Picway Power Plant | |
---|---|
Country | United States |
Location | Harrison Township, Pickaway County, Ohio, near Lockbourne, Ohio |
Coordinates | 39°47′37″N83°00′36″W / 39.79361°N 83.01000°W Coordinates: 39°47′37″N83°00′36″W / 39.79361°N 83.01000°W |
Status | Decommissioned |
Commission date | Units 1–2: 1926 Unit 3: 1943 Unit 4: 1949 Unit 5: 1955 |
Decommission date | Units 1–2: 1972 Units 3–4: 1980 Unit 5: 2015 |
Owner(s) | American Electric Power (AEP) |
Operator(s) | American Electric Power (AEP) |
Thermal power station | |
Primary fuel | Coal |
Cooling source | Scioto River |
Power generation | |
Nameplate capacity | 220 MW |
Picway Power Plant was a 220 megawatt (MW) coal power plant located west of Lockbourne in Pickaway County, Ohio. The plant generated electricity from 1926 until its closure in 2015. It was operated by American Electric Power (AEP).
Picway began operations with two units in September 1926. The plant was operated by the Columbus Railway Power and Light Company, a forerunner of AEP. [1] The two units had a combined capacity of 60 MW. [2] The facility originally used low-profile electric locomotives capable of both third rail and overhead power to move ash cars under the boilers, and move coal around the property; one of these locomotives still exists in operating condition at the Ohio Railway Museum.
Construction of Unit 3 was temporarily halted in 1942 by the War Production Board (WPB) as the building of new non-essential electricity production was suspended for the war effort. [3] Unit 3 officially came online in 1943 with capacity of 30 MW. [2] Unit 4 began commercial operations in 1949 after more than two years of construction at a cost of $5 million. The unit generated 30 MW. [4] [5] The final unit, Unit 5, began commercial operations in 1955 after two years of construction at a cost of $15 million. The unit generated 100 MW and gave Picway a maximum nameplate capacity of 220 MW. [6] [7]
Rail service to supply coal for Picway was provided by the Scioto Valley Railway and Power Company which was later renamed the Ohio-Midland Light and Power Company in 1932. [8] The trackage to the plant was initially powered using third rail, but became dieselized in 1955. It was the last railroad in Ohio to be powered by third rail. [9] The conversion to diesel allowed coal to be interchanged by rail at Lockbourne, instead of Obetz or Groveport previously. [9] Coal deliveries for Picway were switched from rail to truck beginning in 1972, but rail service resumed temporarily during the Blizzard of 1978 when truck deliveries could not get through the snow. [2]
Electrostatic precipitators, which are used to prevent fly ash from being released into the atmosphere, were installed at Picway in 1974. [10] A LO-NOx burner was added to Picway in 1995 in order to reduce nitrogen oxide (NOx) emissions. [11] Picway began generating electricity with biomass and later biodiesel in 2010 as a way to lower operating costs and produce renewable energy. [2] [12] [13]
Units 1 and 2 were retired in 1972. [2] Units 3 and 4 ceased operations in October 1980 in order for Columbus & Southern Ohio Electric to attain pollution reductions from the Ohio's State Implementation Plan (SIP). [14] [15] The Ohio Environmental Council had argued for an expedited shut down before October 1980, but this was rejected by the Sixth Circuit Court of Appeals. [15] [16] By 2010, Picway generated electricity only during the peak summer months as a cost-cutting measure. [17] With changes in federal clean air rules by the Environmental Protect Agency (EPA) on the horizon, AEP announced in 2011 they would retire Picway. [18] AEP cited the Cross-State Air Pollution Rule (CSAPR) and Mercury and Air Toxics Standards (MATS) for the retirement of Picway. [19] The power plant closed in May 2015. [18] The facility and land were sold to a real estate company specializing in brownfield redevelopment in 2016. [20]
A worker died in 1948 from electrocution after accidentally touching a switch while replacing an oil circuit breaker. [21]
American Electric Power (AEP), is a major investor-owned electric utility in the United States, delivering electricity to more than five million customers in 11 states.
The William H. Zimmer Power Station, located near Moscow, Ohio, is a 1.35-gigawatt coal power plant. Planned by Cincinnati Gas and Electric (CG&E), with Columbus & Southern Ohio Electric and Dayton Power & Light (DP&L) as its partners, it was originally intended to be a nuclear power plant. Although once estimated to be 97% complete, poor construction and quality assurance (QA) led to the plant being converted to coal-fired generation. The plant began operations in 1991. Today, the plant is owned and operated by Vistra Energy.
Rockport Generating Station is a coal-fired power plant, located along the Ohio River in Ohio Township, Spencer County, Indiana, in the United States, near Rockport. The power plant is located along U.S. Route 231, approximately one mile north of the William H. Natcher Bridge, spanning the Ohio River. It is operated by Indiana Michigan Power, a subsidiary of American Electric Power.
J. Robert Welsh Power Plant is a 1-gigawatt, coal power plant located east of Pittsburg, Texas in Titus County, Texas. It is operated by SWEPCO, a subsidiary of AEP. The plant is named after J. Robert Welsh, a former President and Board Chairman of SWEPCO.
John E. Amos Power Plant is a three-unit coal-fired power plant owned and operated by Appalachian Power, a subsidiary of American Electric Power (AEP). With a nameplate rating of 2,933 MW, it is the largest generating plant in the AEP system. It was named after John E. Amos, a prominent state senator, Democratic National Committee member from West Virginia, and member of the AEP board of directors.
Muskingum River Power Plant was a 1.5-gigawatt coal power plant, owned and operated by American Electric Power (AEP). It was located on the west bank of Muskingum River, about 4 miles (6 km) northwest of the town of Beverly, Ohio in Washington County, Ohio. At its peak, the plant powered three million households. The plant operated from 1953 until ceasing generation in 2015.
The Hugh L. Spurlock Generating Station is a 1.3-gigawatt coal power plant owned and operated by the East Kentucky Power Cooperative (EKPC) located west of Maysville, Kentucky. The plant began operations in 1977.
Energy in Hawaii is a mixture of fossil fuel and renewable resources. It is complicated by the state's isolated location and lack of fossil fuel resources. The state relies heavily on imports of petroleum and coal for power. Renewable energy production is increasing. Hawaii has the highest share of petroleum use in the United States, with about 62% of electricity coming from oil in 2017. As of 2016, 26.6% of electricity was from renewable sources, including solar, wind, hydro and geothermal. By 2021 Hawaiian Electric announced that it had reached 34.5% renewable.
Killen Station was a 618 megawatt (MW) dual-fuel power generating facility located east of Wrightsville, Ohio in Adams County, Ohio. The power plant had two units: one coal-fired and one oil-fired. At the time of its closure, it was operated by AES Ohio Generation, a subsidiary of the AES Corporation. The plant began operations in 1982 and ceased generation on May 31, 2018.
J.M. Stuart Station was a 2.3-gigawatt coal power plant located east of Aberdeen, Ohio in Adams County, Ohio. The power plant had four units and was operated by AES Ohio Generation, a subsidiary of the AES Corporation. It began operations in 1970 and ceased on May 24, 2018.
Martin Lake Power Plant is a 2,250-megawatt coal power plant located southwest of Tatum, Texas, in Rusk County, Texas. The plant is owned by Luminant. It began operations in 1977. The plant is also served by the Luminant owned Martin Lake Line, shuttling coal from nearby as well as the Powder River Basin in Wyoming via BNSF.
R.E. Burger Power Station was a 568 megawatt (MW), coal power plant located south of Shadyside, Ohio in Belmont County, Ohio. The plant closed in 2011. It was operated by FirstEnergy.
Cardinal Power Plant is a 1.8-gigawatt coal power plant located south of Brilliant, Ohio in Jefferson County, Ohio. The power plant has three units. Cardinal is co-owned with Unit 1 owned by American Electric Power's (AEP) subsidiary, AEP Generation Resources. Units 2–3 are owned by Buckeye Power, a utility cooperative. It began operations in 1967.
Conesville Power Plant was a 2-gigwatt, coal power plant located east of Conesville, Ohio in Coshocton County, Ohio. Its units were co-owned at the time of its closing by American Electric Power (AEP) and AES Ohio Generation. All plant operations were handled by AEP. Conesville began operations in 1957 and ceased generation in April 2020.
The Hanging Rock Energy Facility is a 1.43-gigawatt, natural gas power plant located west of Hanging Rock, Ohio in Lawrence County, Ohio. The plant began operations in 2003 and is currently owned by Vistra Energy.
Oklaunion Power Plant is a 650-megawatt (MW), coal power plant located southeast of Vernon, Texas, in Wilbarger County, Texas. Its unit is operated by American Electric Power (AEP). The plant began commercial generation in 1986.
Philo Power Plant was a 510 megawatt (MW), coal power plant located in Philo in Muskingum County, Ohio. It was the first power plant in the United States to apply steam reheat and supercritical steam generator technologies for its turbines. The plant had six units and its operations were handled by Ohio Power, a forerunner of American Electric Power (AEP). It operated from 1924 until ceasing in 1975.
The Dresden Plant is a 580 megawatt (MW), natural gas power plant located south of Dresden, Ohio in Muskingum County, Ohio. The plant began operations in 2012 and is currently owned by American Electric Power (AEP).
{{cite news}}
: External link in |via=
(help){{cite news}}
: External link in |via=
(help){{cite news}}
: External link in |via=
(help){{cite news}}
: External link in |via=
(help){{cite news}}
: External link in |via=
(help){{cite news}}
: External link in |via=
(help){{cite news}}
: External link in |via=
(help){{cite news}}
: External link in |via=
(help)