MT Yuriy Kuchiev

Last updated
MT Yuriy Kuchiev.jpg
Yuriy Kuchiev in Hietalahti shipyard on 30 December 2018
History
Name:Yuriy Kuchiev
Namesake: Yuri Kuchiev
Operator: Dynacom
Port of registry: Limassol, Flag of Cyprus.svg  Cyprus [1]
Builder:
Yard number: 515
Laid down: 27 July 2017 [2]
Launched:
  • 16 July 2018 (forward part) [3]
  • 17 December 2018 (complete ship) [4]
Completed:
  • Late 2018 (initial schedule)
  • 28 August 2019 (actual delivery) [5]
Identification: IMO number:  9804033 [1]
Status: In service
General characteristics [6]
Type: Gas condensate tanker
Tonnage:
Length: 230 m (755 ft)
Beam: 32.5 m (107 ft)
Draught:
  • 11.7 m (38 ft) (design)
  • 12 m (39 ft) (maximum)
Depth: 18 m (59 ft)
Ice class: RMRS Arc7
Installed power:
  • 2 ×  Wärtsilä 12V32 (2 × 6,720 kW)
  • 2 × Wärtsilä 16V32 (2 × 8,960 kW)
Propulsion: Diesel-electric; two ABB Azipod units (2 × 11 MW)
Speed:
  • 16 knots (30 km/h; 18 mph) (maximum)
  • 13 knots (24 km/h; 15 mph) (service)
  • 2 knots (3.7 km/h; 2.3 mph) (icebreaking)
Crew: 26; accommodation for 30

Yuriy Kuchiev is an icebreaking gas condensate tanker operated by the Greek shipowner Dynacom. The vessel, built at Arctech Helsinki Shipyard in Finland, utilizes the double acting ship principle to allow independent operation without icebreaker escort in ice-covered seas. The vessel was delivered to the owner in August 2019.

Contents

History

Development and construction

In early 2016, it was reported that the Greek shipowner Dynacom had ordered two 58,000  DWT arctic condensate tankers to transport gas condensate from the natural gas fields in the Yamal Peninsula. One of the vessels would be built at Guangzhou Shipyard in China while the other was ordered at an undisclosed price from the Russian-owned Arctech Helsinki Shipyard. [7] [8] While the Finnish shipyard was initially reluctant to confirm the contract, [9] the tanker was included in a presentation by Arctech CEO Esko Mustamäki at the Conference on the Economic Development of the Arctic in June 2016. [10] Although over 500 vessels have been delivered from the Hietalahti shipyard in the past 150 years, the newbuilding number 515 would be the first tanker built at the shipyard. [6]

While the final hull assembly would be carried out in Helsinki, a 167-metre (548 ft) forward section was subcontracted to Brodotrogir Shipyard in Croatia, where steel production began in February 2017. [11] However, the official keel laying ceremony, which marks the start of hull assembly, was held in Helsinki on 27 July 2017. [2] The bow section of the vessel was launched on 16 July 2018 and arrived in Helsinki on board a semi-submersible heavy-lift ship in August. [3] [12] The vessel was launched on 17 December 2018, floated out on 28 December, and returned to the covered dry dock bow-first on 30 December. [4] Over the spring, the vessel was still being outfitted at the shipyard, reportedly due to production delays and quality issues with the Croatian-built forward section. [13] On 29 April, Yuriy Kuchiev was moved from the covered dry dock to the shipyard's outfitting pier in preparation of inclining test before leaving for the first sea trials on 6 May. [14] [15] The vessel was finally delivered to Dynacom in an official naming ceremony on 28 August 2019. [5]

The vessel is named after Yuri Kuchiev (1919–2005), the captain of the Soviet nuclear-powered icebreaker Arktika when the vessel became the first surface ship to reach the North Pole in 1977. [16]

The arctic condensate tanker Yuriy Kuchiev is the last vessel delivered by Arctech Helsinki Shipyard in Finland; the shipyard's ownership was transferred to a new company, Helsinki Shipyard Oy, in May 2019. [17]

Design

General characteristics

Yuriy Kuchiev is 230 metres (755 ft) long and has a beam of 32.5 metres (107 ft), making the vessel the widest newbuilding ever delivered from Hietalahti shipyard. The length-to-beam ratio is slightly greater than that of other icebreaking tankers operating in the region, improving ice-going capability as well as allowing the hull to be assembled in Arctech's Panamax-sized [note 1] dry dock. The maximum draft of the vessel, limited by the port of Sabetta in the Gulf of Ob, is 12 metres (39 ft). The vessel's design deadweight tonnage is 50,000 tons. [6]

The hull of the vessel is strengthened to ice class Arc7 according to the requirements of the Russian Maritime Register of Shipping. This allows the vessel to operate in up to 1.8 metres (5.9 ft) thick first-year ice during the winter and spring navigation seasons, and in second-year ice during summer and autumn. In addition, operation is allowed along the full length of the Northern Sea Route, but in heavy ice conditions icebreaker escort is required. [18] Since the vessel is designed according to the double acting ship principle, the stern of the vessel is strengthened in the same way as the bow. In order to offset the increased scantlings, the hull is made mainly out of high-strength shipbuilding steel. The vessel is also thoroughly winterized for operation in ambient temperatures down to −50 °C (−58 °F) and features a covered forward mooring deck to protect the deck equipment from icing. [6]

Power and propulsion

While a typical 50,000 DWT Handymax tanker would have a single conventional shaft line and propulsion power in the range of 9 to 10 megawatts (12,000 to 13,000 hp), Yuriy Kuchiev is designed to operate independently in difficult ice conditions and thus requires a specialized propulsion system as well as significantly more installed power. The diesel-electric power plant consists of two 6,720-kilowatt (9,010 hp) 12-cylinder Wärtsilä 12V32 and two 8,960-kilowatt (12,020 hp) 16-cylinder Wärtsilä 16V32 four-stroke medium-speed diesel engines driving alternators. In addition, there is a 740-kilowatt (990 hp) harbor diesel generator. For propulsion, Yuriy Kuchiev has two 11-megawatt (15,000 hp) ABB Azipod VI2300 azimuthing propulsion units with 5.6-metre (18 ft) stainless steel propellers. The propulsion units are of pulling type, meaning that the propeller is always facing the direction of motion: when breaking ice in astern direction (backwards), the propellers are turned around to face the stern of the vessel and help with the icebreaking process. [6]

Yuriy Kuchiev is designed to break 1.9-metre (6 ft) level ice in a continuous motion with a speed of 2 knots (3.7 km/h; 2.3 mph) in astern direction. When sailing bow-first, the icebreaking capability is about 1.5 metres (5 ft). In open water, the vessel's economical service speed is 13 knots (24 km/h; 15 mph). [6]

Notes

  1. The old Panamax general limitation for beam was 32.31 metres (106.0 ft) prior to expansion.

Related Research Articles

MT <i>Mastera</i> Finnish Aframax crude oil tanker

MT Mastera is a Finnish Aframax crude oil tanker operated by Neste Shipping. She and her sister ship, Tempera, were the first ships to utilize the double acting tanker (DAT) concept in which the vessel is designed to travel ahead in open water and astern in severe ice conditions. The icebreaking tanker transports crude oil year-round from the Russian oil terminal in Primorsk to Neste Oil refineries in Porvoo and Naantali.

<i>La Noumbi</i>

La Noumbi is a floating production storage and offloading (FPSO) unit operated by Perenco. The vessel, converted from the former Finnish Aframax crude oil tanker Tempera by Keppel Corporation, will replace an older FPSO unit in the Yombo field off the Republic of Congo in 2018.

SCF Sakhalin is a Russian icebreaking platform supply and standby vessel owned by SCF Sakhalin Vessels Limited, a subsidiary of Sovcomflot. The ship was built by Aker Finnyards Helsinki shipyard in Finland in 2005 as FESCO Sakhalin for Far East Shipping Company (FESCO), but was purchased by Sovcomflot and renamed in 2010. Since the beginning it has been in long-term charter for Exxon Neftegas Ltd. and used to supply oil platforms in the Sakhalin-I project.

Double acting ship A type of icebreaking ship designed to break heavy ice while going astern

Double acting ship is a type of icebreaking ship designed to run ahead in open water and thin ice, but turn around and proceed astern (backwards) in heavy ice conditions. In this way, the ship can operate independently in severe ice conditions without icebreaker assistance but retain better open water performance than traditional icebreaking vessels.

Arctech Helsinki Shipyard shipbuilding company in Helsinki, Finland

Arctech Helsinki Shipyard is a Finnish shipbuilding company that is part of the Russian state-owned United Shipbuilding Corporation. The company focuses primarily on icebreakers and other icegoing vessels for arctic conditions.

<i>Vitus Bering</i> (icebreaker) Russian icebreaking platform supply and standby vessel

Vitus Bering is a Russian icebreaking platform supply and standby vessel owned by Sovcomflot. Built by Arctech Helsinki Shipyard in Helsinki, Finland, she and her sister ship, Aleksey Chirikov, were ordered on 16 December 2010, shortly after the joint venture agreement between STX Finland Cruise Oy and United Shipbuilding Corporation had been signed. Delivered to the owners on 21 December 2012, Vitus Bering will be used in the Arkutun-Dagi offshore oil field in the Sea of Okhotsk.

MSV <i>Nordica</i>

MSV Nordica is a Finnish multipurpose icebreaker and offshore support vessel. Built in 1994 by Finnyards in Rauma, Finland and operated by Arctia Offshore, she and her sister ship Fennica were the first Finnish icebreakers designed to be used as escort icebreakers in the Baltic Sea during the winter months and in offshore construction projects during the open water season.

<i>Voima</i> (1952 icebreaker)

Voima is a Finnish state-owned icebreaker. Built by Wärtsilä Hietalahti shipyard in Helsinki in 1954, she was the first icebreaker in the world to be equipped with two bow propellers and generated widespread publicity that helped the Finnish shipbuilding industry to become the world leader in icebreaker design.

Oblique icebreaker Icebreaker designed which can break ice obliquely to open a wide channel

An oblique icebreaker is a special type of icebreaker designed to operate not only ahead and astern, but also obliquely (sideways) with a large angle of attack. In this way, a relatively small icebreaker is capable of opening a wide channel in ice for large merchant ships.

<i>Otso</i> (icebreaker) Finnish icebreaker

Otso is a Finnish state-owned icebreaker. Built by Wärtsilä Helsinki shipyard in 1986 to replace the aging Karhu-class icebreakers, she was the first Finnish post-war icebreaker to be built without bow propellers. Otso has an identical sister ship, Kontio, which was delivered in 1987.

Aleksey Chirikov is a Russian icebreaking platform supply and standby vessel owned by Sovcomflot. She and her sister ship, Vitus Bering, were ordered on 16 December 2010 from Arctech Helsinki Shipyard in Helsinki, Finland, shortly after the joint venture agreement between STX Finland Cruise Oy and United Shipbuilding Corporation had been signed. Aleksey Chirikov was delivered on 19 April 2013. She will be used in the Arkutun-Dagi offshore oil field in the Sea of Okhotsk.

<i>Baltika</i> (icebreaker) Russian icebreaker

Baltika is a Russian icebreaker built by Arctech Helsinki Shipyard in Helsinki, Finland. She is the first ship ever built with an asymmetric hull that allows her to operate not only ahead and astern, but also obliquely (sideways) with a large angle of attack. In this way, the relatively small oblique icebreaker is capable of opening a wide channel in ice for large merchant ships.

<i>Polaris</i> (icebreaker) Finnish icebreaker

Polaris is a Finnish icebreaker. Built in 2016 by Arctech Helsinki Shipyard, she is the most powerful icebreaker ever to fly the Finnish flag and the first icebreaker in the world to feature environmentally friendly dual-fuel engines capable of using both low-sulfur marine diesel oil (LSMDO) and liquefied natural gas (LNG). Polaris was initially ordered by the Finnish Transport Agency, but the ownership was transferred to the state-owned icebreaker operator Arctia after delivery.

Project 21900 icebreaker Russian icebreakers

Project 21900 icebreakers and their derivative designs are a series of Russian diesel-electric icebreakers built in the 2000s. They are also sometimes referred to using the type size series designation LK-16.

Vyborg Shipyard

Vyborg Shipyard PJSC is a shipbuilding company located in Vyborg, Russia. The company has a focus on icebreakers and other icegoing vessels for arctic conditions, but the company has also built deep sea semi-submersible floating drilling and production platforms for exploration of oil and gas offshore fields. Vyborg Shipyard employs more than 1,500 people.

<i>Moskva</i> (2007 icebreaker) Russian icebreaker

Moskva is a Russian Project 21900 diesel-electric icebreaker. Built at Baltic Shipyard in 2008, she was the first non-nuclear-powered icebreaker built in Russia after the dissolution of the Soviet Union.

<i>Sankt-Peterburg</i> (icebreaker) Russian icebreaker

Sankt-Peterburg is a Russian diesel-electric icebreaker. She was built at Baltic Shipyard in 2009 as the second vessel for Project 21900, the first series of non-nuclear icebreakers built in Russia after the dissolution of the Soviet Union. She has an identical sister ship, the 2008-built Moskva.

<i>Murmansk</i> (2015 icebreaker) Russian icebreaker

Murmansk is a Russian Project 21900M diesel-electric icebreaker. While her construction was contracted to Vyborg Shipyard in Russia, she was built at Arctech Helsinki Shipyard in Finland and delivered to Rosmorport in 2016.

<i>Novorossiysk</i> (icebreaker) Russian icebreaker

Novorossiysk is a Russian Project 21900M diesel-electric icebreaker. She was built by Vyborg Shipyard in Russia and delivered to Rosmorport in 2016.

<i>Vladivostok</i> (2014 icebreaker) Russian icebreaker

Vladivostok is a Russian diesel-electric icebreaker and the lead ship of Project 21900M icebreakers. She was built by Vyborg Shipyard in Russia and delivered to Rosmorport in 2015.

References

  1. 1 2 3 "Yuriy Kuchiev (9804033)" . Equasis. French Ministry for Transport . Retrieved 2018-09-15.
  2. 1 2 The construction of icebreaking tanker begun. Arctech Helsinki Shipyard, 28 July 2017. Retrieved2018-09-15.
  3. 1 2 @ArctechH (20 July 2018). "Our Croatian subcontractor launched on July 16 the bow of icebreaking arctic tanker. The aft of the tanker is under construction in Helsinki at ArctechH. The vessel measures 229 m in length and 32,5 m in breadth. After the launch the bow will be transported to Helsinki" (Tweet) via Twitter.
  4. 1 2 NB 515 launched at Arctech Helsinki Shipyard. Arctech Helsinki Shipyard, 8 January 2019. Retrieved2019-01-09.
  5. 1 2 @HelsinkiOy (28 August 2019). "Today we had at the shipyard naming ceremony and delivery of the Arctic Tanker Yuriy Kuchiev. The weather could not have been better! Tomorrow free space for new orders to come..." (Tweet) via Twitter.
  6. 1 2 3 4 5 6 Kajosaari, Markku (2018), "New type condensate tanker for arctic operation", in Kujala, P.; Lu, L. (eds.), Marine Design XIII: Proceedings of the 13th International Marine Design Conference (IMDC 2018), June 10-14, 2018, Helsinki, Finland, 1, Taylor & Francis Group, pp. 77–82, ISBN   978-1-138-34069-5
  7. Dynacom scoops contract for Yamal LNG condensate carriers. TradeWinds. Retrieved2016-02-24.(subscription required)
  8. Dynacom selects shipbuilders for condensate carriers. Korea Marine Equipment. 27 January 2016. Retrieved2016-02-24.
  9. Todellinen yllätystoimitus Venäjälle - Helsingin telakka aloittaa tankkerien teon. Tekniikka & Talous, 2 March 2016. Retrieved2016-03-03.
  10. Sea Transportation Solutions for Arctic Logistic Needs (Archived August 6, 2016, at the Wayback Machine ). Esko Mustamäki, Arctech Helsinki Shipyard. Retrieved2016-07-21.
  11. Croatia's Brodotrogir starts building tanker icebreaker for Arctech Helsinki Shipyard. SeeNews, 8 February 2017. Retrieved2017-02-09.
  12. Arctech Helsinki Shipyard is building the Arctic Icebreaking Tanker. Arctech Helsinki Shipyard, 30 August 2018. Retrieved2018-09-15.
  13. Halpa myyntihinta tuo toivoa Helsingin telakalle – konsultit etsivät ostajia naapurimaista. Kauppalehti, 14 March 2019. Retrieved2019-03-14.
  14. "We are making preparations for the Inclining test of the Arctic Tanker NB 515". Arctech Helsinki Shipyard. 29 April 2019. Retrieved 1 May 2019.
  15. @ArctechH (7 May 2019). "Last night the Arctic Tanker NB 515 left for the Sea Trials. The vessel was floated out in the end of April and during this week we made preparations for the Sea trials, including the Inclining test" (Tweet) via Twitter.
  16. Anniversary voyage to North Pole bears testimony of a changing Arctic. The Barents Observer, 14 August 2017. Retrieved2018-09-15.
  17. "Helsingin telakan kauppa sinetöity –  uusi venäläisomistaja uskoo pakoteasian ratkenneen". Taloussanomat (in Finnish). Sanoma Media. 20 May 2019. Retrieved 20 May 2019.
  18. Rules for the Classification and Construction of Sea-Going Ships Part I: Classification. Russian Maritime Register of Shipping, 2018.