Kinyara Thermal Power Station

Last updated
Kinyara Power Station
Kinyara Thermal Power Station
Country Uganda
LocationKinyara, Masindi, Masindi District
Coordinates 01°38′12″N31°36′24″E / 1.63667°N 31.60667°E / 1.63667; 31.60667 Coordinates: 01°38′12″N31°36′24″E / 1.63667°N 31.60667°E / 1.63667; 31.60667
StatusOperational
Commission date 2009
Owner(s) Kinyara Sugar Works
Thermal power station
Primary fuel Bagasse
Power generation
Units operational40.8 MW (3 x 13.6 MW)
Nameplate capacity 40.8 MW

Kinyara Power Station is a 40.8 MW bagasse-fired thermal power plant in Uganda, the third-largest economy in the East African Community.

Contents

Location

The power station is located in the town of Kinyara in Masindi District in the Western Region of Uganda, on the campus of Kinyara Sugar Limited, which owns the station. Kinyara is approximately 15 kilometres (9.3 mi), by road, west of Masindi, the nearest large town. This location is approximately 230 kilometres (140 mi), by road, northwest of Kampala, the capital of Uganda and the largest city in that country. The coordinates of the station are:1°38'12.0"N, 31°36'24.0"E (Latitude:1.636667; Longitude:31.606667). [1]

Overview

Kinyara Power Station is owned and operated by Kinyara Sugar Limited, the second-largest sugar manufacturer in Uganda. The power station was designed and built around the sugar manufacturing plant of Kinyara Sugar Ltd. The fibrous residue from the process of crushing sugar cane, known as bagasse, is burnt to heat water in boilers and produce steam. The steam is pressurized and used to drive turbines which then generate electricity. The excess heat is used in the sugar manufacturing process. As of September 2009, the power station was capable of producing a maximum of 14.5MW of electricity. [2] As of October 2009, the power station sold 4MW to the national grid. [3] Plans are underway to expand power production to 40MW by 2015. Of this, 22MW was expected to be sold to the national grid and the rest used by the sugar manufacturing complex at Kinyara. [4] [5]

See also

Related Research Articles

Masindi Place in Western Region of Uganda, Uganda

Masindi is a town in the Western Region of Uganda. It is on the road between Kampala and the Murchison Falls National Park. It is the site of the headquarters of the Masindi District.

Energy in Uganda

Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.

Tororo Thermal Power Station is a 89 MW (119,000 hp) heavy fuel oil-fired thermal power plant located in the town of Tororo in Tororo District in the Eastern Region of Uganda.

Kakira Power Station is a 52 megawatt bagasse-fired thermal power plant in the town of Kakira in Jinja District in the Eastern Region of Uganda.

The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.

Kinyara Sugar Limited (KSL) formally Kinyara Sugar Works Limited (KSWL), is a sugar manufacturer in Uganda.

Waki Power Station is a proposed 5 megawatts (6,700 hp) mini hydroelectric power station in Uganda, the third-largest economy in the East African Community.

Lugazi Power Station is a 9.5 megawatts (12,700 hp) bagasse-fired thermal power plant in Uganda, the third-largest economy in the East African Community.

Nzizi Power Station is a planned 100 MW (130,000 hp) natural gas-fired thermal power plant in Uganda.

Nengo Bridge Hydroelectric Power Station, often referred to as Nengo Bridge Power Station is a planned 6.7 megawatts (9,000 hp) mini-hydroelectric power station in Uganda, the third-largest economy in the East African Community.

Sugar & Allied Industries Limited (SAIL), also referred to as Kaliro Sugar Limited is a sugar manufacturer in Uganda.

Kaliro Power Station is a 12 MW (16,000 hp) bagasse-fired thermal power plant in Uganda, the third-largest economy in the East African Community.

Mayuge Sugar Industries Limited (MSIL) is a sugar manufacturer in Uganda, the third-largest economy in the East African Community.

Tororo Solar Power Station, also Tororo Solar North Power Station, is a 10 megawatts (13,000 hp) solar power plant in Uganda, the third-largest economy in the East African Community.

The Soroti Power Station is a 10 MW (13,000 hp) solar power plant in Uganda. It was the largest grid-connected, "privately-funded solar power plant in Sub-Saharan Africa, outside of South Africa" at its commissioning and until the Pilot Solar Power Plant (20MW) of The Xsabo Group in Kabulasoke in Central Uganda was completed and commissioned in January 2019.

Mayuge Thermal Power Station is a 1.6 megawatt bagasse-fired thermal power plant in Uganda, the third-largest economy in the East African Community.

Namugoga Solar Power Station is a 50 megawatt solar power plant, under development in Uganda.

Achwa 2 Hydroelectric Power Station is a 41 megawatts (55,000 hp) hydroelectric power plant, in Uganda.

The Hoima–Kinyara–Kafu High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Kabaale, Buseruka sub-county, Hoima District, in the Western Region of Uganda to another high voltage substation at Kafu, Nakasongola District, in the Central Region of Uganda. On the way, the power line passes through Kinyara Sugar Works, in Masindi District.

References

  1. "Location of Kinyara Power Station At Google Maps". Google Maps . Retrieved 14 July 2014.
  2. Birungi, Machrine (11 September 2011). "Sugar Company Distribute Its Power To National Grid". Uganda Radio Network. Retrieved 14 July 2014.
  3. Akweteireho, Jonathan (20 October 2009). "Maintenance Work At Kinyara Sugar Factory Disrupts Power Supplies". Uganda Radio Network. Retrieved 14 July 2014.
  4. Walubiri, Moses (17 July 2013). "MPs Considering ShS140 Billion Energy Sector Loans". New Vision . Kampala. Retrieved 12 January 2015.
  5. Barigaba, Julius (2 February 2013). "Oil-Rich Albertine Region To Become Uganda's Energy Hub". The EastAfrican . Nairobi. Retrieved 16 May 2015.