Palatana Power Plant | |
---|---|
Official name | ONGC Tripura Power Company Limited (OTPC) |
Country | India |
Location | Palatana, Udaipur, Tripura |
Coordinates | 23°30′00″N91°26′18″E / 23.50000°N 91.43833°E |
Construction began | October 2005 |
Commission date | June 2013 |
Owners | Oil and Natural Gas Corporation, Ministry of Petroleum and Natural Gas, Government of India |
Power generation | |
Units operational | 1 × 363.3 MW (as of 16 January 2014) |
Units planned | 726.6 MW |
Units under const. | 1 × 363.3 MW |
Nameplate capacity |
|
External links | |
Website | www |
ONGC Tripura Power Company Limited (OTPC) also known as Palatana Power Plant, is a thermal power plant station in Palatana, Udaipur in the Gomoti district of the northeastern Indian state of Tripura. It is a division of Oil and Natural Gas Corporation which is under the ownership of Ministry of Petroleum and Natural Gas, Government of India. It is the first government owned-power plant in India and it is also known as the biggest Plant in Northeast India. [1]
726.6 MW Combined Cycle Gas Turbine (CCGT) power plant at Palatana, Tripura, based on ONGC's domestic gas supply. The project is in advanced stage of implementation. EPC contract of about Rs. 2200 crores has already been awarded to BHEL on 11 August 2008. The Generation Project is being domiciled in ONGC Tripura Power Company Ltd. ("OTPC" or "the Company"), a Special Purpose Vehicle promoted by ONGC, IL&FS Limited and Government of Tripura (GoT).
Stage | Unit number | Capacity (MW) | Date of commissioning |
---|---|---|---|
1st | 1 | 363.3 | 2013 January |
1st | 2 | 363.3 | 2014 November [2] |
A 400 kV D/C Transmission system connecting Palatana (generation project site) in Tripura to Bongaigaon in Assam over a distance of around 650 km for the evacuation of power from the generation project.
The development and operation of the transmission system would be undertaken by North-East Transmission Company Limited (NETCL) a joint venture of OTPC, Power Grid Corporation of India Ltd (PGCIL) and the North Eastern Region beneficiary states. OTPC has been granted in-principle approval for Mega Power Project (MPP) status by GoI on 27 July 2006 for the Project. The company is applying to MoP, GoI for final approval of MPP status and the same is expected to be obtained shortly. For evacuating Power from the gas based 726.6 MW power Project Generators, a trunk transmission line is being developed by another Special Purpose Vehicle (SPV), jointly promoted by Power Grid Corporation Ltd., OTPC and the North Eastern Region (NER) states. Inter-state and intrastate sub-transmission system and the distribution system within NER states shall be developed by Power Grid Corporation as the Central Transmission Utility (CTU) The Transmission Project was initially envisaged to be domiciled in a separate SPV, North-East Power Transmission Company Limited ("NEPTC") and developed through a BOOT operator. However given the criticality of timely completion of the Transmission System to the operations of the Generation Plant, a decision was taken to develop the transmission system as a component of the composite Project within OTPC. Subsequently, the process of merging NEPTC with OTPC was initiated; The petition for amalgamation of NEPTC with OTPC was approved by the Hon'ble Guwahati High Court in Sept 2007. Subsequently, in late 2007, in consultation with the Ministry of Power (MoP), it was decided that the integrated project be developed as a regional project. The power allocation from the project was revised and about 640 MW was allocated to the NER beneficiary states and the balance 100 MW was to be retained by OTPC for merchant/short-term sale (based on assumed capacity of 740 MW). Pursuant to this development, the Transmission project was again carved out for development through a separate SPV. Accordingly, the Transmission JV was again incorporate as "North East Transmission Company Ltd"(NETC). The transmission project is progressing smoothly with the process of award of transmission tower construction packages for completion in tandem with the commissioning of the Generation Project. [3]
However, these natural gas reserves are yet to be commercially developed due to low industrial demand in the North-Eastern region. The complexities of logistics and attendant costs limit the economic viability of transportation of gas to other parts of the country where gas is in deficit. In order to optimally utilize the gas available in Tripura, ONGC proposes to initially develop a 726.6 MW Combined Cycle Gas Turbine (CCGT) thermal power plant ("the Project") close to its gas fields in the state of Tripura and supply power to the deficit areas of North Eastern States of India. [4]
660 km long transmission line from the plant to Burnihat in Meghalaya through Silchar in Assam was completed by which power from the first unit could be catered to other states of the north-east. But the work for the 400 kV double circuit high tension line up to Bongaigaon from Burnihat is pending due to forest clearance. [5] The Following are the distribution of electricity to the different Northeastern States of India from the OTPC.
Beneficiary | Power(MW) |
---|---|
Arunachal Pradesh | 22 MW |
Assam | 240 MW |
Manipur | 42 MW |
Meghalaya | 79 MW |
Mizoram | 22 MW |
Nagaland | 27 MW |
Tripura | 196 MW |
Total | 628 MW |
OTPC will be selling the remaining 98 MW electricity.
Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking and the largest government-owned electrical/ industrial technology company. It is owned by the Government of India, with administrative control by the Ministry of Heavy Industries. Established in 1956 with the help of Soviet technology, BHEL is based in New Delhi.
India is the third largest producer of electricity in the world. During the fiscal year (FY) 2023–24, the total electricity generation in the country was 1,949 TWh, of which 1,734 TWh was generated by utilities.
The Calcutta Electric Supply Corporation (CESC) is the Kolkata-based flagship company of the RP-Sanjiv Goenka Group, born from the erstwhile RPG Group, under the chairmanship of businessman Sanjiv Goenka. It is an Indian electricity generation and the sole distribution company serving 567 square kilometres (219 sq mi) of area administered by the Kolkata municipal corporation, in the city of Kolkata, as well as parts of Howrah, Hooghly, 24 Parganas (North) and 24 Parganas (South) districts in the state of West Bengal. It also serves power distribution in Kota, Bikaner and Bharatpur in Rajasthan under the name CESC RAJASTHAN. It serves 3.0 million consumers approximately, which includes domestic, industrial and commercial users.
The Oil and Natural Gas Corporation Limited (ONGC) is an Indian central public sector undertaking which is the largest government-owned oil and gas explorer and producer in the country. It accounts for around 70 percent of India's domestic production of crude oil and around 84 percent of natural gas. Headquartered in Delhi, ONGC is under the ownership of the Government of India and administration of Ministry of Petroleum and Natural Gas. It was founded on 14 August 1956 by the Government of India. In November 2010, the Government of India conferred the Maharatna status to ONGC.
Ultra Mega Power Projects (UMPP) are a series of ambitious power stations planned by the Government of India. This would entail the creation of an additional capacity of at least 100,000 MW by 2022. Ultra Mega Power projects, each with a capacity of 4000 MW or above, are being developed with the aim of bridging this gap.
Peterhead Power Station is a multi-unit station owned and operated by SSE plc, with a capacity of 2,177 MW. It is located near Boddam and the A90, just south of Peterhead, in Aberdeenshire, in the northeast of Scotland. It stands next to Sandford Lodge, a circa-1800-built structure. Initially operating as an oil-fired power station and later transitioning to fossil gas, the plant has also served as a site for experimental hydrogen generation capacity.
GAIL (India) Limited is an Indian state-owned energy corporation with primary interests in the trade, transmission and production distribution of natural gas. GAIL also has interests in the exploration and production solar and wind power, telecom and telemetry services (GAILTEL) and electricity generation. GAIL was founded as the Gas Authority of India Ltd. in August 1984 under the Ministry of Petroleum and Natural Gas to build, operate and maintain the HVJ Gas Pipeline. On 1 February 2013, the Indian government conferred GAIL with Maharatna status along with 11 other Public Sector Undertakings (PSUs).
Little Barford Power Station is a gas-fired power station just north of the village of Little Barford in Bedfordshire, England. It lies just south of the A428 St Neots bypass and east of the Wyboston Leisure Park. The River Great Ouse runs alongside. It was formerly the site of two coal-fired power stations, now demolished. The station is operated by RWE.
Seabank Power Station is a 1,140 MW gas-fired power station at Hallen Marsh in Bristol, England. It is situated beside the A403 road and Severn Estuary, just north of Avonmouth and south of Severn Beach, close to the boundary with South Gloucestershire. It is next to the former Terra Nitrogen Severnside fertiliser works, which was closed by Growhow UK in January 2008.
Coryton Power Station is a 732 MW Combined Cycle Gas Turbine (CCGT) gas-fired power station at Coryton, Thurrock, Essex, UK.
Connah's Quay Power Station is the name of the current 1,420 MW gas-fired power station near Connah's Quay in Flintshire in North Wales. The power plant, which is situated on the south bank of the River Dee, is the modern successor to a coal-fired power station which closed in 1984 and demolished in 1992. The replacement gas-powered plant was completed in 1996 and began producing electricity a year later. It originally received its gas from the Point of Ayr terminal, which in turn comes from the offshore gas fields in Liverpool Bay.
BGR Energy Systems Limited is a company headquartered in Chennai, operating in the utility industry, offering services ranging from product manufacturing to project execution. The company operates in two segments: capital goods and construction and engineering procurement construction (EPC) Contracts.
NTPC Ramagundam, a part of National Thermal Power Corporation, is a 2,600 megawatt (MW) Super thermal power station situated at Ramagundam in Peddapalli district in Telangana, India. It is the current largest power station in South India. It is the first ISO 14001 certified "Super Thermal Power Station" in India.
Adani Power is an Indian multinational power and energy company, subsidiary of Adani Group and based in Khodiyar in Ahmedabad, India. It is a private thermal power producer, with a capacity of 15,250 MW and operates a mega solar plant of 40 MW at Naliya, Bitta, Kutch, Gujarat. Adani Godda Power is implementing a 1,600 MW plant at Jharkhand. The company has signed long term power purchase agreements of about 9,153 MW with the government of Gujarat, Maharashtra, Haryana, Rajasthan, Karnataka, and Punjab.
Technopromexport is a Russian engineering company that builds energy facilities in Russia and abroad, including hydropower, thermal, geo-thermal and diesel power plants, power lines and electricity substations. The company was formed in 1955, and was transformed into a joint stock company in April 2006. The company's charter capital is 15.7 billion rubles. The company is headquartered in Moscow.
Sri Damodaram Sanjeevaiah Thermal Power Station is located in Nelatur Village, near Krishnapatnam and at a distance of 23 km from Nellore city of Andhra Pradesh. The power plant is one of the coal-based power plants of Andhra Pradesh Power Development Company Limited (APPDCL). It is the Special Purpose Vehicle (SPV), a joint venture company of APGENCO and IL AND FS partnership.
Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.
Sagardighi Thermal Power Station is a thermal power plant located at Manigram, 13 km north of Sagardighi in the Indian state of West Bengal. The power plant is operated by the West Bengal Power Development Corporation Limited.
Bongaigaon Thermal Power Station is an under construction power project located at Salakati near Bongaigaon in Kokrajhar district in Indian state of Assam. The power plant is one of the coal based power plants of NTPC.
Yadadri Thermal Power Plant is an upcoming 4000 megawatt, supercritical thermal power project coming up at Dameracherla, Nalgonda district in Telangana, India. The project is second largest in South India, at a cost of ₹25,099 crores and is expected to complete by October 2021 in a phased manner. The state-owned Telangana Power Generation Corporation Limited (TGGENCO) is building the 5 x 800 mega thermal power station, built on 2800 acres near Veerlapalem Village in Nalgonda District, the second mega project announced by the Telangana government after Bhadradri Thermal Power Plant.