaki Dam Dam in Kajaki District, Helmand Province

The Kajaki Dam is one of the two major hydroelectric power dams of Helmand province in southern Afghanistan. The dam is located on the Helmand River 100 miles (161 km) north-west of Kandahar and is operated by the Helmand and Arghandab Valley Authority. It has a dual function, to provide electricity and to irrigate some 650,000 acres (1800 km2) of an otherwise arid land. Water discharging from the dam traverses some 300 miles (500 km) of downstream irrigation canals feeding farmland. As of October 2016 it produces 52.5 megawatts of electricity.

The Xiluodu Dam is an arch dam on the Jinsha River, i.e. the upper course of the Yangtze in China. It is located near the town of Xiluodu in Yongshan County of Yunnan Province but the dam straddles into Leibo County of Sichuan Province on the opposite side of the river. The primary purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 13,860 MW. Additionally, the dam provides for flood control, silt control and its regulated water releases are intended to improve navigation downstream. Construction on the dam and power station began in 2005 and the first generator was commissioned in 2013, the last in 2014. It is operated by China Yangtze Power and is currently the third-largest power station with the fourth-tallest dam in the world.

Kenya Electricity Generating Company State-owned electric power production company

Kenya Electricity Generating Company PLC or simply KenGen is a parastatal, and is the largest electric power producer in Kenya generating over 65% of the electricity consumed in the country.

The Gitaru Hydroelectric Power Station, also known as the Gitaru Dam, is a rock and earth-filled embankment dam on the Tana River in Kenya. It straddles the border between Embu and Machakos Counties in the former Eastern Province. The primary purpose of the dam is hydroelectric power generation, and it supports a 225 megawatt power station.

The Kamburu Hydroelectric Power Station, also Kamburu Dam is a rock-filled embankment dam on the Tana River in Kenya. It straddles the border of Embu and Machakos Counties in Eastern Province. The primary purpose of the dam is hydroelectric power generation and it supports a 93 MW power station. Construction on the dam began in 1971 and it was completed in 1975. The power station was commissioned the same year. US$23 million of the US$47 million project cost was provided by the World Bank. The power station is operated by Kenya Electricity Generating Company and is part of the Seven Forks Scheme.

The Kiambere Hydroelectric Power Station is an earth-filled embankment dam on the Tana River near Kiambere, Kenya. It straddles the border of Embu and Kitui Counties in Eastern Province. The primary purpose of the dam is hydroelectric power generation and it supports a 165 MW power station. Construction on the dam began in 1983 and it was completed in 1987. The power station was commissioned in 1988. Beginning in 2008 both turbine-generators were upgraded from 72 MW to 82.5 MW. They were commissioned in 2009. US$95 million in funding for the original project was provided by the World Bank. The power station is operated by Kenya Electricity Generating Company and is part of the Seven Forks Scheme.

The Turkwel Hydroelectric Power Station, also Turkwel Dam, is an arch dam on the Turkwel River about 76 km (47 mi) north of Kapenguria in West Pokot County, Kenya. The dam serves several purposes to include hydroelectric power production, irrigation tourism and fisheries. It was constructed between 1986 and 1991. It supports the third largest hydroelectric power plant in the country, having an installed electric capacity of 106 megawatts (142,000 hp).

Cambambe Hydroelectric Power Station Power station in Angola

The Cambambe Hydroelectric Power Station is a hydroelectric power plant across the Kwanza River at the border between Cuanza Norte Province and Bengo Province in Angola. Following rehabilitation and expansion, the generation capacity of this installation is 960 megawatts (1,290,000 hp).

The Manuel Piar Hydroelectric Power Plant is a stalled hydroelectric development project in the Lower Caroní River Basin of Venezuela. The project, started in 2006, includes the installation of 2,320 megawatts (3,110,000 hp) MW to generate annual average energy of 12,100 gigawatt-hours (44,000 TJ). As of 2019, the project is unfinished.

Okutadami Dam Dam in Uonuma

The Okutadami Dam (奥只見ダム) is a concrete gravity dam on the Tadami River, 26 km (16 mi) east of Uonuma on the border of Niigata and Fukushima Prefectures, Japan. The primary purpose of the dam is hydroelectric power generation and it supports a 560 MW power station which is the largest conventional hydroelectric power station in Japan. The dam also forms the second largest reservoir in Japan, next to that of the Tokuyama Dam.

Otori Dam Dam in Tadami

The Otori Dam is a concrete arch-gravity dam on the Tadami River, 17 km (11 mi) southwest of Tadami in Fukushima Prefecture, Japan. The primary purpose of the dam is hydroelectric power generation and it supports a 182 MW power station. The power station contains two Kaplan turbine-generators. Unit 1 was commissioned on 20 November 1963 while Unit 2 was commissioned on 7 June 2003 as part of a power plant expansion project that included an additional 200 MW generator at Okutadami Dam upstream. The dam is 83 m (272 ft) tall and 188 m (617 ft) long. Its reservoir has a 15,800,000 m3 (12,809 acre⋅ft) capacity of which 5,000,000 m3 (4,054 acre⋅ft) is active for power generation. The reservoir has a catchment area of 656.9 km2 (254 sq mi) and surface area of 89 ha. Of the two generators, Unit 1 has a maximum effective hydraulic head of 50.8 m (167 ft) and Unit 2 is afforded 48.1 m (158 ft). The design flood discharge of the dam is 2,200 m3/s (77,692 cu ft/s) and its service spillway is controlled by three tainter gates.

Koldam Dam Dam in Bilaspur district

The Koldam Hydropower Station commonly known as Koldam, is an embankment dam on the Satluj River upstream of the Dehar Power House. It is 18 km from Bilaspur off the Chandigarh-Manali Highway (NH-21) near Barmana, Himachal Pradesh, India. The main purpose of the dam is hydroelectric power generation and it will support an 800 MW power station. The dam was constructed by NTPC Limited.

Naghlu Dam Dam in Surobi District, Kabul Province

The Naghlu Dam is a gravity dam on the Kabul River in Surobi District of Kabul Province in Afghanistan. It is located 40 km (25 mi) east of the nation's capital Kabul. The primary purpose of the dam is hydroelectricity production. The dam supports a power station with a design capacity of 100 MW of electricity. It is connected to the national grid of Afghanistan, and is currently the largest power plant in the country. It provides electricity to about 100,000 households in the Kabul region.

The Çetin Dam hydropower dam, currently being constructed on the Botan River in Siirt Province, Turkey, with an installed capacity of 420 MW. It was completed in 2020.

Chardara Dam Dam in Shardara District

The Chardara Dam, also known as Chardarin Dam, is an earth-fill embankment dam on the Syr Darya River in Shardara District, Kazakhstan. It was constructed between 1964 and 1968 with the primary purpose of irrigation. The dam has an associated 100 MW hydroelectric plant named Shardarinsk Hydroelectric Power Station. The dam provides water to the Kyzyl-Kum channel for crop irrigation. The reservoir created by the dam has a maximum storage capacity of 5,700,000,000 m3 (4,600,000 acre⋅ft) and a surface area of 900 km2 (350 sq mi). The dam has been undergoing structural rehabilitation and a power station upgrade is currently in planning. The power station's four 25 MW Kaplan turbine-generators are scheduled to be upgraded to 31.5 MW each.

The Duber Khwar Hydropower Plant is located near the town of Pattan in Kohistan, Khyber Pakhtunkhwa, Pakistan on the Duber Khwar River, a right bank tributary of the Indus River. It is approximately 340 km NW from Islamabad, the federal capital of Pakistan.

The Golovnaya Dam is an earth-fill embankment dam on the Vakhsh River just east of Sarband in Khatlon Province, Tajikistan. It serves to provide water to a system of irrigation canals and generate hydroelectric power. The first generator was commissioned in 1962 and the last in 1963. Between 1984 and 1989 three of the Kaplan turbines were upgraded from 35 MW to 45 MW. Two of the turbines in the 240 MW power station discharge water into a canal on the left bank of the river. Water from this canal serves to irrigate but also supplies the 29.9 MW Perepadnaya and 15.1 MW Centralnaya Hydroelectric Power Plants located further down. The reservoir has a design storage volume of 96,000,000 m3 (78,000 acre⋅ft) by an estimated 80 percent of this is now silt.

Snoqualmie Falls Hydroelectric Plant

The Snoqualmie Falls Hydroelectric Plant is located just north of Snoqualmie in King County, Washington state, US. It is situated about 22 mi (35 km) east of Seattle. Located just below the Snoqualmie Falls, the power plant consists of two power houses, Plant 1 and Plant 2. Plant 1 was completed in 1899 and is located underground. It is the first completely underground hydroelectric power plant ever built in the world. Plant 2 was built in 1910 and is located along the right bank of the Snoqualmie River. Both plants receive water from a small reservoir created by a weir atop the falls. Plant 1 has an installed capacity of 13.7 MW and Plant 2 a capacity of 40.2 MW for a total installed capacity of 53.9 MW, enough to power 40,000 homes.

Masinga Hydroelectric Power Station, also Masinga Dam, is an embankment dam on the Tana River, the longest river in Kenya. It straddles the border of Embu and Machakos Counties in Eastern Province and is located about 106 km. (66 mi.), by road, northeast of Nairobi, Kenya's capital and largest city.

Laúca Hydroelectric Power Station Power station in Angola

The Lauca Hydroelectric Power Station is a 2,070 MW (2,775,916 hp) hydroelectric power plant, under construction in Angola. When completed, as expected in 2020, it will be the largest power station in the country.

References

  1. Marie Giasson, Jean-Louis Gaudet (1989). Summary of Proceedings and Selected Papers (Issue 425 of FAO Fisheries Report Series ed.). Food & Agriculture Org. p. 39. ISBN   9251028710.
  2. "Kindaruma Power Station". Kengen. Archived from the original on 12 May 2016. Retrieved 22 February 2015.
  3. "Kindaruma Hydropower Station Taking-Over Ceremony for Rehabilitated and Uprated Unit No. 1". norplanhp.com/. Archived from the original on 4 January 2015. Retrieved 4 January 2015.
  4. Wahito, Margaret (24 June 2013). "Kindaruma upgrade enhances power supply". Capital Digital Media. Retrieved 22 February 2015.