MV Tazlina

Last updated
Tazlina Auke B 714.jpg
MV Tazlina
History
Flag of the United States.svgUnited States
NameTazlina
Namesake Tazlina Glacier
OperatorAlaska Marine Highway System
Port of registryValdez, Alaska
OrderedOctober 16, 2014
BuilderVigor Alaska
Laid downDecember 13, 2014
LaunchedMay 16, 2018
ChristenedAugust 11, 2018
Maiden voyageMay 7, 2019
Identification
General characteristics
Tonnage5,304  GT
Displacement3,016 long tons (3,064  t)
Length280 ft (85 m)
Beam67 ft (20 m)
Draft13 ft 11 in (4.24 m)
Decks
  • One vehicle deck
  • One passenger deck
RampsBow, port, and aft ro-ro loading
Installed power2 x 12-710G7CT3 EMD diesel engines
Propulsion2 x 4-bladed variable-pitch propellers
Speed16.5 knots (30.6 km/h; 19.0 mph)
Capacity
  • 300 passengers
  • 53 vehicles

MV Tazlina is a ferry operated by the Alaska Marine Highway System. It began serving Southeast Alaska Communities in 2019.

Contents

Background

In late 2006, the Alaska Marine Highway System began a study for a new Lynn Canal ferry. A number of different concepts were explored over the years and succeeding governors had different ideas for new ferries. In 2010 the Alaska legislature appropriated $60 million for the first "Alaska"-class ferry. This was to be matched by $68 million of federal funding. Later in 2010 Governor Sean Parnell made the decision to forgo any federal funding of the ferry, opting instead to give the contract to an Alaskan firm in order to bring jobs to the state and stimulate the local shipbuilding industry. [1] The legislature backed the governor, appropriating an additional $60 million for the ferry in 2011 to make up for lost federal funding. [2] In April 2012 the Alaska Department of Transportation contracted with Alaska Ship and Drydock, later acquired by Vigor Industrial, [3] to assist in the design of the ship with the expectation that it would bid on its construction at the shipyard it managed in Ketchikan. [4]

By the end of 2012 cost estimates for the proposed 350 feet (110 m) vessel significantly exceeded the $120 million that had been appropriated. [4] Governor Parnell ordered a halt to the project and redirected the effort towards two smaller, cheaper day-use vessels. [5] The Elliott Bay Design Group of Seattle, Washington [6] delivered a preliminary design study for the smaller day boat Alaska-class ferries in the summer of 2013 and a final design in 2014. Based on this design, a request for proposal was sent to Vigor Alaska on August 1, 2014. Negotiations between the state and Vigor resulted in a contract signing on October 16, 2014, for the construction of two ferries for a guaranteed maximum price of $101,513,651. [7]

Description

Tazlina is 280 feet (85 m) long, with a beam of 67 feet (20 m), and a full-load draft of 13 ft 11 in (4.24 m). The hull is constructed of welded steel plates. It displaces 3,016 long tons (3,064  t ). Its gross tonnage under international rules is 5,304, while its U.S. gross register tonnage is 3,217. [8] It has vehicle loading doors in the transom, bow, and port side to accommodate different port configurations.

Stern loading on MV Tazlina Tazlina stern loading deck 437.jpg
Stern loading on MV Tazlina

At a cruising speed of 16.5 knots (30.6 km/h; 19.0 mph), it burns 250 gallons of diesel fuel per hour, and its maximum speed is 17.9 knots (33.2 km/h; 20.6 mph). It has two Electro-Motive Diesel 12-710G7CT3 engines which produce 3,000 brake horsepower (2,200  kW ) each. They drive two four-bladed variable-pitch propellers which are 8.5 feet (2.6 m) in diameter. The ship also has a bow thruster. Electrical power on the ship is provided by three Caterpillar C-18 generators capable for producing 500 kW (670 hp) each. [9] The ship's tanks hold 49,900 US gallons (189,000 l) of diesel fuel and 18,000 US gallons (68,000 l) of potable water. [10] [11]

The ship's vehicle deck has 850 feet (260 m) of lanes, which can accommodate 53 standard-sized vehicles. Its single passenger deck has a capacity of 300 passengers, and is equipped with a cafeteria, solarium, quiet room, and children's play area. Tazlina was built as a day boat, so it has no crew quarters for overnight accommodation or passenger staterooms. It normally carries a crew of 14. [8]

Construction and career

Tazlina's keel was laid in a ceremony attended by Governor Bill Walker on December 13, 2014. [12] The vessel was built as 23 prefabricated modules that were assembled into the ship. It was the first Alaska-class ferry and the largest vessel ever built in the state. [12] It was launched on May 16, 2018, with little fanfare. [13] The public ceremony came on August 11, 2018, when Tazlina was christened in Ketchikan by former Alaska First Lady Donna Walker. [14]

All Alaska Marine Highway Ferries are named after glaciers. Tazlina's namesake is the Tazlina glacier. The name was selected in 2016 through an essay contest for Alaskan school children. Seventh-grader Malea Voran of Port Alsworth nominated Tazlina because it is an Athabaskan word for "swift river", which she thought appropriate for the ferry. [15]

Operating history

Tazlina made its maiden voyage on May 7, 2019, from Juneau to Haines. Its regular schedule during the 2019 summer season was to sail from Juneau to Haines, then to Skagway, and then back to Haines (where it docked for the night), returning to Juneau the next day. It was scheduled to complete this round-trip three times a week, replacing the MV Fairweather on this route. [16]

Tazlina and the rest of the Alaska Marine Highway System were idled when ferry workers struck on July 24, 2019. A settlement was reach and it returned to service on August 4, 2019. [17] [18] It was idled again at the end of the summer season but returned to service in Lynn Canal on November 22, 2019, as a replacement for two ferries with maintenance issues. [19] Tazlina was idled again in mid-January for repairs and warranty work, returning to service on March 5, 2020. [20]

The cost of Tazlina's overnight crew accommodations in Haines during the summer 2019 season exceeded budget by $400,000. [21] This overnight stop arose from U.S. Coast Guard regulations restricting ship crews to no more than a 12-hour shift, Tazlina's service speed, and its lack of crew accommodations. The Alaska Marine Highway System proposed to retrofit crew quarters into Tazlina and Hubbard. This would allow them to complete longer routes, but at a cost of over $30 million. [22] The legislature appropriated almost $17 million to retrofit one of the ships, but Governor Mike Dunleavy vetoed the appropriation in April 2020. [23] Instead, the ship was scheduled for separate Juneau-Skagway and Juneau-Haines roundtrips during the summer of 2020. [24]

In the face of state budget cuts and reduced ridership due to the Covid-19 pandemic, Tazlina did not sail during the summer 2020 season. [25] As of August 2020, Tazlina remained idle, moored at the Auke Bay ferry terminal. [26]

Related Research Articles

<span class="mw-page-title-main">Southeast Alaska</span> Region of Alaska

Southeast Alaska, colloquially referred to as the Alaska(n) Panhandle, is the southeastern portion of the U.S. state of Alaska, bordered to the east and north by the northern half of the Canadian province of British Columbia. The majority of Southeast Alaska's area is part of the Tongass National Forest, the United States' largest national forest. In many places, the international border runs along the crest of the Boundary Ranges of the Coast Mountains. The region is noted for its scenery and mild, rainy climate.

<span class="mw-page-title-main">Juneau, Alaska</span> Capital city of Alaska, United States

The City and Borough of Juneau, more commonly known simply as Juneau, is the capital city of the state of Alaska. Located in the Gastineau Channel and the Alaskan panhandle, it is a unified municipality and the second-largest city in the United States by area. Juneau was named the capital of Alaska in 1906, when the government of what was then the District of Alaska was moved from Sitka as dictated by the U.S. Congress in 1900. The municipality unified on July 1, 1970, when the city of Juneau merged with the city of Douglas and the surrounding Greater Juneau Borough to form the current municipality, which is larger by area than both Rhode Island and Delaware.

<span class="mw-page-title-main">University of Alaska Southeast</span> Public, four year university in Juneau, Alaska

The University of Alaska Southeast is a public university with its main campus in Juneau, Alaska and extended campuses in Sitka and Ketchikan. It is part of the University of Alaska System and was established on July 1, 1987, with the restructuring and consolidation of the former University of Alaska Juneau, Ketchikan Community College, and Islands Community College (Sitka). The university is accredited by the Northwest Commission on Colleges and Universities.

<span class="mw-page-title-main">Alaska Marine Highway</span> Ferry system serving the U.S. state of Alaska

The Alaska Marine Highway (AMH) or the Alaska Marine Highway System (AMHS) is a ferry service operated by the U.S. state of Alaska. It has its headquarters in Ketchikan, Alaska.

MV <i>Taku</i>

M/V Taku is a Malaspina-class mainline vessel built for the Alaska Marine Highway System. The ship has been retired and was sold to a Dubai-based company for $171,000. The owner sought to sell the ferry internationally, and was unsuccessful, and it was last seen beached in Alang, India, to be scrapped.

MV <i>LeConte</i>

MV LeConte is a feeder vessel for the Alaska Marine Highway System, built in Sturgeon Bay, Wisconsin in 1973 and commissioned in 1974 by Alaska's ferry system. LeConte is the older sister ship to M/V Aurora, and both serve as feeder vessels that pick up passengers in small communities such as Hoonah and take them to larger regional communities.

MV <i>Chenega</i>

M/V Chenega is a catamaran ferry built by Derecktor Shipyards in Bridgeport, Connecticut for the Alaska Marine Highway System entering service 2005. After being laid up in 2017, in March 2021 it was sold by the Alaska Department of Transportation & Public Facilities to Servicios y Concesiones Maritimas Ibicencas along with sister ship MV Fairweather for service between Spain and Ibiza.

MV <i>Fairweather</i>

MV Fairweather is a catamaran ferry built by Derecktor Shipyards in Bridgeport, Connecticut for the Alaska Marine Highway System entering service 2004. After being laid up since 2019, in March 2021 it was sold to Servicios y Concesiones Maritimas Ibicencas for service between Mallorca and Menorca.

MV <i>Malaspina</i>

MV Malaspina, colloquially known as the Mal, is a mainline ROPAX ferry and the original Malaspina-class vessel for the Alaska Marine Highway System. Malaspina is named after the Malaspina Glacier, which, in turn, is named after Captain Don Alessandro Malaspina, Italian navigator and explorer who explored the northwest coast of North America in 1791. Malaspina is nearly identical to her sister ship, MV Matanuska.

MV <i>Matanuska</i>

MV Matanuska, colloquially known as the Mat, is a mainline Malaspina-class ferry vessel operated by the Alaska Marine Highway System.

MV <i>Columbia</i>

The M/V Columbia is a mainline ferry vessel for the Alaska Marine Highway System.

MV <i>Lituya</i>

MV Lituya is a shuttle ferry operated by the Alaska Marine Highway System. Her route connects Metlakatla on Annette Island to Ketchikan.

MV <i>Prince of Wales</i>

M/V Prince of Wales is a ferry operated by the Inter-Island Ferry Authority. She serves as a replacement for her sister ship, M/V Stikine, when she is out of service for maintenance. Her route is from Ketchikan to Hollis in Southeast Alaska.

MV <i>Stikine</i>

M/V Stikine is a ferry operated by the Inter-Island Ferry Authority. Her regular route is between Ketchikan and Hollis, in Southeast Alaska.

<span class="mw-page-title-main">Lynn Canal Highway</span>

The Lynn Canal Highway, or Juneau Access Road, is a proposed road between Skagway and City and Borough of Juneau, the capital of the U.S. state of Alaska. Such a road, if built, would still require ferry access to connect Juneau to the Alaskan highway network. The new road would be 47.9 miles long, built at a cost of $574 million, and be a part of Alaska Route 7. The plan of the Alaska Department of Transportation & Public Facilities (DOT&PF) called for extending "The Road" northward from Juneau to a ferry terminal 18 miles south of Skagway. The corridor crosses Berners Bay LUD II which is a congressionally designated roadless area created by the Tongass Timber Reform Act (TTRA). The act permits crossing LUD IIs when the governor of the State of Alaska designates routes as essential transportation corridors. The proposed road skirts the shore of a northwestern section of Alaska's Inside Passage, which was recently named a National Scenic Waterway. As of 2017, the project has been indefinitely shelved due to the state's budget crisis.

MV <i>Wickersham</i>

The MV Wickersham was a mainline ferry vessel for the Alaska Marine Highway. Wickersham was the second vessel, after the MV Chilkat, in the Alaska Marine Highway fleet to not have been constructed specifically for AMHS, but was rather acquired for from the Stena Line, where it was known as the Stena Britannica and served the Kiel, Germany–Gothenburg, Sweden route. Constructed just one year prior to its purchase by AMHS in April 1968, her arrival and status as an "oceangoing" vessel allowed AMHS to expand the southern terminus of its route system south to Washington and the Port of Seattle.

The Alaska Department of Transportation & Public Facilities (DOT&PF) is a department within the government of Alaska. Its headquarters are in Alaska's capital city, Juneau. The mission of Alaska DOT&PF is to "Keep Alaska Moving through service and infrastructure."

USCGC <i>Liberty</i> (WPB-1334) U.S. Coast Guard vessel

USCGC Liberty (WPB-1334) is an Island-class cutter of the United States Coast Guard. She spent her first 33 years of service homeported in Juneau, Alaska where she patrolled territorial waters, including the Inside Passage. In 2016 she won the Hopley Yeaton Cutter Excellence Award for outstanding operational and humanitarian achievements. In 2022 she was reassigned to Valdez, Alaska.

USCGC <i>Sweetbrier</i> (WLB-405)

The USCGC Sweetbrier (WAGL-405/WLB-405) was an Iris-class 180-foot seagoing buoy tender operated by the United States Coast Guard. She served in the Pacific during World War II. Her entire post-war career with the Coast Guard was spent in Alaska. After she was decommissioned in 2001, she was transferred to the Ghana Navy and renamed Bonsu. She is still active.

References

  1. "Build Them Here". Fairbanks Daily News-Miner. May 23, 2010.
  2. Alaska Marine Highway System - Alaska Class Ferry (PDF). State of Alaska. 2011.
  3. Miller, Tom (February 12, 2012). "Oregon company to manage Ketchikan Shipyard operations". Bellingham Herald.
  4. 1 2 Alaska Class Ferry: Project Overview and Change in Direction (PDF). Alaska Department of Transportation & Public Facilities. 2012.
  5. Schoenfeld, Ed (December 14, 2012). "SE Legislators Upset with Gov's Ferry Plan". Sitka Daily Sentinel.
  6. "Elliott Bay Design Group | projects | ferry design". Elliott Bay Design Group. Retrieved 2020-08-07.
  7. AMHS Terminal/Vessel Updates 9/15/15 (PDF). Sitka, Alaska: City of Sitka. 2015.
  8. 1 2 Vessel Information Table (PDF). Alaska Marine Highway System.
  9. seamarsh (2018-10-15). "Tazlina is First AMHS Ferry Built in Alaska". Marsh's Maritime Media. Retrieved 2020-08-07.
  10. "Day Boat Alaska Class Ferries - Tazlina". Vigor. Retrieved 2020-08-07.
  11. "TAZLINA: Alaskan ferry designed for optimal performance in heavy seas" (PDF). Significant Small Ships of 2019. The Royal Institution of Naval Architects: 74–75.
  12. 1 2 "Two state ferries under construction in Ketchikan". Fairbanks Daily News-Miner. December 14, 2014.
  13. "Ketchikan Shipyard". www.aidea.org. Retrieved 2020-08-07.
  14. Kheiry, Leila (2018-08-13). "Tazlina christened at Ketchikan shipyard". KRBD. Retrieved 2020-08-07.
  15. "Tazlina, Hubbard Names Picked For New Ferry". Sitka Daily Sentinel. May 18, 2016.
  16. "Newest Alaska Ferry Ready for Day Trips". Daily Sitka Sentinel. May 6, 2019.
  17. Thiessen, Mark (August 2, 2019). "Ferry Worked Union, State Find Agreement". Sitka Daily Sentinel.
  18. Downing, Suzanne (2019-08-04). "Breaking: IBU ratifies deal, ferry strike is over". Must Read Alaska. Retrieved 2020-08-10.
  19. Armstrong, Leigh (December 4, 2019). "Extra ferries serving city to last until Jan. 5, 2020". Whitehorse Daily Star.
  20. Staff, Alaska Native News (2020-03-04). "AMHS Vessel M/V Tazlina will Return to Scheduled Service on March 5th". Alaska Native News. Retrieved 2020-08-10.
  21. "Alaska State Legislature". www.akleg.gov. Retrieved 2020-08-10.
  22. "Ferries need $30 million in work before entering service". Whitehorse Daily Star. January 25, 2019.
  23. Resneck, Jacob (2020-04-08). "Veto-wielding Alaska governor slashes ferry budget". KRBD. Retrieved 2020-08-10.
  24. Angelus, Aly De (2020-01-28). "Draft summer ferry schedule proposes further reduction in service". The Skagway News. Retrieved 2020-08-10.
  25. McCormack, Peggy (May 29, 2020). "Four state ferries to return to service". KTUU. Retrieved 2020-08-10.
  26. "Fleet Status | Alaska Marine Highway System". dot.alaska.gov. Retrieved 2020-08-10.