Kirkuk–Haifa oil pipeline

Last updated

Kirkuk–Haifa oil pipeline
Mosul-Haifa oil pipeline.svg
Map of Kirkuk–Haifa oil pipeline
General information
Type Crude oil
Operator Iraq Petroleum Company
Construction started1932
Commissioned1934
Decommissioned1948 (to Haifa)
Technical information
Length1,856 km (1,153 mi)
Diameter12 in (305 mm)
No. of pumping stations12

The Kirkuk-Mediterranean pipeline was a mixed 10/12-inch twin crude oil pipeline from the oil fields in Kirkuk, located in the former Ottoman vilayet of Mosul in northern Iraq, through Transjordan to Haifa in mandatory Palestine (now in the territory of Israel); and through Syria and a short stretch of what was to become the state of Lebanon to Tripoli. [1] [2] The oil arriving on the coast was shipped to European refineries until in 1939 the refinery in Haifa was completed, soon capable of processing the entire supply. For a few years before 1948 crude oil was transported from Tripoli to Haifa by tankers.

Contents

The pipeline was built by the Iraq Petroleum Company between 1932 and 1934 (and the first pipeline built by the company), [2] [3] The double pipeline split at Haditha (Pumping Station K-3) at the Euphrates river crossing.

The pipeline and the Haifa refineries were considered strategically important by the British Government, and indeed provided much of the fuel needs of the British and American forces in the Mediterranean during World War II. After the Fall of France for about one year of conflict in the Middle East, different parts of the pipeline system were in the hands of opposing forces, after the war with Israel now in possession of the southern terminal, the whole southern branch was cut off from Iraqi oil deliveries and eventually abandoned. During the Suez crisis, the northern branch was sabotaged and remained shut down for 5 months.

The pipeline was a target of attacks by Arabs during the 1936–1939 Arab revolt in Palestine, and as a result one of the main objectives of a joint British-Jewish Special Night Squads commanded by Captain Orde Wingate was to protect the pipeline against such attacks. Later on, the pipeline was the target of attacks by the Jewish Irgun paramilitary organisation. [4]

Oil production in Iraq [5] [6]
1930909,000
1931900,000
1932836,000
1933917,000
19347,689,000
193527,408,000
193630,406,000
193731,836,000
193832,643,000

Construction

Iraqi oil production in 1932 was 1,000,000 to 1,200,000 bbls/a. The planned capacity of the new pipe line was 30,000,000 bbls/a. H. S. Austin, president of the Tuscarora Oil Co. and the Ajax Pipe Line Co., responsible for the Ajax Pipeline, was head of the construction work. [7] The Ajax was a 400 mile, 65,000 bbls/day, twin 10-inch line between Glenn Pool (near Jenks, Oklahoma) and Wood River (near Alton, Illinois) and was completed in 1930 or 1931. [8] The Tuscarora Oil Company (subsidiary of Standard Oil of New Jersey) was not engaged in pipeline construction at the time. It had however at the end of 1929 reconditioned (cleaned) its 370 mile crude oil pipeline from Western Pennsylvania to the Bayway Refinery in New Jersey and now used it to transport gasoline in the opposite direction from east to west. [9] [10]

World Petroleum devoted the September 1932 issue to Iraq. [11]

Pipe

Pipe production [12] :50
ContractorSubcontractorsSizeJointsx 1000ftMilesSleevesx 1000kg
Flag of France.svg Comptoir Franco Belgo Sarrois
  • Flag of France.svg Louvroil & Recquignies
  • Flag of France.svg S.A. d'Escaut et Meuse
  • Flag of France.svg Acieries et Usines a Tubes de la Sarre
1276,6902,77952679,87056,878
Flag of the United Kingdom.svg Stewarts & Lloyds Ltd.
  • Flag of the United Kingdom.svg Bromford Tube Co. Ltd.
  • Flag of the United Kingdom.svg British Mannesmann Tube Co. Ltd.
1249,1401,76833449,37636,673
Flag of the United Kingdom.svg Oil Well Engineering Co.
  • Flag of Germany (3-2 aspect ratio).svg Mannesmannroehren Werke Dusseldorf
  • Flag of Germany (3-2 aspect ratio).svg Vereinigte Stahlwerke AG Dusseldorf
  • Flag of Germany (3-2 aspect ratio).svg Bismarckhutte Hajduki Wielkie (Poland)
1217,48062911818,39313,311
Oil Well Engineering Co.
  • British Mannesmann Tube Co. Ltd.
124,813177335,0543,746
Stewarts & Lloyds Ltd.
  • Bromford Tube Co. Ltd.
12 [a] 229910266
British Mannesmann Tube Co. Ltd.107,095265507,4564,343
Stewarts & Lloyds106,703247466,6744,092
Oil Well Engineering Co.
  • Vereinigte Stahlwerke AG Dusseldorf
  • Mannesmannrohren Werke Dusseldorf
103,526132253,6872,161
Oil Well Engineering Co.
  • Flag of the United States.svg Youngstown Sheet & Tube Co.
  • Flag of the United States.svg Spang Chalfant & Co.
  • Flag of the United States.svg National Tube Co.
105,542205385,8211,272
Oil Well Engineering Co.
  • National Tube Co.
10 [a] 4,393169324,6123,200
Stewarts & Lloyds82,10778141,3401,059
Total12148,3523,5621,012152,693110,874
Total1027,2591,01819128,25015,068
SizeJointsx 1000ftMilesSleevesx 1000kg

Logistics

Aviation

On October 16, 1932 aviation became available when one 3-engine 8-passenger Avro 618 Ten and one single-engine 4-passenger DH.50 arrived at Samakh. Both planes were purchased. In March 1933 a Farman monoplane was purchased and stationed at Homs. In March 1933 the 2 planes on the southern leg were replaced by two 3-engine 5-passenger Westland Wessex and around May 1933 the planes were relocated to a base at Haifa. In the early winter of 1933 the two planes based at Haifa were replaced by two twin-engine 6-passenger DH Dragon. Between October 1932 and June 1934 6,993 passengers and 200 tons of freight were moved in a total of 2,971 flights, 309,000 flown miles and 3,427 flown hours. [12] :65

To the Depots

Total employment (including contract labor) at end of quarter [12] :95
QuarterClass IClass IIClass III
2nd 1932921291,664
3rd 19322293384,519
4th 19323324605,892
1st 19333586369,359
2nd 193339385012,441
3rd 193338793313,044
4th 19333728009,076
1st 19343757019,214
2nd 193435767010,983
3rd 19343315978,872

There was one railhead for each of the 3 legs, which became depots and sites for workshops, offices and living quarters with employment ranging from 300 to 1,200 per site. [12] :26 One was at Baiji, a few miles east of what would become the K-2 pumping station, supplied via Basra. The southern leg depot was at Mafraq on the Hejaz Railway, supplied via Haifa and for the northern leg, Homs was chosen as it was already host to several small industries. [13] A fourth depot was erected at Haditha, with no railhead it nonetheless became the largest of the depots, a trans-shipping point, the headquarters of the Eastern Area of the project and the base for K-3 construction personnel. [12] :31 A fifth depot was in built in Tripoli. When construction wound down in 1934, the depots at Baiji, Mafraq and Homs were already in the process of being stripped of materials. The depot at Tripoli became the new pipe line terminal. The status of Haditha remained unclear. [12] :28

From August 1932 to May 1934 a total of 207,500 tons arrived from overseas: 57,000 at Haifa, 54,000 at Tripoli and 96,500 at Basra. Rail transport to the depots amounted to 37 million metric-ton miles. An additional 200,000 tons of building materials were obtained from local sources. [12] :37

From the Depots

By May 15, 1933 801 miles (about 66%) of pipe had been strung (laid out). This amounted to 4,750,000 ton miles of haulage of pipe alone and 7,000,000 overall haulage at this point of the estimated total 23,000,000 ton miles required (over time the distance driven from the depot to the current end of the line increased). [14]

Communications

IPC assistants welding pipes in the Jezreel Valley next to telephone mast Pipeline work.jpg
IPC assistants welding pipes in the Jezreel Valley next to telephone mast

Between September 1932 and finished April 24, 1933 one pair of telegraph and one pair of telephone wires were installed along the route. Nearly 26,000 tubular steel poles weighing 3,500 tons and 5,000 miles or 700 tons of cadmium copper wire were required. The posts were 25 feet high with a 48-inch cross arm and placed 211 feet apart (25 poles per mile), except if the terrain made this impractical. In that case some of the poles were 28 and 32 feet high as well. The river crossings were of course entirely different cases of special terrain. [14] [12] :62

Welding

Welding campaigns [12] :53
River crossingStartEnd
Euphrates3 September 19325 October 1932
Tigris7 October 193228 October 1932
CrewTotal milesStart (mile)End (mile)StartEndPipe
No. 1368 [b] 0Tigris (53)3 December 19324 April 1933twin
127Euphrates (149)twin
156Jordan border (373)19 November 1933
No. 2260531271 December 193221 May 1933twin
149156twin
156Syrian border (249)30 August 1933
No. 3262574482early December26 April 1933
574Haifa25 July 1933
482Iraq border (373)21 October 1933
No. 4282Tripoli (525)Iraq border (249)November 19326 July 1933

Startup

Trade of Iraq Oil (x 1000 barrels, FY ending March 31) [15]
19351936193719381939
via Tripoli
arriving5,81614,08115,11915,52115,367
exported4,68014,02015,21815,51515,280
...France4,13210,86813,17014,08111,803
...UK4591,8831,5897651,643
via Haifa
arriving6,19314,53214,78315,34815,185
exported5,26714,51415,06214,89814,985
...France3,82010,77411,2448,82510,256
...UK1,2772,8252,1983,6042,417

The Tripoli line was filled starting in early June 1934 with half of the pumping stations in operation and in July there had been attained a preliminary production capacity of 20,000 bbls/day or about 50% of rated capacity. Oil first arrived at the Tripoli terminal on July 14, 1934. [12] :115 The french chartered tanker Henry Desprez left for Le Havre on August 3, 1934 with a first shipment of 14,600 tons [12] :117 and arrived on August 20. [16] Later essentially all deliveries were earmarked for the new 15,000 bbls/day refinery at Martigues (near Marseille), a haul of approximately 1900 nautical miles. [17] and the new 25,000bbl/day Normandy Refinery [18] in Gonfreville (Le Havre; ca 3600nm). [16] Martigues was the 3rd largest refinery in France at the time, [19] . but only completed in 1935. [20]

The first oil arrived in Haifa on October 14, 1934, seven years to the day after oil was first struck at the Baba Gurgur No. 1 well. [12] :115 [21] The first shipment left Haifa on the French tanker Vendemiaire [22] on October 25, bound for Le Havre. [23]

The total cost of the project was $50,000,000. [24]

The Iraqi Petroleum Company in October 1934 published a 125-page report: The Construction of the Iraq-Mediterrnean Pipe-Line — A Tribute to the Men Who Built it. [12] World Petroleum devoted 40 pages to the project in the February 1935 issue. [25]

There were a total of 5 opening ceremonies: January 14, 1935 in Kirkuk, January 17 in Damascus, [26] January 19 in Tripoli, January 22 in Haifa, [27] and January 24 in Amman, [28] an average rate of 0.16 ceremonies per day for the month of January.

Pumping stations

The pumping stations were named in numerical order going westwards, with the stations from Kirkuk to Haditha denoted "K" (after Kirkuk) and the subsequent ones to the Mediterranean coast at Haifa denoted "H" (after Haifa) and those to Tripoli denoted "T". [29] H-4 and H-5 are in Jordan, T-2, T-3, T-4 in Syria, all others on Iraqi soil.

Pumping stations [12] :21
NameAltitude (ft)MileDownstream(approximate only)
K-1 1,008031.5 miles twin 10-inch, 34.5 miles twin 12-inch 35°30′55″N044°18′49″E / 35.51528°N 44.31361°E / 35.51528; 44.31361 (K-1 Pumping Station)
K-2478664.5 miles twin 10-inch, 79.5 miles twin 12-inch 34°54′47″N043°24′50″E / 34.91306°N 43.41389°E / 34.91306; 43.41389 (K-2 Pumping Station)
K-3453150north: 3.5 miles 10-inch, 56.5 miles 12-inch 34°04′31″N042°21′07″E / 34.07528°N 42.35194°E / 34.07528; 42.35194 (K-3 Pumping Station)
south: 6 miles twin [c] 10-inch, 45 miles 12-inch
T-11,0272118.5 miles 10-inch, 59.5 miles 12-inch 34°13′37″N041°19′50″E / 34.22694°N 41.33056°E / 34.22694; 41.33056 (T-1 Pumping Station)
T-21,2482795 miles 10-inch, 76 miles 12-inch 34°22′35″N040°09′08″E / 34.37639°N 40.15222°E / 34.37639; 40.15222 (T-2 Pumping Station)
T-31,2683604 miles 10-inch, 57 miles 12-inch 34°31′47″N038°44′48″E / 34.52972°N 38.74667°E / 34.52972; 38.74667 (T-3 Pumping Station)
T-41,08642110.5 miles 10-inch, 57.5 miles 12-inch, 20.5 miles 10-inch, 21 miles 12-inch
Tripoli532
H-1 1,312205.54.5 miles 10-inch, 54 miles 12-inch 33°47′23″N041°27′37″E / 33.78972°N 41.46028°E / 33.78972; 41.46028 (H-1 Pumping Station)
H-2 1,923263.54 miles 10-inch, 54 miles 12-inch 33°22′38″N040°37′04″E / 33.37722°N 40.61778°E / 33.37722; 40.61778 (H-2 Pumping Station)
H-3 2,550321.54.5 miles 10-inch, 91 miles 12-inch 32°56′49″N039°44′03″E / 32.94694°N 39.73417°E / 32.94694; 39.73417 (H-3 Pumping Station)
H-4 2,249416.58.5 miles 10-inch, 53 miles 12-inch, 5 miles 10-inch [d] 32°30′09″N038°11′32″E / 32.50250°N 38.19222°E / 32.50250; 38.19222 (H-4 Pumping Station)
H-5 2,3384834.5 miles twin 10-inch, 79.5 miles 12-inch, 8 miles 8-inch, 16 miles heavy twin 10-inch, 29.5 miles 12-inch [e] 32°10′32″N037°07′36″E / 32.17556°N 37.12667°E / 32.17556; 37.12667 (H-5 Pumping Station)
Haifa20621
1934 [12] :73
Station (each)PumpsTransmissionEngines
K6 x Worthington-Simpson 6.75-in x 24-in [f] horiz. double actingsingle reduction herringbone gears6 x Sulzer 4-cycle 5-cyl. 500hp diesel
T3 x the above3 x Werkspoor 4-cycle 5-cyl. 500hp diesel
H3 x Harland&Wolff 4-cycle 6-cyl. 500hp diesel
1949 [30]
K-13 x series pair of Mather&Platt 1800hp motor centrifugal [g] electricKirkuk field power plant
K6 x Crossley-Premier 2000hp opposed 16-cyl diesel, 1560kva alternator
T4 x Worthington-Simpson horiz. double-acting 7.75-in x 24-inflexible coupling4 x Harland&Wolff 300rpm 950bhp airless injection oil engines

Tripoli Terminal

There were 3 loading berths at the terminal, 4 mooring buoys per berth, at a depth of 50 feet of water. To each berth two 12-inch pipes were laid on the ocean floor in a fan-wise arrangement. To each pair of pipes a pair of flexible 10-inch hoses connected. The end of the pipes were at 4,420, 4,400 and 5,470 feet from the coast line and the berths 2,600 feet apart. With the tanks at the terminal sitting at 220 feet above sea level, gravity loading was used which could be assisted with lower power pumps and deliver 1,000 tons of oil per hour. [31]

There were 15 tanks of 93,000 bbl capacity each (a total of 1,395,000). [32] [12] :23 In March 1947 there were 27 tanks totaling 2,300,000bbl at Tripoli [33] and 36 of 93,000bbl each at the end of 1949. [34] During the war a small 5,000bbl/day topping plant was built at Tripoli. [35]

Haifa Terminal

Kirkuk-Haifa oil pipeline west end, Haifa, 1938 Mosul-Haifa oil pipeline, Haifa end at the Mediterranean, 1938.jpg
Kirkuk–Haifa oil pipeline west end, Haifa, 1938

There were 2 loading berths at the terminal, 4 mooring buoys per berth, at a depth of 32 feet of water. To each berth one extra heavy 12-inch pipe was laid on the ocean floor at right angles to the coast line. To each pipe, an Y-joint and two 8-inch flexible hoses were attached. The end of the lines were 4,212 and 4,201 feet from the shore with 2,600 feet separation between the berths. Centrifugal pumps on shore could deliver 1,000 tons per hour. [31]

There were 15 tanks of 93,000 bbl capacity at the Haifa terminal originally [12] :23 and 27 of 93,000bbl each at the end of 1949. [34]

Refinery

The Consolidated Refineries, Ltd. was jointly owned by the Anglo-Iranian Oil Co., Ltd and the Anglo-Saxon Petroleum Co. (Shell), with A.I.O.C. in charge of plant operation. Both companies held a 23.75% (each) interest in the Iraq Petroleum Company (IPC). [36] In September 1936 plans were announced to lay a railway siding from the Haifa-Acre line for the transportation of building materials. [37]

The refinery was constructed by the M. W. Kellogg Co. 3.5 miles northeast of the Port of Haifa on 360 acres. Construction began in October 1938 and production started on November 29, 1939, not too long after the outbreak of World War II and due to a crash program well ahead of schedule. [38] Unit 2 was brought online in 1941, unit 3 in August 1944, [36] by which time the refinery had reached the capacity needed to process all oil that the 12-inch pipelines could deliver from Kirkuk, albeit with compromises made that boosted quantity at the expense of quality. Oil arriving in Tripoli was brought to Haifa by tankers (one-way distance of 81 nautical miles [39] ), though this arrangement was not part of the original plan for the refinery. [40] [36] The Oil & Gas Journal published a detailed technical description in the 1945-11-17 issue. [36] In March 1947 the construction of a fourth unit of the same capacity was about to begin, [41] work on the new 16-inch loop line from Kirkuk was already underway at that point. The refinery shut down indefinitely on April 12, 1948 due to a strike of Arab workers following an attack in which several of them were injured. [42] This was subsequent to the Haifa Oil Refinery massacre of December 30, 1947.

The following paragraphs use contemporary sources, which due to the nature of Israel-Arab relations are vague to begin with and may contain disinformation, in particular as to the source of the crude oil that was delivered to Haifa.

In October 1949 [43] operations resumed on a much reduced scale using Venezuela crude oil as input. In June 1950 an agreement was reached to increase production to 20,000 bbl/day, saving an estimated $3,000,000 annually to Israel and covering 65 percent of the country's gasoline needs. Egypt was maintaining a blockade for ships through the Suez canal heading to the plant. [44] The source of crude oil was Qatar, tankers were to take the route around the Cape of Good Hope. [45]

At the end of 1955 the refinery was still operating at only 20% capacity. Russian crude oil was added to the list of sources in 1955. [46] Shipments were estimated to be 9,000 bbl/day on average during 1957 and 1958. Israel also started train runs to Haifa from their own recently discovered field at Heletz at a rate of merely 600 bbl/day in 1956. [47]

World War 2

Haifa under attack Bombing of haifa 13.jpg
Haifa under attack
Oil Production in Iraq [48] [49]
Barrels
193930,791,000
194024,225,000
194112,650,000
194219,726,000
194324,848,000
194430,943,000
194535,112,000
194635,665,000
Crude oil inputs to Haifa refinery [50]
Barrels [h]
1939554,800
19406,437,200
19418,854,000
194215,245,600
194320,702,400
194425,019,200
External videos
Nuvola apps kaboodle.svg Italian bombers attack Haifa

Deliveries of crude oil to Tripoli through Vichy France controlled Syria were suspended after the Fall of France. In the beginning of 1941 a small "refinery" was completed estimated to be able to keep running from the oil present in the tanks for a year. The products were consumed by the military and a power station in Aleppo. [52] [53] [54] Axis forces in Syria were defeated in a campaign that ended in July 1941. The northern branch was however not put into operation until early in 1943 [55] (or late 1942, suggested by Bureau of Mines statistics) and refining capacity was lacking, both locally and in allied parts of Europe. [56]

The Haifa refinery was struck by Italian air raids in 1940, [57] [58] but the damage was not severe. [59]

The tanker Beme was sunk on July 11, 1940 near Haifa by an Italian submarine.

Deliveries to Haifa stopped for the duration of the Anglo-Iraqi War (May 1941). [60] Bureau of mines statistics suggest that at the time the tanks at Tripoli were refilled.

The German submarine U-372 was sunk near Haifa on August 4, 1942.

The Italian submarine Scire was sunk on August 10, 1942 during an attempt to attack the port of Haifa with combat divers.

The La Mede refinery remained intact throughout the war, while French refineries on the Atlantic coast were largely destroyed. French refinery capacity as a whole returned to pre-war levels in 1947. [61]

Trade of Iraq Oil (x 1000 barrels, calendar year) [62] [63]
19391940194119421943 [i] 1944 [i] 1945
via Tripoli
arriving14,6217,1717301,0887,50012,05516,071
exported15,0276,8638131,0615,9689,54216,783
...France12,0046,53300001,481
...UK1,63929200000
...Syria29388131,0611,2501,4961,686
...Palestine00004,7188,04613,616
via Haifa
arriving14,00110,6389,55715,24816,94616,67016,362
exported14,24711,5918,99615,37716,59813,43116,748
...France9,9584,33000000
...UK1,79222800000
...Palestine6926,6918,91915,37716,59813,40616,678
...Transjordan02570
Oil producing centers in the Africa-Asia junction in 1940 [64] [65]
CountryOil fieldCapacity (bbl/day)
Iran Haft Kel 150,000
Masjed Soleyman 75,000
Iraq Kirkuk 85,000
Bahrein20,000
Egypt Ras Ghareb 12,500
14 others28,000
CountryRefineryCapacity (bbl/day)
Iran Abadan (AIOC)280,000
Bandar Shapur (AIOC)50,000
Kermanshah (AIOC)3,000
Palestine Haifa (AIOC,Shell)40,000
Bahrein(BAPCO)20,000
EgyptSuez (Anglo-Egyptian Oilfields Ltd)17,000
Suez (Raff. de Petrole du Government)1,400
Iraq Baba Gurgur (IPC)1,500
Khanaqin (AIOC)2,500

16-inch loop

Oil Production in Iraq [66] [67]
194735,834,000
194826,115,000
194930,957,000
195049,726,000
195165,122,000 [j]
1952141,100,000
1953210,268,000

In the summer of 1939 news out of London indicated that IPC was soon going to call bids for materials for a new 16-inch loop to its Mediterranean pipeline system. [68]

In late 1945, work began on two new 16-inch lines (85,000bbl/day each, 180,000 tons of pipe planned total), looping the two 12-inch lines in production. The project was hampered by delays. By March 1947, 150 miles of pipe had been strung (laid out) and 50 miles had been welded between H3 and H4. Materials were brought to depots at Mafraq and Baiji. The Haifa pipeline was expected to be finished in the spring of 1949, the Tripoli line a year after. [33] In June 1947 bids were invited for a 11,500bbl/day refinery at Baiji (K-2), [69] Pipe laying finished in April 1948. The additional capacity of 94,000bbl/day was to be reached in the autumn. Pipe for the project was provided by British Stewards & Loyds (60,000t) and two French companies (100,000t): Ste. Escaut et Meuse (at the Anzin plant) and Ste. Louvroil, Montbard et Aulnoyne (at the Aulnoye plant). [70] One section of 20 miles between the River Jordan and Haifa remained to be laid before deliveries could commence when work was stopped because of the unsettled conditions. [71] (see Battle of Haifa, 21-22 April). Continued attempts to circumvent Haifa for an alternative outlet in Lebanon were hampered by the refusal of the Lebanese government to grant right-of-way permissions for the needed construction. The reason for the refusal was an attempt by Lebanon to renegotiate transit fees for pipe lines in operation. [72] In the summer of 1961 the IPC handed over its assets in Jordan to the government, consisting of 200 miles of pipeline and pumping stations H-4 and H-5. The Jordanian government planned to distribute water from a plentiful untapped source at Azraq (due south of H-5). [73]

Pipe for the Tripoli 16-inch line (85,000bbl/day) was first constructed between K-3 and Tripoli. Stringing began in May 1948, welding began in October and was finished by July 1949. [74] The 16-inch line to Tripoli went into preliminary (40,000bbl/day) operation by August 1949. The line used the 16-inch portion between Kirkuk and K-3 that was originally laid for the Haifa line. [75] In November 1949 an extension of the small topping plant at the Tripoli terminus started production with capacity increased to 11,000bbl/day. [76] The 16-inch line consisted of two pipes between Kirkuk and K-3. [77]

30-inch loop

The Kirkuk–Baniyas pipeline (300,000bbl/day) between Kirkuk and a terminal some 50 miles to the north of Tripoli, outside of Lebanon territory, started preliminary production in April 1952.

Lateral lines

Ain Zalah

In early September 1952 IPC completed [78] a 134 mile, 12-inch pipe between the Ain Zalah field (map: [79] ) and K-2 with production there commencing in October. The line extended from the Ain Zalah oil field northwest of Mosul south-eastwards and joined the 12-inch and 16-inch main lines at K-2. Ain Zalah was discovered in 1940 and was the fourth field in Iraq to produce (after Naft Khana, [80] Kirkuk in 1934 and Zubair in early 1952 [81] ). The expected final production rate of the field was 25,000 bbls/day. [82] The Ain Zalah field was briefly captured by the Islamic State during the month of August 2014 and the damage caused was estimated at $5 million. Kurdish forces recaptured the field on September 2, 2014. [83]

Drilling at Ain Zalah
feet drilledcumulative feetwells completedtotal wells
1946 [84] 12 (shut in)
1948 [85] 4
1951 [86] 7,23681,372two at 9,713 and 10,164

Daura

In December 1953 construction started on a 132 mile 12-inch pipe line from K-2 to the new refinery at Daura near Baghdad. The new line was owned by the Iraqi government, which also paid the cost of pumping the oil from K-2 to Daura and bought oil from the IPC at a token price at K-2, under the umbrella of the preexisting overall profit-sharing agreement with the company. Flooding in the spring of 1954 delayed the project, the line was finished in early September 1954. [87] The $30 million refinery was built by M. W. Kellog and owned by the government. At the time it satisfied essentially the entire national demand for refined oil products. It included units for thermal cracking, kerosine treatment and gasoline treatment and a steam and electric power generation unit. The refinery began operations in June 1955. Rated at 6,500 bbl/d gasoline, 3,450 bbl/d kerosine and 3,900 bbl/d fuel oil from a supply of 24,000 bbl/d of crude oil, in the first few months of operation it achieved up to 27,000 bbl/d. At the end of 1955, Foster Wheeler was constructing a 25,000 tons/year lubricants plant at the refinery site. [88]

Bai Hassan

The Bai Hassan field began production in June 1960. It was connected to K-1 via a 20-mile 12-inch line. [89]

Cathodic Protection

Leaks in the 12-inch line
194555
194644
194724
194824
194953
195073
195131
1952109
195380
195468
195531
195685
1957325
1958104
195960
196056

Approximately at the laying of the 30-inch pipe, cathodic protection was for the first time made part of the pipeline system. The Westinghouse Brake and Signal Co., Ltd. provided combination units of a transformer and a selenium rectifier housed in a common cooling oil bath, the whole device bulky enough to require a ladder to reach the top. Each unit could provide a maximum of 40 Amperes at the maximum 50 Volts and an overall maximum current of 45A. A particular current setting was selected (depending on soil conditions) and that constant current maintained by an internal regulator. The rectifiers were installed at intervals of 5 to 10 miles. [90] A pair of aluminum wires originating at pumping stations were suspended from the telephone masts to distribute 11kV single phase AC current to the rectifiers. When subsequently analyzed it was found that this protection was not performing miracles, as expected for desert conditions where infrequent rain tends to produce inhomogeneous concentration of salts near the surface. While on average only 0.2 to 0.5 Amperes per mile were required for the new 30-inch line, for the 16-inch line this was 2 to 4 Amps and for the old 12-inch line the figure was 4 to 10 Amperes, even though the latter had the smallest exposed surface area per mile. The investigation also included a tally of recorded leaks for the 12-inch line (note the peak in 1957 due to repressurization stresses after the month long Suez crisis shutdown). [91]

The IPC had sent a representative on a tour of United States corrosion laboratories in 1947. [92]

See also

Notes

  1. 1 2 Extra Heavy
  2. No. 1 crew was reinforced in the late stage by elements from the other crews
  3. to ensure full capacity while limiting the number of H-x pumping stations to 5
  4. these 5 miles and the 10-inch loop at the downstream of H-5 were due to a last minute relocation of the pumping station to a nearby mudflat for use as a landing strip
  5. This unusual arrangement was a means to control the pressure while the pipeline descended from 2,575 feet at mile 567 to -885ft at mile 581 and then cleared the hills west of the Jordan river.
  6. Dimensions written as bore x stroke throughout
  7. One pair on standby
  8. Using the factor of 1.016*7.481=7.6 recommended by the Bureau of Mines to convert long tons to barrels. [51]
  9. 1 2 Estimated in part
  10. How was Iraq able to increase production in 1951?

Related Research Articles

<span class="mw-page-title-main">Trans-Israel pipeline</span> Oil pipeline in Israel

The Trans-Israel pipeline, also Tipline, Eilat–Ashkelon Pipeline, or Europe–Asia Pipeline is an oil pipeline in Israel extending from the Gulf of Aqaba on the Red Sea to the Mediterranean Sea. It was originally built to transport crude oil originating from Iran inside Israel and to Europe.

<span class="mw-page-title-main">Iraq Petroleum Company</span> England-based oil company

The Iraq Petroleum Company (IPC), formerly known as the Turkish Petroleum Company (TPC), is an oil company that had a virtual monopoly on all oil exploration and production in Iraq between 1925 and 1961. It is jointly owned by some of the world's largest oil companies and headquartered in London, England.

<span class="mw-page-title-main">Trans-Arabian Pipeline</span> Oil pipeline

The Trans-Arabian Pipeline (Tapline), was an oil pipeline from Qaisumah in Saudi Arabia to Sidon in Lebanon, active 1950–1976. In its heyday, it was an important factor in the global trade of petroleum, as well as in American–Middle Eastern political relations, while locally helping with the economic development of Lebanon. The pipeline was built and operated by the Trans-Arabian Pipeline Company, now a fully owned subsidiary of Aramco. It largely ceased functioning in 1983 and completely stopped operating in 1990.

The Eilat Ashkelon Pipeline Company operates several crude petroleum and refined petroleum products pipelines in Israel, most notably the Eilat Ashkelon Pipeline – which transports crude oil across southern Israel, between the Red Sea and the Mediterranean Sea. The EAPC also operates two maritime oil terminals as well as oil storage depots in the country.

<span class="mw-page-title-main">Kirkuk–Ceyhan Oil Pipeline</span> Oil Pipeline

The Kirkuk–Ceyhan Oil Pipeline, also known as the Iraq–Turkey Crude Oil Pipeline, is a 600-mile-long (970 km) pipeline that runs from Kirkuk in Iraq to Ceyhan in Turkey. It is Iraq's largest crude oil export line.

<span class="mw-page-title-main">Petroleum industry in Canada</span>

Petroleum production in Canada is a major industry which is important to the overall economy of North America. Canada has the third largest oil reserves in the world and is the world's fourth largest oil producer and fourth largest oil exporter. In 2019 it produced an average of 750,000 cubic metres per day (4.7 Mbbl/d) of crude oil and equivalent. Of that amount, 64% was upgraded from unconventional oil sands, and the remainder light crude oil, heavy crude oil and natural-gas condensate. Most of the Canadian petroleum production is exported, approximately 600,000 cubic metres per day (3.8 Mbbl/d) in 2019, with 98% of the exports going to the United States. Canada is by far the largest single source of oil imports to the United States, providing 43% of US crude oil imports in 2015.

<span class="mw-page-title-main">Petroleum transport</span> Transportation of petroleum and derivative products

Petroleum transport is the transportation of petroleum and derivatives such as gasoline (petrol). Petroleum products are transported via rail cars, trucks, tanker vessels, and pipeline networks. The method used to move the petroleum products depends on the volume that is being moved and its destination. Even the modes of transportation on land such as pipeline or rail have their own strengths and weaknesses. One of the key differences are the costs associated with transporting petroleum though pipeline or rail. The biggest problems with moving petroleum products are pollution related and the chance of spillage. Petroleum oil is very hard to clean up and is very toxic to living animals and their surroundings.

Kirkuk Field is an oilfield in Kirkuk, Iraq. It was discovered by the Turkish Petroleum Company at Baba Gurgur in 1927. The oilfield was brought into production by the Iraq Petroleum Company (IPC) in 1934 when the 12-inch pipelines from Kirkuk to Haifa and Tripoli were completed. It has ever since remained the most important part of northern Iraqi oil production with over 10 billion barrels of proven remaining oil reserves in 1998. After about seven decades of operation, Kirkuk still produces up to 1 million barrels per day, almost half of all Iraqi oil exports. Oil from the Kirkuk oilfield is now exported through the Kirkuk–Ceyhan Oil Pipeline, which runs to the Turkish port of Ceyhan on the Mediterranean Sea.

<span class="mw-page-title-main">Big Inch</span> Petroleum pipelines from Texas to New Jersey

The Big Inch and Little Big Inch, collectively known as the Inch pipelines, are petroleum pipelines extending from Texas to New Jersey, built between 1942 and 1944 as emergency war measures in the United States. Before World War II, petroleum products were transported from the oil fields of Texas to the north-eastern states by sea by oil tankers. After the U.S. entered the war on 1 January 1942, this vital link was attacked by German submarines in Operation Paukenschlag, threatening both the oil supplies to the north-east and its onward transshipment to Great Britain. The Secretary of the Interior, Harold Ickes, championed the pipeline project as a way of transporting petroleum by the more-secure, interior route.

<span class="mw-page-title-main">Kirkuk–Baniyas pipeline</span> Oil pipeline out of service

The Kirkuk–Baniyas pipeline is a currently defunct crude oil pipeline from the Kirkuk oil field in Iraq to the Syrian port of Baniyas. The pipeline went into operation in April 1952 and was formally opened in November.

The Az Zubair Field, also known as Az-Zubayr, is an oil field located in southern Iraq, west of Basrah. It is one of the largest fields in the world and was discovered by the Basrah Petroleum Company, an associate of the Iraq Petroleum Company, in 1949. Zubair was the first field developed by the company on a concession granted in 1938. Commercial production started in December 1951. Oil was delivered via some 70 miles of pipeline to a new loading facility at Al-Faw (Fao). The Zubair field was the third oil field in Iraq to enter production and the first in the south of the country. The even larger Rumaila oil field was discovered in 1953 some 20 miles west of Zubair.

<span class="mw-page-title-main">Bahrain Petroleum Company</span> State-owned oil company of Bahrain

The Bahrain Petroleum Company (BAPCO) is an integrated petroleum company that is the national oil company of Bahrain.

The Seaway Crude Pipeline System (SCPS), commonly known as the Seaway Pipeline, is an oil pipeline system which transports crude oil between Cushing, Oklahoma and Freeport, Texas, and through the Texas City, Texas Terminal and Distribution System on the Gulf Coast of the United States. The Seaway is an important crude oil transfer link between two petroleum regions within the United States.

<span class="mw-page-title-main">Petroleum industry in Iraq</span> Worlds fifth largest proven petroleum reserves

Iraq was the world's 5th largest oil producer in 2009, and has the world's fifth largest proven petroleum reserves. Just a fraction of Iraq's known fields are in development, and Iraq may be one of the few places left where vast reserves, proven and unknown, have barely been exploited. Iraq's energy sector is heavily based upon oil, with approximately 94 percent of its energy needs met with petroleum. In addition, crude oil export revenues accounted for over two-thirds of GDP in 2009. Iraq's oil sector has suffered over the past several decades from sanctions and wars, and its oil infrastructure is in need of modernization and investment. As of June 30, 2010, the United States had allocated US$2.05 billion to the Iraqi oil and gas sector to begin this modernization, but ended its direct involvement as of the first quarter of 2008. According to reports by various U.S. government agencies, multilateral institutions and other international organizations, long-term Iraq reconstruction costs could reach $100 billion (US) or higher.

<span class="mw-page-title-main">History of petroleum industry in Iraq</span>

There is a long history of the petroleum industry in Iraq.

The La Mèderefinery is a biorefinery that previously operated as a traditional fossil fuel refinery owned by TotalEnergies in Châteauneuf-les Martigues near Marseille, France, and on the Etang de Berre. The plant includes about 250 hectares.

Naft Khana is an Iraqi town in Diyala Governorate, central Iraq, near the Iraqi-Iranian border. Its population were Kurdish nationality during the Iran-Iraq war. Its residents were displaced according to the Arabization policy. Nearby are oil fields containing oil wells found by British companies after the British occupation in 1924. It is considered one of the richest areas in the Diyala Governorate.

References

  1. Bonné, Alfred (November 1932). "The Concessions for the Mosul-Haifa Pipe Line". Annals of the American Academy of Political and Social Science. 164: 116–126. doi:10.1177/000271623216400115. JSTOR   1018964. S2CID   143929570.
  2. 1 2 Iraq Petroleum Company, AN ACCOUNT OF THE CONSTRUCTION IN THE YEARS 1932 TO 1934 OF THE PIPELINE OF THE IRAQ PETROLEUM COMPANY LIMITED FROM ITS OILFIELD IN THE VICINITY OF KIRKUK TO THE MEDITERRANEAN PORTS OF HAIFA (Palestine) and TRIPOLI (Lebanon), pg. iii
  3. Ferrier, Ronald W.; Bamberg, J. H. (12 October 1982). The History of the British Petroleum Company. Cambridge University Press. pp. 164–165. ISBN   9780521259507 via Google Books.
  4. "תומוקמ". etzel.org.il. Archived from the original on 26 October 2021. Retrieved 12 October 2021.
  5. Minerals Yearbook 1936. U.S. Department of the Interior, Bureau of Mines. 1936. p. 702.
  6. Minerals Yearbook 1940. U.S. Department of the Interior, Bureau of Mines. 1940. p. 1029.
  7. "Iraq Pipe Line to be Completed by 1935". The Oil and Gas Journal. Vol. 30, no. 44. 17 March 1932. p. 15.
  8. "Make Good Progress in Building Line". The Oil and Gas Journal. Vol. 29, no. 20. 2 October 1930. p. R-3.
  9. "Standard Oil Company of New Jersey". World Petroleum. Vol. 1, no. 4. May 1930. p. 180.
  10. "Operate Gasoline Line Early in 1930". The Oil and Gas Journal. Vol. 28, no. 29. 5 December 1929. p. 56.
  11. "Iraq - A new nation founded on Oil". World Petroleum. Vol. 3, no. 9. September 1932.
  12. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 An account of the construction in the years 1932 to 1934 of the pipe-line of the Iraq petroleum company, limited, from its oilfield in the vicinity of Kirkuk, ...
  13. "Authoritative Details About Iraq Pipeline Are Supplied By the Iraq Petroleum Company". The Oil and Gas Journal. Vol. 31, no. 13. 18 August 1932. p. 12.
  14. 1 2 "Iraq Pipe Line Construction Proceeds Favourably Under Exceptionally Difficult Conditions". The Oil and Gas Journal. Vol. 32, no. 18. 21 September 1933. p. 38.
  15. "Iraq - Exports of Crude Petroleum, 1935-1939". International Petroleum Trade. Vol. 11, no. 4. United States Bureau of Mines. 30 April 1942. p. 63.
  16. 1 2 "Iraq Oil in France". The Palestine Post. 29 August 1934. p. 7.
  17. "Port of Marseille, France to Port of Beirut, Lebanon sea route and distance". Ports.com. Retrieved 31 December 2024.
  18. "Normandy Plant of French Company Incorporates Modern Trends in Design of New Equipment". The Oil and Gas Journal. Vol. 32, no. 4. 15 June 1933. p. 12.
  19. "Petroleum Refineries in France". The Oil and Gas Journal. Vol. 32, no. 32. 28 December 1933. p. 134.
  20. "France - Refining Industry Continued to Expand in Number of Plants and Output". The Oil and Gas Journal. Vol. 33, no. 32. 27 December 1934. p. 98.
  21. "First Oil Through Iraq Line Pumped to Haifa". The Oil and Gas Journal. Vol. 33, no. 22. 18 October 1934. p. 32.
  22. Lloyd's register of shipping 1934 Steamers.
  23. "First Petrol Shipment From Haifa". The Palestine Post. 26 October 1934. p. 1.
  24. "Iraq Pipe Line, Largest Project Outside United States, Is Completed This Week". The Oil and Gas Journal. Vol. 33, no. 23. 25 October 1934. p. 82.
  25. "(no title)". World Petroleum. Vol. 6, no. 2. February 1935. p. 53.{{cite news}}: Cite uses generic title (help)
  26. "The Iraq-Mediterranean Oil Pipeline". Engineering. 18 January 1935. p. 55.
  27. "Iraq Oil is Piped to Ship at Haifa". The New York Times. Vol. 84, no. 28123. 23 January 1935. p. 36.
  28. "Title Given to Oil Head". The New York Times. Vol. 84, no. 28125. 25 January 1935. p. 7.
  29. Iraq Petroleum Company, AN ACCOUNT OF THE CONSTRUCTION IN THE YEARS 1932 TO 1934 OF THE PIPELINE OF THE IRAQ PETROLEUM COMPANY LIMITED FROM ITS OILFIELD IN THE VICINITY OF KIRKUK TO THE MEDITERRANEAN PORTS OF HAIFA (Palestine) and TRIPOLI (Lebanon), map6
  30. "IPC Increases Pipe Line Throughput". The Petroleum Engineer. Vol. 21, no. 11. October 1949. p. D-26.
  31. 1 2 "Sea Loading Berths for Oil Tankers". The Dock and Harbor Authority. Vol. 15, no. 173. March 1935.
  32. "News From Foreign Lands". The Oil and Gas Journal. Vol. 33, no. 10. 26 July 1934. p. 34.
  33. 1 2 "Completion of New Kirkuk-Haifa Line Expected in Spring of 1949". The Oil and Gas Journal. Vol. 45, no. 43. 1 March 1947. p. 46.
  34. 1 2 "IPC Increases Pipe Line Throughput". The Petroleum Engineer. Vol. 21, no. 11. October 1949. p. D-25.
  35. "French get Lebanon Refinery Concession". The Oil and Gas Journal. Vol. 46, no. 31. 6 December 1947. p. 59.
  36. 1 2 3 4 "90,000 bbl Haifa Refinery - Largest in Mediterranean Area". The Oil and Gas Journal. Vol. 44, no. 28. 17 November 1945. p. 160.
  37. "The Month's Activities in Refining". The Petroleum Engineer. Vol. 9, no. 13. September 1938. p. 22.
  38. "Haifa Refinery Played an Important Part in Supporting Allied Operations in Mediterranean Theatre". World Petroleum. Vol. 16, no. 13. December 1945. p. 44.
  39. "Port of Beirut, Lebanon to Port of Haifa, Israel sea route and distance". Ports.com. Retrieved 1 January 2025.
  40. "Postwar Outlook Special - Eastern Hemisphere". The Oil and Gas Journal. Vol. 43, no. 28. 18 November 1944.
  41. "Expansion at Haifa Refinery to Result in Capacity of More Than 100,000 Bbl Daily". The Oil and Gas Journal. Vol. 45, no. 44. 8 March 1947. p. 42.
  42. "Long Shutdown Seen For Haifa Refinery". The Oil and Gas Journal. Vol. 47, no. 1. 6 May 1948. p. 56.
  43. "Oil Refinery Resumes". The Australian Jewish Herald. 28 October 1949. p. 4.
  44. "Haifa To Reopen". The Oil and Gas Journal. Vol. 49, no. 9. 6 July 1950. p. 32.
  45. "Crude for Haifa". The Oil and Gas Journal. Vol. 49, no. 11. 20 July 1950. p. 64.
  46. "Israel Buys Red Oil". The Oil and Gas Journal. Vol. 54, no. 28. 14 November 1955. p. 142.
  47. "Israel Looks to Russia". The Oil and Gas Journal. Vol. 55, no. 64. 23 July 1956. p. 73.
  48. Minerals Yearbook 1944. U.S. Department of the Interior, Bureau of Mines. 1944. p. 1166.
  49. Minerals Yearbook 1947. U.S. Department of the Interior, Bureau of Mines. 1947. p. 975.
  50. "Haifa Refinery Played Important Part In Supporting Allied Operations in Mediterranean Theater". World Petroleum. Vol. 16, no. 13. December 1945. p. 46.
  51. United States Bureau of Mines (30 March 1940). "Crude Petroleum Conversion Factors". International Petroleum Trade. Vol. 9, no. 3. p. 128.
  52. "Mediterranean Oil Situation Becomes More Critical". The Oil and Gas Journal. Vol. 39, no. 9. 11 July 1940. p. 30.
  53. "Tripoli Refinery Too Small". The Palestine Post. 14 April 1941. p. 2.
  54. "New Tripoli Refinery Almost Ready". The Palestine Post. 26 November 1940. p. 3.
  55. "Foreign Developments Depend on Clarified U.S. Policy". The Oil and Gas Journal. Vol. 42, no. 34. 30 December 1943. p. 92.
  56. "Trends". The Oil and Gas Journal. Vol. 42, no. 23. 14 October 1943. p. 25.
  57. "Oil Picture Cloudy in War's Second Year". The Oil and Gas Journal. Vol. 39, no. 18. 12 September 1940. p. 27.
  58. "Foreign Oil Legion". World Petroleum. Vol. 11, no. 12. November 1940. p. 68.
  59. "Oil Shortage Dictates Axis' Drive Towards Southeast". The Oil and Gas Journal. Vol. 39, no. 23. 17 October 1940. p. 23.
  60. "Oil Deliveries to Port of Haifa are Resumed". The Oil and Gas Journal. Vol. 40, no. 5. 12 June 1941. p. 23.
  61. https://en.wikipedia.org/w/index.php?title=La_M%C3%A8de_refinery&oldid=1268363082
  62. "Iraq - Exports of Crude Petroleum, 1935-1939". International Petroleum Trade. Vol. 15, no. 1. United States Bureau of Mines. 31 January 1946. p. 11.
  63. "Iraq - Exports of Crude Petroleum, 1935-1939". International Petroleum Trade. Vol. 16, no. 7. United States Bureau of Mines. 31 July 1947. p. 114.
  64. "Oil Shortage Dictates Axis' Drive Towards Southeast". The Oil and Gas Journal. Vol. 39, no. 23. 17 October 1940. p. 23.
  65. "World Oil Refineries Survey". The Oil and Gas Journal. Vol. 40, no. 33. 25 December 1941. p. 107.
  66. Minerals Yearbook 1950. U.S. Department of the Interior, Bureau of Mines. 1950. p. 1001.
  67. Minerals Yearbook 1954 Vol 2 Fuels. U.S. Department of the Interior, Bureau of Mines. 1954. p. 428.
  68. "I.P.C to Build Second Mediterranean Pipeline". World Petroleum. Vol. 10, no. 8. August 1939. p. 38.
  69. "Iraq Refinery Bids Asked". The Oil and Gas Journal. Vol. 46, no. 6. 14 June 1947. p. 75.
  70. "Laying of Kirkuk-Haifa 16-In. Line is Completed; To Be Operating This Fall". The Oil and Gas Journal. Vol. 46, no. 52. 29 April 1948. p. 61.
  71. "Pipe Export Denial Changes Route of Trans-Arabian; Delays Other Lines". The Oil and Gas Journal. Vol. 47, no. 9. 1 July 1948. p. 38.
  72. "New Line Studied". The Oil and Gas Journal. Vol. 52, no. 41. 15 February 1954. p. 109.
  73. "Crude Lines to Carry Water for Jordan". The Oil and Gas Journal. Vol. 59, no. 28. 10 July 1961. p. 85.
  74. "Kirkuk-Mediterranean System To Reach Half Capacity in 1950". The Oil and Gas Journal. Vol. 48, no. 24. 20 October 1949. p. 74.
  75. "Kirkuk-Tripoli 16-in. Line Begins Operation". The Oil and Gas Journal. Vol. 48, no. 16. 25 August 1949. p. 85.
  76. "Topping Plant Finished". The Oil and Gas Journal. Vol. 48, no. 30. 1 December 1949. p. 53.
  77. "Kirkuk Expanding". The Oil and Gas Journal. Vol. 50, no. 36. 14 January 1952. p. 74.
  78. "I.P.C.'s Ain Zalah Crude Line Ready". The Oil and Gas Journal. Vol. 51, no. 18. 8 September 1952. p. 77.
  79. "IRAQ-Producing Area". World Oil. Vol. 128. July 1948. p. 297.
  80. "News From Foreign Lands - Iraq". The Oil and Gas Journal. Vol. 32, no. 42. 8 March 1934. p. 17.
  81. "World Production At All Time High". The Oil and Gas Journal. Vol. 50, no. 33. 20 December 1951. p. 230.
  82. "Ain Zalah Producing". The Oil and Gas Journal. Vol. 51, no. 31. 8 December 1952. p. 86.
  83. Kurdistan24 (16 May 2016). "Iraq's damaged oil field needs $5m to restart". Iraq’s damaged oil field needs $5m to restart. Retrieved 31 December 2024.{{cite web}}: CS1 maint: numeric names: authors list (link)
  84. "IRAQ". World Oil. Vol. 121, no. 12. 20 May 1946. p. 249.
  85. "Highlights on 1948 Developments in Foreign Petroleum Fields". Bulletin of the American Association of Petroleum Geologists. Vol. 33, no. 6. June 1949. p. 1104.
  86. "Records in Iraq". The Oil and Gas Journal. Vol. 51, no. 16. 25 August 1952. p. 92.
  87. "Iraq Line Finished". The Oil and Gas Journal. Vol. 53, no. 19. 13 September 1954. p. 102.
  88. "New Iraq Plant Opens New Era". The Oil and Gas Journal. Vol. 54, no. 32. 12 December 1955. p. 80.
  89. "14th Annual Round-up of World Oil Activities - Iraq". The Petroleum Engineer. Vol. 33, no. 6. June 1961. p. A-39.
  90. "Pipe Line Corrosion - Developments in Constant-Current Cathodic Protection for Buried Metal Structures". Electrical Times. Vol. 120, no. 3113. 5 July 1951. p. 4.
  91. "Cathodic Protection in Desert Soils". Corrosion. Vol. 17, no. 12. December 1961. p. 75.
  92. "General Interest". Corrosion. Vol. 3, no. 8. August 1947. p. 9.