Prides Crossing | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | 600 Hale Street, Beverly, Massachusetts | ||||||||||
Coordinates | 42°33′34″N70°49′32″W / 42.5594°N 70.8255°W | ||||||||||
Line(s) | Gloucester Branch | ||||||||||
Platforms | 1 side platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Accessible | No | ||||||||||
Other information | |||||||||||
Fare zone | 5 [1] | ||||||||||
History | |||||||||||
Opened | c. 1850s | ||||||||||
Closed | December 14, 2020 | ||||||||||
Rebuilt | c. 1879 | ||||||||||
Passengers | |||||||||||
2018 | 15 (weekday average boardings) [2] | ||||||||||
Former services | |||||||||||
| |||||||||||
|
Prides Crossing station is a former MBTA Commuter Rail station on the Newburyport/Rockport Line, located in the village of Prides Crossing in Beverly, Massachusetts. It was opened by the Eastern Railroad as a flag stop in the mid-19th century. A stick style wooden station building was constructed around 1880 as wealthy residents built summer homes in the area. The Eastern Railroad was acquired in 1885 by the Boston and Maine Railroad (B&M), which operated commuter service to Prides Crossing until the Massachusetts Bay Transportation Authority (MBTA) took over in the 1970s. Prides Crossing was reduced to peak-hour-only service in 1981. It was temporarily closed in December 2020 because of low ridership and a lack of accessibility, with the closure becoming indefinite in April 2021. The former station building, not used by the railroad since the mid-20th century, is occupied by a private business.
Prides Crossing station was located in the village of Prides Crossing, just west of the level crossing of the Gloucester Branch on Hale Street (Route 127). It had a single low-level side platform on the south side of the two tracks, with an asphalt patch crossing the south track to allow passengers to reach trains on the north track. [3] The station was not accessible. [4]
The former station building, a one-story stick style structure now occupied by a private business, is located on the south side of the tracks adjacent to the platform. The original canopies have been cut back and enclosed for additional space, and the main building modified as well. [5] [6] On the street side of the station building are two benches labeled "Democrats" and "Republicans", which have been local landmarks for decades. [7] In 2015, the well-worn original benches were auctioned for charity and replaced with replicas. [8]
In March 1845, the Eastern Railroad received permission to build a branch line from Beverly to Gloucester. The Gloucester Branch opened to Manchester on August 3, 1847, and to Gloucester on December 1. [9] By the 1850s, the railroad had flag stops at several locations in Beverly, including at Prides (Prides Crossing). [10] The location was named for John Pride – supposedly a nephew of Thomas Pride – who was granted land in the area in 1636. [11] The station had a small shelter and a flagman "stone deaf and so indifferent to the approach of the train that the passengers had to do their own flagging." [12] [13]
A wooden station building – the "tiniest" of the stations in Beverly – was built in 1879 or 1880. [5] [6] Commuting from stops on the Gloucester Branch was possible from the 1870s onward. [9] Prides Crossing was often used by the wealthy residents, including William Loring, who built their summer homes nearby in the later decades of the 19th century and the early 20th century. [12] [14] [15] [16] William Henry Moore and Henry Clay Frick had sidings near the station for their private railroad cars. [17] [18] [19] [20] (The concrete shed for Frick's car Westmoreland, later converted to a private residence, is still extant at 49 Thissell Street. [21] [22] [23] )
The Eastern Railroad became part of the Boston and Maine Railroad (B&M) in 1885. [9] Not until the early 20th century did the station appear in public timetables. [13] The interior woodwork was damaged by a fire on November 12, 1903. [24] In 1915, Moore proposed to fund a new stone station – provided that it was renamed "Moores Crossing". [25] Between 1924 and 1926, service to the station was reduced from 18 inbound and 16 outbound trains to 6 in each direction, which led to nearby estate owners having difficulty retaining domestic workers. [26] Part of the canopy was removed in the 1940s. [13]
The B&M sold or leased many disused station buildings in the mid-20th century. The station building at Prides Crossing was converted to an ice cream parlor by 1962, and to a general store by 1968. [27] [28] The Massachusetts Bay Transportation Authority (MBTA) was formed in 1964 to subsidize suburban commuter rail service. On January 18, 1965, the MBTA began subsidizing some B&M service, including as far as Manchester on the Gloucester Branch. [29] The MBTA bought most B&M commuter rail assets, including the Gloucester Branch, on December 27, 1976. [29] Weekend and midday service to Prides Crossing was ended on February 1, 1981, due to budget cuts, leaving the station with only limited peak-hour service. [30] However, peak-hour express trains for the wealthy North Shore communities, which made only one stop between Prides Crossing and Boston, lasted into the 1980s. [12] [31]
On August 11, 1981, a westbound MBTA Commuter Rail train collided with an eastbound B&M freight train at Prides Crossing. The cab car leading the MBTA train was thrust into the air over the freight locomotive. [32] [33] Two trainmen and a passenger on the freight and the engineer on the commuter train were killed. The National Transportation Safety Board determined that the crash was caused by two dispatchers failing to properly communicate, resulting in the two trains being put on the same track (the second track was out of service due to construction). [34]
On January 20, 1984, the North Station approach trestles were destroyed by a fire. Gloucester Branch trains were terminated at a temporary station near Sullivan Square or bussed from Lynn. On November 16, 1984, the Beverly Draw bridge connecting Salem to Beverly burned, cutting off the Rockport Branch and the Ipswich Line from the rest of the system. (All lines running north and west from the Ipswich Line were abandoned by 1984, leaving no route to move equipment to the rest of the system.) A shuttle train was run from Rockport to Beverly Depot until January 7, 1985, when it was replaced by bus service. [29] The locomotives used were then trucked to Danvers so they could be repaired at the MBTA's main maintenance facility. Most of the stations on the cut-off sections were upgraded with accessible mini-high platforms during the closure; due to its low ridership, Prides Crossing was not upgraded. [35] A new bridge opened on December 1, 1985, reconnecting the lines to the larger system. [29]
With just 15 daily boardings by a 2018 count, Prides Crossing was the third-lowest-ridership station on the MBTA Commuter Rail system, ahead of only Plimptonville station and Silver Hill station. [2] By that time, the station was served by only three peak-hour inbound trips and five peak-hour outbound trips out of fifteen weekday round trips operated on the Gloucester Branch; weekend service did not stop at the station. [1] In November 2020, as part of service cuts during the COVID-19 pandemic, the MBTA proposed to close Prides Crossing and five other low-ridership stations. Prides Crossing was nominated for closure because of its low ridership and lack of accessibility; the accessible Beverly Farms station is just 0.7 miles (1.1 km) to the east. [3] [36]
On December 14, reduced schedules went into effect due to limited employee availability. [37] Based on the existing weekend service, these temporary schedules did not include service to Prides Crossing. [38] That day, the MBTA Board voted to enact a more limited set of cuts, including indefinitely closing Prides Crossing and four of the other five stations. [39] [40] The closure of the five stations became indefinite effective April 5, 2021. [41]
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
Sullivan Square station is a rapid transit station on the MBTA subway Orange Line, located adjacent to Sullivan Square in the Charlestown neighborhood of Boston, Massachusetts. It is a major transfer point for MBTA bus service, with 12 routes using a two-level busway. The station has two island platforms serving the two active Orange Line tracks plus an unused third track. The Haverhill Line and Newburyport/Rockport Line pass through the station on separate tracks but do not stop.
The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014. Most trains reverse direction at the south end at Readville, but some Franklin/Foxboro Line trains use the Fairmount Line rather than the Northeast Corridor.
The Franklin/Foxboro Line is part of the MBTA Commuter Rail system. It runs from Boston's South Station in a southwesterly direction toward Franklin, Massachusetts. Most weekday trains use the Northeast Corridor before splitting off onto the namesake Franklin Branch at Readville, though some weekday trains and all weekend trains use the Dorchester Branch between Boston and Readville.
The Newburyport/Rockport Line is a branch of the MBTA Commuter Rail system, running northeast from downtown Boston, Massachusetts towards Cape Ann and the Merrimack Valley, serving the North Shore. The first leg, operating via the Eastern Route of the former Boston and Maine Railroad, serves Chelsea, Lynn, Swampscott, Salem, and Beverly. From there, a northern branch continues via the Eastern Route to serve Hamilton, Ipswich, Rowley, and Newburyport, while other trains operate east from Beverly via the Gloucester Branch, serving Manchester, Gloucester, and Rockport. A bicycle coach is offered on the Rockport branch during the summer. With over 11,000 daily riders in October 2022, the line is the second-busiest on the system.
The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.
Sharon station is an MBTA Commuter Rail station in Sharon, Massachusetts. It serves the Providence/Stoughton Line. The station has two separate entrances for inbound trains to Boston and for outbound trains to Providence and beyond. New platforms were constructed in 2014 to make the station accessible.
West Medford station is an MBTA Commuter Rail station in Medford, Massachusetts. It serves the Lowell Line, and is located at West Medford Square.
River Works station is an MBTA Commuter Rail station on the Newburyport/Rockport Line in West Lynn, Massachusetts. The only private station on the system, it is only open to GE Aviation employees who work at the adjacent River Works plant. The station has minimal facilities – two small sections of platform and several shelters – and is not accessible.
Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system.
Salem station is an MBTA Commuter Rail station served by the Newburyport/Rockport Line. The station is located off Bridge Street near its interchange with North Street at the north end of downtown Salem, Massachusetts. The station has a single accessible full-length high-level platform serving the single track of the Eastern Route. Just south of the station is the Salem Tunnel, which carries the line under Washington Street. Salem is a major park and ride center, with a 700-space parking garage, as well as an MBTA bus terminal. It is the busiest commuter rail station in the MBTA system outside of the central Boston stations, with an average of 2,326 daily boardings in a 2018 count.
Beverly Depot is an MBTA Commuter Rail station in Beverly, Massachusetts. Located in Downtown Beverly, it serves the Newburyport/Rockport Line. It is the junction of the line's two branches to Newburyport and Rockport and is served by every train on both branches.
Beverly Farms station is an MBTA Commuter Rail station in the Beverly Farms village of Beverly, Massachusetts. Located at the intersection of Oak Street and West Street, it serves the Newburyport/Rockport Line. The 1898-built station building is still present but no longer used for railroad purposes. The station has two side platforms serving the line's two tracks, each with a mini-high section to make the station accessible.
Manchester station is an MBTA Commuter Rail Newburyport/Rockport Line station in Manchester-by-the-Sea, Massachusetts. The station is accessible, with mini-high platforms at the outbound end of the platform.
West Gloucester station is an MBTA Commuter Rail station on the Newburyport/Rockport Line, located off Massachusetts Route 133 in the west part of Gloucester, Massachusetts.
Gloucester station is an MBTA Commuter Rail station in Gloucester, Massachusetts. Located off Railroad Avenue and Washington Street in downtown Gloucester, it serves the Rockport branch of the Newburyport/Rockport Line. The station consists of a single side platform serving the line's single track. The station has a mini-high platform, making it accessible.
Rockport station is an MBTA Commuter Rail station in Rockport, Massachusetts. It is the terminus of the Rockport branch of the Newburyport/Rockport Line. The station complex consists of a single side platform with one revenue track plus 4 layover tracks for parked trains and a short stretch of auxiliary track.
Kendal Green station is an MBTA Commuter Rail station in Weston, Massachusetts, US, served by the Fitchburg Line. The station has a single platform serving two tracks; it is not accessible. It originally opened with the Fitchburg Railroad in 1844 as "Weston"; it was renamed Kendal Green after the green cloth around 1886. A new station building was constructed in 1896. Service passed to the Boston and Maine Railroad in 1900, and to the Massachusetts Bay Transportation Authority (MBTA) in the 1970s. The former station building, reused as a private residence, was added to the National Register of Historic Places in 2000 as a contributing property to the Kendal Green Historic District.
Hastings station was an MBTA Commuter Rail Fitchburg Line station in Weston, Massachusetts. The station had a small parking area but no platforms; passengers boarded trains from the Viles Street grade crossing. It was originally opened in the 1890s to serve the adjacent Hook & Hastings organ factory. The factory closed in 1935, but the station remained open with limited service. It was temporarily closed by the Massachusetts Bay Transportation Authority (MBTA) in December 2020 due to its low ridership and lack of accessibility; indefinite closure became effective in April 2021.
Chelsea station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located adjacent to the Mystic Mall in Chelsea, Massachusetts. It is the terminus of the SL3 route of the MBTA Silver Line bus rapid transit (BRT) network, and is served by the Newburyport/Rockport Line of the MBTA Commuter Rail. The accessible station has a loop with two small platforms for the Silver Line, and two full-length side platforms for commuter rail trains.