Nutmeg (train)

Last updated
Nutmeg
Overview
Service type Inter-city rail
StatusDiscontinued
Locale Northeastern United States
PredecessorHighland Express
First service1950
Last service1955
Former operator(s) New York, New Haven and Hartford Railroad
Route
Termini Boston, Massachusetts
Waterbury, Connecticut
Distance travelled148.5 miles (239.0 km)
Average journey time3 hours, 57 minutes (eastbound)
3 hours, 42 minutes (westbound)
Service frequencyDaily, except Saturday, Sunday & holidays (1955)
Train number(s)Eastbound: 128
Westbound: 129
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The Nutmeg train was a unique east-west train through Massachusetts and Connecticut which did not travel along the Atlantic Coast; in the course of following its route it connected several of Connecticut's medium-sized cities. Operated by the New York, New Haven and Hartford Railroad (NH) from 1950, it took a route from Boston's South Station, running through southwestern Boston suburbs but making no stops until Blackstone, Massachusetts, then through northeast Connecticut along the path of the old Southbridge and Blackstone Railroad, divisions of the old New York and New England Railroad to Hartford's Union Station, and finally to Waterbury's Union Station. Running directly through northeastern Connecticut, it made a shorter trip than the itineraries through Springfield, Massachusetts that the New Haven offered. [1] [2]

Contents

History

View of the western terminus, Waterbury Union Station Western approach to Waterbury CT.jpg
View of the western terminus, Waterbury Union Station

The Nutmeg followed an earlier Highland Express along the same route in the 1930s. [3] There were other unnamed trains that followed this route; however, these were local trains and most of them did not go further west than Hartford. Even in earlier years, such as 1921, travelers continuing west on the same line beyond Waterbury, along territory of the former Central New England Railway, to Danbury, Brewster, Hopewell Junction, Poughkeepsie and Campbell Hall, New York in the mid-Hudson Valley, would need to transfer in Hartford or Waterbury for a Hartford - Campbell Hall train. [4]

The Nutmeg was a weekday train, and there were local running trains that made the trip on weekends. [5] The NH could not continue the route further west to Danbury or to Putnam County, New York because the company had removed tracks from essential points from Waterbury west to Southbury in 1937. [6]

Flood damage in Winsted, Connecticut from Diane Hurricane Diane Connecticut flood damage.jpg
Flood damage in Winsted, Connecticut from Diane

The route was rendered unusable after a major flood during Hurricane Diane in August, 1955 washed out the bridge over the Quinebaug River, west of Putnam, Connecticut. The flood led to the suspension of passenger train traffic between Blackstone, Massachusetts and Hartford. The New Haven RR continued daily unnamed trains between Waterbury and Hartford, and several trains a day between Blackstone and Boston. The Waterbury-Hartford service ended in 1960. [7] [8] [9] With the closing of the route, Connecticut's interior cities no longer have east-west travel options available by rail.

The eastern section, from Franklin to Boston, Massachusetts remains in use by the Massachusetts Bay Transportation Authority's Franklin Line.

Major stops

Related Research Articles

Boston and Maine Railroad Former railroad in New England

The Boston and Maine Railroad was a U.S. Class I railroad in northern New England. Originally chartered in 1835, it became part of what is now the Pan Am Railways network in 1983.

New York, New Haven and Hartford Railroad US railroad from 1872 to 1968

The New York, New Haven and Hartford Railroad, commonly known as The Consolidated or simply as the New Haven, was a railroad that operated in the New England region of the United States from 1872 to December 31, 1968. Founded by the merger of the New York and New Haven and Hartford and New Haven railroads, the company had near-total dominance of railroad traffic in Southern New England for the first half of the 20th century.

Central New England Railway

The Central New England Railway was a railroad from Hartford, Connecticut and Springfield, Massachusetts west across northern Connecticut and across the Hudson River on the Poughkeepsie Bridge to Maybrook, New York. It was part of the Poughkeepsie Bridge Route, an alliance between railroads for a passenger route from Washington to Boston, and was acquired by the New York, New Haven & Hartford Railroad in 1904.

New York and New England Railroad Defunct railroad in southern New England

The New York and New England Railroad (NY&NE) was a railroad connecting southern New York State with Hartford, Connecticut; Providence, Rhode Island; and Boston, Massachusetts. It operated under that name from 1873 to 1893. Prior to 1873 it was known as the Boston, Hartford and Erie Railroad, which had been formed from several smaller railroads that dated back to 1846. After a bankruptcy in 1893, the NY&NE was reorganized and briefly operated as the New England Railroad before being leased to the competing New York, New Haven and Hartford Railroad in 1898.

The Housatonic Railroad is a Class III railroad operating in southwestern New England and eastern New York. It was chartered in 1983 to operate a short section of ex-New York, New Haven and Hartford Railroad in northwestern Connecticut, and has since expanded north and south, as well as west into New York State.

Danbury Branch Metro-North Railroad branch in Connecticut

The Danbury Branch is a diesel branch of the Metro-North Railroad New Haven Line from downtown Norwalk, Connecticut north to Danbury, mostly single-tracked. It opened in 1852 as the Danbury and Norwalk Railroad. Until the early 1970s, passenger service continued north from Danbury to Canaan, Connecticut and Pittsfield, Massachusetts. Metro-North took over operation of the line from Conrail in 1983.

New Haven–Springfield Line

The New Haven–Springfield Line is a railroad line owned by Amtrak from New Haven, Connecticut, north to Springfield, Massachusetts. As a branch of the Northeast Corridor just north of New Haven State Street station, it is served by approximately seven daily Northeast Regional round trips, some continuing from New Haven to Washington, D.C., along the Corridor and others terminating at New Haven as shuttles. On weekends, there is one train daily to Roanoke, Virginia. It is also served by the daily Vermonter, which starts in Washington, D.C. and continues north from Springfield, finally terminating in St. Albans, Vermont. The line is part of the Inland Route connecting Boston and New York via Hartford, Springfield, and Worcester, in contrast to the "Shore Line" along the Connecticut Shore and through Rhode Island.

<i>Cape Codder</i> (train) Seasonal passenger train operated by Amtrak

The Cape Codder was a seasonal passenger train operated by Amtrak between New York City and Hyannis, Massachusetts, on Cape Cod. It operated during the summer between 1986 and 1996. It was the first regular service from New York to the Cape since 1964. The New York, New Haven and Hartford Railroad previously had operated a train under this name until 1958.

Franklin Line MBTA Commuter Rail line

The Franklin Line, also called the Franklin/Foxboro Line, is part of the MBTA Commuter Rail system. It runs from Boston's South Station in a southwesterly direction toward Franklin, Massachusetts, utilizing the Northeast Corridor before splitting off onto the namesake Franklin Branch. Most Franklin Line trains connect to the Providence/Stoughton Line at Readville, though some weekday trains use the Dorchester Branch to access South Station. Most weekday trains, and all weekend trains, bypass Hyde Park.

Seymour station

Seymour station is a commuter rail stop on the Waterbury Branch of the Metro-North Railroad's New Haven Line, located in Seymour, Connecticut.

Franklin/Dean College station

Franklin/Dean College is an MBTA Commuter Rail station located in Franklin, Massachusetts near Dean College. It serves the Franklin Line, for which it was the terminus from 1966 to 1988. The station has a mid-sized park and ride lot to serve town residents; Forge Park/495 station is intended to serve commuters from other nearby towns. The 1912-built station building still serves as a waiting hall and café, open during morning commute hours on weekdays. Franklin/Dean College station has a single side platform serving the line's single track; it is not accessible.

Norwood Depot Commuter rail station on the MBTA Franklin Line

Norwood Depot is an MBTA Commuter Rail Franklin Line station located in downtown Norwood, Massachusetts. The station has two side platforms serving the two tracks of the Franklin Branch, each with a mini-high section for accessibility. The Norfolk County Railroad opened through South Dedham in 1849, with a station at the modern location. It was renamed Norwood in 1872. The line came under control of the New York, New Haven and Hartford Railroad in 1895. The Massachusetts Bay Transportation Authority (MBTA) began subsidizing service in 1966 and purchased the line in 1973. Under the MBTA, renovations to the station were made around 1977 and 1992.

North Haven station

North Haven is a planned regional rail station on the New Haven–Springfield Line near Route 40 and Route 5 in North Haven, Connecticut, to be served by the Hartford Line service. The project has been funded for design, and construction of the station is expected to commence in April 2023.

<i>Hartford Line</i> (Amtrak) Amtrak service between Springfield, MA and New Haven, CT

The Hartford Line is a train service run by Amtrak primarily between Springfield, Massachusetts, and New Haven, Connecticut, along Amtrak's New Haven–Springfield Line.

Yarmouth station (Massachusetts)

Yarmouth station was a railroad station in the Yarmouth Port section of Yarmouth, Massachusetts.

Downtown New Britain station

Downtown New Britain is a bus rapid transit station and the terminus of the CTfastrak line, located just south of Route 72 off Columbus Boulevard and Main Street in New Britain, Connecticut. It opened with the line on March 28, 2015. The station consists of one side platform and one island platform, comprising a collective total of 19 bus bays for CTfastrak local and express services, plus local CT Transit buses which do not use the busway. The station is located at the site of New Britain's former railroad station, which saw service from 1850 to 1960.

John W. Olver Transit Center Intermodal transit hub in Franklin County, Massachusetts

The John W. Olver Transit Center, also called the JWO Transit Center, is an intermodal transit hub for Franklin County, Massachusetts. Located in Greenfield, it currently serves Franklin Regional Transit Authority (FRTA) local bus routes plus intercity bus service. Amtrak's Greenfield station is also located here, with one daily Vermonter round trip and two daily Valley Flyer round trips, which are extensions of Amtrak-run Hartford Line trains.

CT Rail Brand of commuter rail operations in Connecticut, USA

CT Rail, stylized as CTrail, is the brand for commuter rail services overseen by the Connecticut Department of Transportation (CTDOT), in the U.S. state of Connecticut, with some service extending into Massachusetts. CTDOT oversees two lines: Shore Line East, between New Haven and New London, Connecticut, and the Hartford Line, from New Haven, through Hartford, to Springfield, Massachusetts.

The Berkshire was a New York, New Haven and Hartford Railroad named train running from New York City's Grand Central Terminal to Pittsfield, Massachusetts. It was the longest-running north–south train in Litchfield Hills of western Connecticut and the Berkshires of Massachusetts. From New York City it followed the New Haven Line to South Norwalk, the Danbury Line to Danbury and the Berkshire Division to Pittsfield. It began in the 1940s and ran until 1968. The train was preceded by the Berkshire Express, of c.1938-c.1943. It terminated at Pittsfield Union Station until 1960, when the New Haven moved it to another station in the city.

Blackstone station

Blackstone station was a railroad station in Blackstone, Massachusetts. Opened in 1847, it was a stop for Providence–Worcester service until 1960, and Boston commuter service until 1966.

References

  1. New Haven April 1955 timetable, Table 18
  2. Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. p. 87-88, 110-11. ISBN   9780942147124.
  3. New Haven June 1931 timetable, Table 27
  4. "New York, New Haven and Hartford, Table 21". Official Guide of the Railways. National Railway Publication Company. 54 (1). June 1921.
  5. New Haven April 1955 timetable, Table 18
  6. Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. p. 88. ISBN   9780942147124.
  7. Official Guide of the Railways, August 1958, New Haven section, Table 7 (p. 154), Table 31 (p. 165)
  8. Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. p. 112. ISBN   9780942147124.
  9. "Track 12: CT Passenger Stations, N-NE". Tyler City Station. Retrieved 1 November 2015.