Nuclear power in Uruguay

Last updated

The use of nuclear energy in Uruguay is prohibited by law 16.832 of 1997. [1] Despite this, the country has several institutions that regulate its use, such as the Center for Nuclear Research (Centro de Investigaciones Nucleares) or the National Regulation Authority on Radiological Protection (Autoridad Reguladora Nacional en Radioprotección).

Contents

Furthermore, for several years Uruguay had a small nuclear reactor for research and personnel training. It was brought from the United States in 1964 and began to work in the building of the Center for Nuclear Research in Malvin Norte in 1978. [2] It was turned off because of the detection of corrosion in 1985 and all nuclear fuel was removed. A year later, the Chernobyl and Goiânia nuclear accidents occurred. This influenced public opinion, and in 1988 —during the first presidency of Julio Maria Sanguinetti— a cooperation agreement of nuclear energy between Uruguay and Canada was signed, in which they planned the construction of a nuclear plant in the city of Paso de los Toros. [3] The announcement caused a social unrest and it was decided to open a debate on nuclear energy. [3] As a result, the Parliament did not ratify the agreement, and they passed the aforementioned law prohibiting nuclear energy in the country. [3]

The energy crisis in Uruguay in 2007 led to Uruguay reopening the nuclear debate under the presidency of Tabaré Vázquez, when the Executive Branch established a multiparty committee devoted to the study of the use of nuclear energy to generate electricity and the installation of a nuclear power plant. [4] The Fukushima accident stimulated the discussions of different scopes, especially political and social. In July 2011 the government announced that Uruguay was soon to enter Phase 1 of an evaluation of nuclear energy, [lower-alpha 1] providing 10 million Uruguayan pesos from the national budget to hire specialist advisers, consulting the population and reviewing the human resources and technology available.

Institutions

National Regulation Authority on Radiological Protection

The National Regulation Authority on Radiological Protection depends on the Ministry of Industry, Energy and Mining. It was created by articles 173 and 174 of Law 17930 of December 19, 2005. [7] It is the only one in Uruguay controlling emissions of ionizing radiations. It has technical and professional independence and is not linked to any institution related to nuclear energy except those that control the safety of who are exposed to emissions. [8]

National Atomic Energy Commission

Since Law 15809 (article 342) created by the National Office of Nuclear Technology, the National Atomic Energy Commission (Comisión Nacional de Energía Atómica) came to be chaired by the director of the new executive unit, and became committed to advise the Executive on concerning national and international nuclear policy. [9] In January 1996 the Commission was merged with the National Office of Nuclear Technology. [10]

National Office of Nuclear Technology

The National Office of Nuclear Technology (Dirección Nacional de Tecnología Nuclear) was created by Law 15809 (art. 340) in 1986, [9] with the mission to run the subprogram "Promotion of Nuclear Technology" onto the program 012 "Research for Application of Nuclear Energy", which is responsible for planning, coordinating and undertaking advocacy of nuclear technology, acting on the basis of general guidelines established by the National Nuclear Policy.

Centre of Nuclear Research

Centro de Investigaciones Nucleares building. CentroInvNuc05.JPG
Centro de Investigaciones Nucleares building.

The Centre of Nuclear Research (Centro de Investigaciones Nucleares, abbreviated as CIN) was established in 1966 as a multidisciplinary research institute, within the framework of an agreement between the University of the Republic (Udelar) and the National Atomic Energy Commission. [11] [12] [13] [14] With the creation of Udelar's School of Sciences in 1990, the Central Directing Council of the university decided to incorporate the institute within the scope of this school. The CIN is the only infrastructure in the country ready, equipped and which has trained personnel to work and handle radioactive materials. [11] [14]

History

Purchase and installation of a nuclear research reactor

In 1964 the United States government organized, in the US, a conference titled "Atoms for Peace", to which was brought a small low-powered reactor for research purposes. when it concluded, the Uruguayan government offered to buy it from the United States. [2] Therefore, both governments —with the assistance of the International Atomic Energy Agency— signed a leasing agreement in 1965 under which the United States transferred 16049.57 grams of uranium to Uruguay —of which 3182.63 grams were of uranium-235— in order to be used as reactor fuel; and fissile materials consisting of five curie-plutonium-beryllium neutron sources with 79.98 grams of plutonium and two fission counters each containing 1.51 grams of isotope 235U in 1.68 grams of uranium. [15] [16] In a second agreement, the United States transferred a research reactor to Uruguay, and promised to provide technical assistance with installation. [17] In return, Uruguay agreed to pay for the reactor, the fees for the use of nuclear fuel and agreed to not transfer under any circumstances this fuel to third states outside the agreement. [15] [16]

The 100 KW reactor [lower-alpha 2] was originally launched between 1959 and 1962 during the exhibition of the Atomic Energy Commission of the United States to South America, [17] and was settled in Uruguay in the 1970s for educational, research and technical staff training purposes, placed in the building of the Center of Nuclear Research (Malvín Norte). [2] [19] Half of the building was intended for the reactor, manufactured by Lockheed Nuclear Products of Marietta (Georgia), purchased with a state investment of two million Uruguayan pesos of that time, [19] including installation costs. Subsequently, Uruguay invested 20 million Uruguayan pesos from the government budget to construct the building and put it into operation. [20] [21] Law 13640, article 259 established that the reactor was the property of Uruguayan government and remained under the purview of the National Atomic Energy Commission. [20] [22]

This reactor was operational from the late 1970s to 1985, until it was shut down due to corrosion problems; fuel elements were removed from the core and put into dry storage, waiting to be transported to United States. [2] [17] The installation of this facility did not have any public opinion controversies. [23]

Announcement of a nuclear plant

A year after the Goiânia accident and two years after the Chernobyl disaster, [24] Uruguay began talks with Canada during the first presidency of Julio María Sanguinetti which advanced until the signing of a cooperation agreement on nuclear energy between the countries in 1988, [3] [25] a fact not known until the Earth Summit (1992). [2] The agreement was almost ratified in Parliament in 1992, during presidency of Luis Alberto Lacalle. [25] Also, a work group was created, which purpose was to evaluate the possibility of use this way to generate electricity in Uruguay. [26]

Even though the installation of a nuclear power plant was not mentioned in the agreement, the second article of a report - signed by all political parties and elevated to consideration by the House of Representatives at the regular meeting on August 18, 1992 - established that the installation of nuclear power plants that could result from the implementation of article 215 of Law 16.226 based on the agreement, would require approval by law. [27]

The 1992 announcement of the possible construction of a nuclear power plant with loans from the International Atomic Energy Agency in Paso de los Toros caused concern and generated various social movements, [24] [26] which was partially attributed to the proximity of the Chernobyl disaster. [27] Were made mass meetings to inform people about this issue were held in the city of Rivera and the city of Tacuarembó, this latter attended by more than 400 people. Also, the Departmental Board of Artigas made a statement on the matter, and the Local Board of Paso de los Toros declared itself to be against the project. [27] Even children of Paso de los Toros sent letters to senators and representatives of the Uruguayan parliament to vote against the installation of a nuclear power facility. [28] About 6,000 people marched in protest occupying the entire road bridge over the Negro River, [25] [28] joined by people from Montevideo and from other places of the country. [25] These social manifestations were held by the citizens themselves without the participation of political parties. [28] These movements ended with the adoption in 1997 of Law 16.832, containing article 27, which bans the use of nuclear energy in the country. [1] [2]

Law 16.832 and dismantling of the reactor

Starting from entry into force of the law, the CIN reactor was deactivated, dismantled and returned to United States. [20] [23] After that, 1.2 million Uruguayan pesos from national budget of 2001 were assigned for the disassembly of the facilities which housed the reactor and for the management and disposal of radioactive waste generated by past use of the device. [29] Since then, the CIN facilities designed to host it remain empty. [13]

In 2004, Senator Sergio Abreu Bonilla submitted a bill to repeal this law in order to allow an investigation into the feasibility of using nuclear power, but this was unsuccessful. [2]

There was no further mention of the nuclear issue at a national level until 2007, when the Executive branch under presidency of Tabaré Vázquez created a multiparty commission (called the Tribunal Ciudadano) devoted to the study of the use of nuclear energy to generate electricity, [3] [30] following standards recommended by the International Atomic Energy Agency. [4] This reopened the national debate on nuclear power and convenience of installing a nuclear plant due to the country's energy crisis. [12] [31]

New debates

When the issue was reopened, opinions were heard from experts, [32] politicians, [33] media and the military. [34] According to Diva Puig, a consultant in nuclear energy for Latin America of the IAEA, “the discussion about nuclear energy (...) must not exclude any sectors of society”. [32] Justo Laiz, director of CIN, agreed with her, opining that “I do not agree that this issue be discussed only on a political point of view” because “energy issues should be part of scientific discussions and decisions”. [13]

About the possibility of installing a nuclear power plant, Puig said: "Since Uruguay is in the world, I do not see another alternative to produce energy on a large scale". [32] Meanwhile, Laiz said: "A nuclear power plant has many advantages, has zero pollution, but also has a risk, and before taking the decision it should be studied if a country has conditions to provide a system with maximum security. Regarding nuclear energy, no possible risk can be discarded ". [13]

Hinia Balter, director of Centro de Energía Nuclear of Udelar's Sciences School, said that “a reactor would be cover the demand, and perhaps energy could even be sold to neighboring countries (...) A nuclear power plant is by far less polluting than thermal” and radioactive waste produced can be “contained, shielded and securely stored, following certain protocols”. [2]

The process of installing the plant and train personnel could take from 10 to 15 years, and in 2008 had a cost estimated at around 3,500 million Euros. It would require training in diverse fields such as physics and nuclear engineering, lawyers in the field, and a nuclear research reactor for training, like the one used in the 1970s. [32] One of the problem is the total lack of professionals in the area currently available. IAEA helps countries by providing expertise and training if a state decides to create a nuclear power plant with all guarantees. [13]

In 2010, none of the Tribunal Ciudadano's members were in favor of the possibility of launching a nuclear-electric plan from 2030; however, they said that they would accept it if technological advancements minimized the risk associated, or if future studies provided information not currently available. [30] [35] Moreover, in a less populated country such as Uruguay, the aforementioned costs are not profitable at all due to the scale of the local economy. [36] In addition, the growing investment in renewable energies and exploration of the presence of oil in Uruguay have pushed the nuclear debate to the background. According to Ramón Mendez:

Well, it seems pretty clear. For two reasons; firstly, when debate started in 2007-2008, none of this existed. And there was not a policy to 20 years agreed upon by the political parties. We did not know we could be so successful in the production of renewable energy at such competitive prices. So the picture changed. Secondly, Fukushima happened. And there are two important things: first, of the fifty-odd countries in the world who were analyzing the nuclear option, there were only two or three left, and they have not decided. [Some] Countries that were nuclear, are now retiring nuclear energy, such as Germany and many others. But another consequence was, from the investors' perspective, nuclear energy stopped being attractive. It is a high risk, because even though Fukushima has not caused death, that's true, four reactors were worth $20,000 million was rendered useless.

Ramón Méndez, director of Dirección Nacional de Energía y Tecnología Nuclear

Legislation

As early as 1937, there was legislation on the matter in regards to retirement benefits for people who, by nature of their work, must perform tasks that expose them to X-ray or other forms of radiation, or are required to manipulate those elements. [37]

In 1997, Law 16832 – titled "Updating the National Electric System and the creation of the Energy Regulation Unit" – was approved, and in article 27 it established the prohibition of the use of nuclear energy in Uruguay, [1] as follows:

The use of nuclear energy is banned in the country. No agent of the wholesale electricity market may enter into contracts for the supply of electricity with nuclear generators or foreign generators whose plants pollute the country.

Law 19056 about "Radiation Protection and Safety of Persons, Properties and Environment" was also enacted. It intended to establish general parameters for prevention and procedures to "ensure the radiation protection and safety regarding protection of occupationally exposed personnel, to the general public, properties, and the environment, from the adverse effects of radiations, avoiding or minimizing risks and radiation-induced damages, also ensuring the physical protection of the sources and buildings". [38]

In the context of the obligations assumed by the country internationally, Uruguay signed or ratified the following treaties about nuclear energy and related issues:

Near nuclear power plants abroad

Due to its proximity, the government of Uruguay is closely monitoring Atucha I Nuclear Power Plant, located only 70 kilometers from Colonia del Sacramento and 295 km from Montevideo, [47] which began operating in 1974. [48]

Opinion polls

Between October 2010 and March 2011, polling company Factum performed a survey on a sample of the population to assess their agreement or disagreement about the installation of a nuclear power plant in Uruguayan territory and their feeling about these nuclear plants, the first one being in October 2010 (before Fukushima Daiichi nuclear disaster) and the next one being after, in March 2011. [49]

From these, the following data were obtained:

Opinion about the installation of a nuclear plant
before Fukushima I incident after Fukushima I incident
Nuclear power in Uruguay
Nuclear power in Uruguay
Data from Factum

See also

Notes

  1. Phase 1 consists on study on the basis of international workshops and statutes, of the different processes and needs. Only at the end of this technical stage is when the country can formally say whether made the decision to start the nuclear path. [5] [6]
    Phase 2 is the construction of the structure needed to solidify the control unit that is responsible for the safety aspect, building the legal and constitutional framework, begin forming human resources and appropriate technology study. This phase ends with the definition of the facility to be installed in the country and its technology. [5] [6]
    Phase 3 is the purchase of technology, and international negotiations to know what providers would perform with the waste generated by the industry, culminating in the construction of the plant. [5] [6]
    Phase 4 is the beginning of the operation itself of the plant. [6]
  2. There is a discrepancy between information sources cited regarding the power of in KW in the research reactor. In the report of Savannah River National Laboratory (2005) [17] and in the report of the Atomic Energy Commission (USAEC, 1970) [18] was stated the reactor power of 10 KW, while in a contract signed between the United States and Uruguay in 1965, [15] in the D. E. Puig's work «Centrales nucleares en la agenda: Uruguay al día» [19] and in LaRed21's article entitled «Uruguay had a reactor» [20] the power exposed is 100 KW.

Related Research Articles

<span class="mw-page-title-main">Laguna Verde Nuclear Power Station</span> Nuclear generating station in Veracruz, Mexico

The Laguna Verde Nuclear Power Plant (LVNPP) is located on the coast of the Gulf of Mexico, in Alto Lucero, Veracruz, Mexico. It is the only nuclear power plant in Mexico and produces about 4.5% of the country's electrical energy. It consists of two units GE Boiling Water Reactors (BWR-5) each one with installed capacity of 682 MW using low enriched uranium (3%) as fuel. Unit-1 (U-1) started its operation on July 29, 1990. Unit-2 (U-2) started its operation on April 10, 1995. Initial architects in 1975 for the plant were Burns and Roe Inc and later Ebasco Services designed and supervised the project. The steam turbine and other components were manufactured by Mitsubishi Electric. The plant is owned and operated by Comisión Federal de Electricidad (CFE), the national electric company owned by the Mexican government.

<span class="mw-page-title-main">National Atomic Energy Commission</span> Argentine government agency

The National Atomic Energy Commission is the Argentine government agency in charge of nuclear energy research and development.

The Argentine Interconnection System is a wide area synchronous grid that links the regional networks of all Argentinian provinces, with the exception of Tierra del Fuego. It is also connected to the power grids of several neighboring countries.

<span class="mw-page-title-main">INVAP</span>

INVAP S.E. is an Argentine company that provides design, integration, construction and delivery of equipment, plants and devices. The company operates in North America, Europe, Asia Pacific, Latin America, the Middle East and Africa, and delivers projects for nuclear, aerospace, chemical, medical, petroleum and governmental sectors.

The 2006 Argentine nuclear reactivation plan is a project to renew and reactivate the development of nuclear power in Argentina. The main points of the plan were announced by the Argentine government through Planning Minister Julio de Vido during a press conference on 23 August 2006. They include:

The program for nuclear power in Indonesia includes plans to build nuclear reactors in the country for peaceful purposes. Indonesia prohibited development of nuclear weapon or any offensive uses due to signing the Treaty on the Non-Proliferation of Nuclear Weapons on 2 March 1970 and ratified it as Law No. 8/1978 on 18 December 1978.

<span class="mw-page-title-main">Nuclear power in Spain</span>

Spain has five active nuclear power plants with seven reactors producing 21% of the country's electricity as of 2013.

<span class="mw-page-title-main">CIEMAT</span> Spanish public research institution

The Centre for Energy, Environmental and Technological Research (CIEMAT), until 1986 Junta de Energía Nuclear (JEN), is a Spanish public research institution.

<span class="mw-page-title-main">Energy in Uruguay</span>

Energy in Uruguay describes energy and electricity production, consumption and import in Uruguay.

National nuclear energy policy is a national policy concerning some or all aspects of nuclear energy, such as mining for nuclear fuel, extraction and processing of nuclear fuel from the ore, generating electricity by nuclear power, enriching and storing spent nuclear fuel and nuclear fuel reprocessing. Nuclear energy policies often include the regulation of energy use and standards relating to the nuclear fuel cycle.

In Argentina, about 10% of the electricity comes from 3 operational nuclear reactors: Embalse, a CANDU reactor, and Atucha I and II, two PHWR German designs.

<span class="mw-page-title-main">Energy in Spain</span> Overview of the production, consumption, import and export of energy and electricity in Spain

Primary energy consumption in Spain in 2015 was mainly composed of fossil fuels. The largest sources are petroleum (42.3%), natural gas (19.8%) and coal (11.6%). The remaining 26.3% is accounted for by nuclear energy (12%) and different renewable energy sources (14.3%). Domestic production of primary energy includes nuclear (44,8%), solar, wind and geothermal (22,4%), biomass and waste (21,1%), hydropower (7,2%) and fossil (4,5%).

<span class="mw-page-title-main">Gregorio Baro</span> Argentine chemist (1928–2012)

Gregorio Baró was an Argentine scientist. He was born in Santiago Temple, Córdoba and died in Buenos Aires.

The Uruguayan savanna ecoregion used to be covered by grasslands, palm savannas, and gallery forests along the Uruguay, Negro, Yaguarí, Queguay, and Tacuarembó rivers. Unfortunately, agriculture and cattle ranching have heavily altered these natural communities. The savannas are critically endangered because there are few small isolated patches of intact habitat remaining. The whole ecoregion has been severely altered by cattle ranching, one of the main pillars of the national economy in Uruguay. About 80% of Uruguayan territory is used for cattle ranching on natural and artificial savannas.

<span class="mw-page-title-main">Atucha Nuclear Power Plant</span> Nuclear generating complex in Argentina

The Atucha Nuclear Complex, or Atucha Nuclear Power Plant, is the location for two adjacent nuclear power plants in Lima, Zárate, Buenos Aires Province, about 100 kilometres (60 mi) from Buenos Aires, on the right-hand shore of the Paraná de las Palmas River. Both are pressurized heavy-water reactors (PHWR) employing a mixture of natural uranium and enriched uranium, and use heavy water for cooling and neutron moderation.

Renewable energy in Chile is classified as Conventional and Non Conventional Renewable Energy (NCRE), and includes biomass, hydro-power, geothermal, wind and solar among other energy sources. Most of the time, when referring to Renewable Energy in Chile, it will be the Non Conventional kind.

<span class="mw-page-title-main">Renewable energy in Costa Rica</span> Overview of the use of renewable energy in Costa Rica

Renewable energy in Costa Rica supplied about 98.1% of the electrical energy output for the entire nation in 2016. Fossil fuel energy consumption in Costa Rica was 49.48 as of 2014, with demand for oil increasing in recent years. In 2014, 99% of its electrical energy was derived from renewable energy sources, about 80% of which from hydroelectric power. For the first 75 days of 2015, 100% of its electrical energy was derived from renewable energy sources and in mid 2016 that feat was accomplished for 110 consecutive days despite suboptimal weather conditions.

<span class="mw-page-title-main">RV-1 nuclear reactor</span>

The RV-1 nuclear reactor, now repurposed and known as Gamma rays sterilization plant, is a facility located in Altos Mirandinos, Miranda, Venezuela. It was the only nuclear reactor in Venezuela and one of the first reactors in Latin America. Currently, it is used as a gamma ray facility for microbiological sterilization of surgical supplies, packaging, medicine and dry food.

<span class="mw-page-title-main">Rafael Grossi</span> Argentine diplomat

Rafael Mariano Grossi is an Argentine diplomat. He is serving as Director General of the International Atomic Energy Agency (IAEA) since December 3, 2019. He was formerly the Argentine Ambassador to Austria, concurrent with Slovenia, Slovakia and International Organisations based in Vienna (2013–2019).

References

  1. 1 2 3 "Law 16.832: Actualización del Sistema Eléctrico Nacional y creación de la Unidad Reguladora de la Energía" (in Spanish). Parliament of Uruguay. June 27, 1997. Archived from the original on February 26, 2014. Retrieved November 7, 2013.
  2. 1 2 3 4 5 6 7 8 "Uruguay campeón nuclear en 2017". Qué Pasa (in Spanish). El País. November 4, 2006. Retrieved November 9, 2013.
  3. 1 2 3 4 5 Honty, Gerardo (July 2011). "Energía nuclear en América Latina: el día después" (PDF). Nueva Sociedad (in Spanish) (234): 39. ISSN   0251-3552. Archived from the original (PDF) on 2014-09-29. Retrieved 2014-05-02.
  4. 1 2 Arguello, Irma (2010). "Nuclear Energy in Latin America: Between Economic Development and Proliferation Risks". Security Index: A Russian Journal on International Security. 16 (4): 76. doi:10.1080/19934270.2010.525889. ISSN   2151-7495.
  5. 1 2 3 International Atomic Energy Agency (September 2007). MILESTONES IN THE DEVELOPMENT OF A NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER (PDF). ISBN   978-92-0-107707-3. ISSN   1995-7807.
  6. 1 2 3 4 "Energía nuclear en Uruguay, entre la seriedad y la fantasía" (in Spanish). UyPress. March 15, 2010. Archived from the original on May 2, 2014. Retrieved May 2, 2014.
  7. Parliament of Uruguay (December 23, 2005). "Law 17.930: Presupuesto Nacional 2005 - 2009" (in Spanish). Archived from the original on February 18, 2014. Retrieved November 13, 2013.
  8. "Ley de radioprotección" (PDF) (in Spanish). May 2012. Archived from the original (PDF) on March 3, 2014. Retrieved November 13, 2013.
  9. 1 2 "Law 15.809, article 340" (in Spanish). Parliament of Uruguay. December 23, 2005. Archived from the original on December 26, 2013. Retrieved November 13, 2013.
  10. "Law 16.736: Presupuesto Nacional (article 297)" (in Spanish). Parliament of Uruguay. January 5, 1996. Archived from the original on November 5, 2013. Retrieved November 9, 2013.
  11. 1 2 Centro de Investigaciones Nucleares. "Quiénes somos - Historia del CIN" (in Spanish). Retrieved November 11, 2013.
  12. 1 2 "Uruguay reabre el debate luego de la tragedia en Japón" (in Spanish). LaRed21. October 31, 2011. Retrieved November 12, 2013.
  13. 1 2 3 4 5 Fassanello, Daniela (March 20, 2011). "Energía nuclear: se reabre el debate luego de la tragedia en Japón" (in Spanish). LaRed21. Retrieved December 4, 2013.
  14. 1 2 González Sprinberg, Gabriel; Rabin Lema, Carolina; et al. (2011). Para entender las radiaciones (PDF) (in Spanish). DIRAC – Facultad de Ciencias, Universidad de la República. pp. 74–75. ISBN   978-9974-0-0720-8.
  15. 1 2 3 "Instruments connected with the Agency's assistance to Uruguay in establishing a research reactor project" (PDF). International Atomic Energy Agency. December 9, 1965. Archived from the original (PDF) on October 29, 2015. Retrieved November 20, 2013.
  16. 1 2 "Law 14.026: Se aprueban acuerdos suscritos con el Organismo Interamericano de Energía Atómica sobre Arrendamiento de Uranio y Asistencia para la Ejecución de un Proyecto Relativo a un Reactor" (in Spanish). Parlamento de Uruguay. September 23, 1971. Archived from the original on March 4, 2016. Retrieved May 20, 2014.
  17. 1 2 3 4 Vormelker, Philip R.; Vinson, Dennis W. (September 2005). "FY04 Inspection Results for Wet Uruguay Fuel in L-Basin (U)" (PDF). Savannah River National Laboratory. p. 9. Retrieved November 20, 2013.
  18. "Nuclear reactors, built, being built or planned in the United States as of June 30, 1970". United States Atomic Energy Commission. October 31, 1970. doi: 10.2172/4115425 . OSTI   4115425.{{cite journal}}: Cite journal requires |journal= (help)
  19. 1 2 3 Puig 2008, p. 95: «Fue un reactor de investigación y formación profesional de 100 KW construido en la empresa Lockheed Nuclear Products de EEUU y Uruguay estuvo sometido a las salvaguardias del OIEA, hasta que se fue el combustible del mismo, luego de desmantelado.».
  20. 1 2 3 4 "Uruguay tuvo un reactor" (in Spanish). LaRed21. November 17, 2008. Retrieved November 8, 2013.
  21. "Law 13.349: Rendición de cuentas de 1963" (in Spanish). Parliament of Uruguay. July 1, 1968. Archived from the original on September 24, 2015. Retrieved November 8, 2013.
  22. "Law 13.640: Presupuesto Nacional de Sueldos, Gastos e Inversiones" (in Spanish). Montevideo: Parliament of Uruguay. December 26, 1967. Archived from the original on December 26, 2013. Retrieved November 8, 2013.
  23. 1 2 Puig 2008, p. 95: «El reactor fue cerrado, desmantelado y el uranio devuelto a EEUU en el año 1998, siguiendo todas las normas internacionales al respecto.»
    «La instalación de este reactor de investigación no tuvo ningún efecto en la opinión pública: aún no habían ocurrido los grandes accidentes.».
  24. 1 2 Vaz, Gabriela (July 24, 2005). "Nueva era nuclear". El País (in Spanish). Retrieved November 9, 2013.
  25. 1 2 3 4 Renfrew, Daniel (2007). "3: "La Teja Shall Sing": Workers, Children, and the Rise of Grassroots Environmentalism in Uruguay" (e-book). In ProQuest (ed.). "We are All Contaminated": Lead Poisoning and Urban Environmental Politics in Uruguay. p. 117; 381. ISBN   9780549158141 . Retrieved November 12, 2013.
  26. 1 2 Puig 2008, pp. 93–94: «Por resolución 535 del 5 de agosto de 1992 se creó un grupo de trabajo, con el cometido de desarrollar un plan para considerar las posibilidades de la generación de energía por tecnología nuclear para el Uruguay. Ese proyecto fracasó, fundamentalmente por enfrentarse con una opinión pública contraria. Faltó información y divulgación.».
  27. 1 2 3 "29ª Sesión ordinaria del 11 de agosto de 1992" (in Spanish). Parliament of Uruguay. August 11, 1992. Archived from the original on September 24, 2015. Retrieved November 12, 2013.
  28. 1 2 3 Santandreu, Alain; Gudynas, Eduardo (1998). "6: La dinámica de los conflictos ambientales". Ciudadanía en movimiento: participación y conflictos ambientales (in Spanish). Ediciones Trilce. pp. 70–71. ISBN   9789974321991 . Retrieved November 12, 2013.
  29. "Law 17.296: Presupuesto del 2001" (in Spanish). Parliament of Uruguay. Archived from the original on December 26, 2013. Retrieved November 20, 2013.
  30. 1 2 "Tribunal Ciudadano advierte por riesgos de energía nuclear" (in Spanish). 180.com.uy. October 18, 2010. Retrieved May 2, 2014.
  31. Pozzi, Jorge (November 13, 2010). "La energía nuclear para el Uruguay" (in Spanish). Últimas Noticias. Retrieved November 13, 2013.
  32. 1 2 3 4 Castillo, Federico (October 13, 2008). "El problema de la energía nuclear es su mala prensa". El País (Uruguay) (in Spanish). Archived from the original on December 6, 2013. Retrieved December 3, 2013.
  33. "La energía nuclear fue abordada entre diputados y el ministro Kreimerman" (in Spanish). Sociedad Uruguaya. April 22, 2010. Retrieved December 3, 2013.
  34. "Rosadilla reclama participación de Defensa Nacional en discusión sobre energía nuclear" (in Spanish). Sociedad Uruguaya. March 24, 2010. Retrieved December 3, 2013.
  35. Estupinya, Pere (October 19, 2010). "Juicio popular en Uruguay sobre la energía nuclear: De momento, no". Knight Science Journalism at MIT (in Spanish and English). Massachusetts Institute of Technology. Archived from the original on May 2, 2014. Retrieved May 2, 2014.
  36. Kalverkamp, Michael Álvarez (April 8, 2011). "Nuclear Power in Uruguay". Heinrich Böll Foundation . Retrieved April 12, 2014.
  37. "Law 9.744: Servicios de rayos X y radium. Se declaran comprendidas en un cómputo jubilatorio a las personas que los realicen" (in Spanish). Parliament of Uruguay. December 17, 1937. Archived from the original on September 12, 2007. Retrieved April 11, 2014.
  38. "Law 19.056: Protección y Seguridad Radiológicas de Personas, Bienes y Medio Ambiente" (in Spanish). Parliament of Uruguay. Archived from the original on June 12, 2013. Retrieved December 4, 2013.
  39. 1 2 "Law 13.859: Armas Nucleares. Tratado sobre la no proliferación de las mismas" (in Spanish). Parliament of Uruguay. Archived from the original on March 4, 2016. Retrieved December 4, 2013.
  40. "Protocol Additional to the Agreement between Uruguay and the International Atomic Energy Agency for the Application of Safeguards in Connection with the Treaty on the Non-Proliferation of Nuclear Weapons" (PDF). Information Circular. International Atomic Energy Agency. June 23, 2004. Retrieved April 12, 2014.
  41. "Law 16.075: Organismo Internacional de Energía Atómica. Apruébanse las Convenciones sobre la Pronta Notificación de Accidentes Nucleares" (in Spanish). Parliament of Uruguay. Archived from the original on March 4, 2016. Retrieved December 4, 2013.
  42. "Law 17.051: Convención de Viena sobre Responsabilidad Civil por Daños Nucleares and Protocolo Facultativo sobre Jurisdicción Obligatoria para la Solución de Controversias" (in Spanish). Parliament of Uruguay. Archived from the original on March 4, 2016. Retrieved December 4, 2013.
  43. "Law 17.348: Apruébase el "Tratado de Prohibición Completa de los Ensayos Nucleares"" (in Spanish). Parliament of Uruguay . Retrieved December 4, 2013.[ permanent dead link ]
  44. "Law 17.588: Convención sobre Seguridad Nuclear. Se aprueba en el marco del OIEA" (in Spanish). Parliament of Uruguay. Archived from the original on March 4, 2016. Retrieved December 4, 2013.
  45. "Law 17.680: Convención sobre la Protección Física de los Materiales Nucleares" (in Spanish). Parliament of Uruguay. Archived from the original on March 4, 2016. Retrieved December 4, 2013.
  46. "Law 17.910: Se aprueba la "Convención Conjunta de Seguridad del Combustible Gastado y Seguridad de la Gestión de los Desechos Radiactivos"" (in Spanish). Parliament of Uruguay. Archived from the original on March 4, 2016. Retrieved December 4, 2013.
  47. "Uruguay tomó con calma la situación del reactor nuclear Atucha I" (in Spanish). La República. August 23, 2012. Retrieved December 4, 2013.
  48. Correa, Juan Pablo (August 18, 2014). "Uruguay pide informe sobre central atómica de Argentina". El País (Uruguay) (in Spanish). Retrieved October 24, 2014.
  49. Bottinelli, Eduardo (April 7, 2011). "La instalación de centrales nucleares en Uruguay" (in Spanish). Factum. Archived from the original on March 3, 2014. Retrieved November 7, 2013.

Further reading