Prides Crossing station

Last updated

Prides Crossing
Prides Crossing Confections in former station building, May 2013.jpg
The former Prides Crossing station building in 2013
General information
Location600 Hale Street, Beverly, Massachusetts
Coordinates 42°33′34″N70°49′32″W / 42.5594°N 70.8255°W / 42.5594; -70.8255
Line(s) Gloucester Branch
Platforms1 side platform
Tracks2
Construction
AccessibleNo
Other information
Fare zone5 [1]
History
Openedc.1850s
ClosedDecember 14, 2020
Rebuiltc.1879
Passengers
201815 (weekday average boardings) [2]
Former services
Preceding station MBTA.svg MBTA Following station
Montserrat Newburyport/​Rockport Line
limited service
Beverly Farms
toward Rockport
Location
Prides Crossing station

Prides Crossing station is a former MBTA Commuter Rail station on the Newburyport/Rockport Line, located in the village of Prides Crossing in Beverly, Massachusetts. It was opened by the Eastern Railroad as a flag stop in the mid-19th century. A stick style wooden station building was constructed around 1880 as wealthy residents built summer homes in the area. The Eastern Railroad was acquired in 1885 by the Boston and Maine Railroad (B&M), which operated commuter service to Prides Crossing until the Massachusetts Bay Transportation Authority (MBTA) took over in the 1970s. Prides Crossing was reduced to peak-hour-only service in 1981. It was temporarily closed in December 2020 because of low ridership and a lack of accessibility, with the closure becoming indefinite in April 2021. The former station building, not used by the railroad since the mid-20th century, is occupied by a private business.

Contents

Station design

The "Democrats" and "Republicans" benches, a local landmark, in 2008 Democrats and Republicans benches at Prides Crossing station, October 2008.jpg
The "Democrats" and "Republicans" benches, a local landmark, in 2008

Prides Crossing station was located in the village of Prides Crossing, just west of the level crossing of the Gloucester Branch on Hale Street (Route 127). It had a single low-level side platform on the south side of the two tracks, with an asphalt patch crossing the south track to allow passengers to reach trains on the north track. [3] The station was not accessible. [4]

The former station building, a one-story stick style structure now occupied by a private business, is located on the south side of the tracks adjacent to the platform. The original canopies have been cut back and enclosed for additional space, and the main building modified as well. [5] [6] On the street side of the station building are two benches labeled "Democrats" and "Republicans", which have been local landmarks for decades. [7] In 2015, the well-worn original benches were auctioned for charity and replaced with replicas. [8]

History

Early history

A 1907 postcard of the station Prides Crossing station 1907 postcard (2).jpg
A 1907 postcard of the station

In March 1845, the Eastern Railroad received permission to build a branch line from Beverly to Gloucester. The Gloucester Branch opened to Manchester on August 3, 1847, and to Gloucester on December 1. [9] By the 1850s, the railroad had flag stops at several locations in Beverly, including at Prides (Prides Crossing). [10] The location was named for John Pride – supposedly a nephew of Thomas Pride – who was granted land in the area in 1636. [11] The station had a small shelter and a flagman "stone deaf and so indifferent to the approach of the train that the passengers had to do their own flagging." [12] [13]

A wooden station building – the "tiniest" of the stations in Beverly – was built in 1879 or 1880. [5] [6] Commuting from stops on the Gloucester Branch was possible from the 1870s onward. [9] Prides Crossing was often used by the wealthy residents, including William Loring, who built their summer homes nearby in the later decades of the 19th century and the early 20th century. [12] [14] [15] [16] William Henry Moore and Henry Clay Frick had sidings near the station for their private railroad cars. [17] [18] [19] [20] (The concrete shed for Frick's car Westmoreland, later converted to a private residence, is still extant at 49 Thissell Street. [21] [22] [23] )

The Eastern Railroad became part of the Boston and Maine Railroad (B&M) in 1885. [9] Not until the early 20th century did the station appear in public timetables. [13] The interior woodwork was damaged by a fire on November 12, 1903. [24] In 1915, Moore proposed to fund a new stone station – provided that it was renamed "Moores Crossing". [25] Between 1924 and 1926, service to the station was reduced from 18 inbound and 16 outbound trains to 6 in each direction, which led to nearby estate owners having difficulty retaining domestic workers. [26] Part of the canopy was removed in the 1940s. [13]

MBTA era

The station building, converted to an ice cream parlor, in 1962 Prides Crossing station converted to ice cream parlor, 1962.jpg
The station building, converted to an ice cream parlor, in 1962

The B&M sold or leased many disused station buildings in the mid-20th century. The station building at Prides Crossing was converted to an ice cream parlor by 1962, and to a general store by 1968. [27] [28] The Massachusetts Bay Transportation Authority (MBTA) was formed in 1964 to subsidize suburban commuter rail service. On January 18, 1965, the MBTA began subsidizing some B&M service, including as far as Manchester on the Gloucester Branch. [29] The MBTA bought most B&M commuter rail assets, including the Gloucester Branch, on December 27, 1976. [29] Weekend and midday service to Prides Crossing was ended on February 1, 1981, due to budget cuts, leaving the station with only limited peak-hour service. [30] However, peak-hour express trains for the wealthy North Shore communities, which made only one stop between Prides Crossing and Boston, lasted into the 1980s. [12] [31]

On August 11, 1981, a westbound MBTA Commuter Rail train collided with an eastbound B&M freight train at Prides Crossing. The cab car leading the MBTA train was thrust into the air over the freight locomotive. [32] [33] Two trainmen and a passenger on the freight and the engineer on the commuter train were killed. The National Transportation Safety Board determined that the crash was caused by two dispatchers failing to properly communicate, resulting in the two trains being put on the same track (the second track was out of service due to construction). [34]

The station in 2020, shortly before closure Prides Crossing station, June 2020.jpg
The station in 2020, shortly before closure

On January 20, 1984, the North Station approach trestles were destroyed by a fire. Gloucester Branch trains were terminated at a temporary station near Sullivan Square or bussed from Lynn. On November 16, 1984, the Beverly Draw bridge connecting Salem to Beverly burned, cutting off the Rockport Branch and the Ipswich Line from the rest of the system. (All lines running north and west from the Ipswich Line were abandoned by 1984, leaving no route to move equipment to the rest of the system.) A shuttle train was run from Rockport to Beverly Depot until January 7, 1985, when it was replaced by bus service. [29] The locomotives used were then trucked to Danvers so they could be repaired at the MBTA's main maintenance facility. Most of the stations on the cut-off sections were upgraded with accessible mini-high platforms during the closure; due to its low ridership, Prides Crossing was not upgraded. [35] A new bridge opened on December 1, 1985, reconnecting the lines to the larger system. [29]

Closure

With just 15 daily boardings by a 2018 count, Prides Crossing was the third-lowest-ridership station on the MBTA Commuter Rail system, ahead of only Plimptonville station and Silver Hill station. [2] By that time, the station was served by only three peak-hour inbound trips and five peak-hour outbound trips out of fifteen weekday round trips operated on the Gloucester Branch; weekend service did not stop at the station. [1] In November 2020, as part of service cuts during the COVID-19 pandemic, the MBTA proposed to close Prides Crossing and five other low-ridership stations. Prides Crossing was nominated for closure because of its low ridership and lack of accessibility; the accessible Beverly Farms station is just 0.7 miles (1.1 km) to the east. [3] [36]

On December 14, reduced schedules went into effect due to limited employee availability. [37] Based on the existing weekend service, these temporary schedules did not include service to Prides Crossing. [38] That day, the MBTA Board voted to enact a more limited set of cuts, including indefinitely closing Prides Crossing and four of the other five stations. [39] [40] The closure of the five stations became indefinite effective April 5, 2021. [41]

Related Research Articles

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Sullivan Square station</span> Rapid transit station in Boston, Massachusetts, US

Sullivan Square station is a rapid transit station on the MBTA subway Orange Line, located adjacent to Sullivan Square in the Charlestown neighborhood of Boston, Massachusetts. It is a major transfer point for MBTA bus service, with 12 routes using a two-level busway. The station has two island platforms serving the two active Orange Line tracks plus an unused third track. The Haverhill Line and Newburyport/Rockport Line pass through the station on separate tracks but do not stop.

<span class="mw-page-title-main">Fairmount Line</span> MBTA Commuter Rail line

The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014. Most trains reverse direction at the south end at Readville, but some Franklin/Foxboro Line trains use the Fairmount Line rather than the Northeast Corridor.

<span class="mw-page-title-main">Foxboro station</span> Train station in Foxborough, Massachusetts, US

Foxboro station is an MBTA Commuter Rail station in Foxborough, Massachusetts, located adjacent to Gillette Stadium and the Patriot Place shopping center. The station has a single side platform serving the main track of the Framingham Secondary. It is the terminus of a branch of the Franklin/Foxboro Line service, and is served by trains from Boston via the Franklin/Foxboro Line and from Providence via the Providence/Stoughton Line during events at Gillette Stadium.

<span class="mw-page-title-main">Franklin/Foxboro Line</span> MBTA Commuter Rail line

The Franklin/Foxboro Line is part of the MBTA Commuter Rail system. It runs from Boston's South Station in a southwesterly direction toward Franklin, Massachusetts. Most weekday trains use the Northeast Corridor before splitting off onto the namesake Franklin Branch at Readville, though some weekday trains and all weekend trains use the Dorchester Branch between Boston and Readville.

<span class="mw-page-title-main">Newburyport/Rockport Line</span> Commuter rail service in Massachusetts, US

The Newburyport/Rockport Line is a branch of the MBTA Commuter Rail system, running northeast from downtown Boston, Massachusetts towards Cape Ann and the Merrimack Valley, serving the North Shore. The first leg, operating via the Eastern Route of the former Boston and Maine Railroad, serves Chelsea, Lynn, Swampscott, Salem, and Beverly. From there, a northern branch continues via the Eastern Route to serve Hamilton, Ipswich, Rowley, and Newburyport, while other trains operate east from Beverly via the Gloucester Branch, serving Manchester, Gloucester, and Rockport. A bicycle coach is offered on the Rockport branch during the summer. With over 11,000 daily riders in October 2022, the line is the second-busiest on the system.

<span class="mw-page-title-main">Providence/Stoughton Line</span> Line of the Boston MBTA Commuter Rail system

The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.

<span class="mw-page-title-main">Attleboro station (Massachusetts)</span> Railway station in Attleboro, Massachusetts, US

Attleboro station is a commuter rail station on the MBTA's Providence/Stoughton Line located in Attleboro, Massachusetts. By a 2018 count, Attleboro had 1,547 daily riders, making it the fourth busiest station on the system outside Boston.

<span class="mw-page-title-main">Sharon station</span> Railway station in Sharon, Massachusetts, US

Sharon station is an MBTA Commuter Rail station in Sharon, Massachusetts. It serves the Providence/Stoughton Line. The station has two separate entrances for inbound trains to Boston and for outbound trains to Providence and beyond. New platforms were constructed in 2014 to make the station accessible.

<span class="mw-page-title-main">Lynn station</span> MBTA rail station in Lynn, Massachusetts, US

Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system. The rail station and parking garage temporarily closed on October 1, 2022, pending a reconstruction project, while the busway remained open. Interim platforms nearby opened in December 2023.

<span class="mw-page-title-main">Salem station</span> Commuter rail station in Salem, Massachusetts

Salem station is an MBTA Commuter Rail station served by the Newburyport/Rockport Line. The station is located off Bridge Street near its interchange with North Street at the north end of downtown Salem, Massachusetts. The station has a single accessible full-length high-level platform serving the single track of the Eastern Route. Just south of the station is the Salem Tunnel, which carries the line under Washington Street. Salem is a major park and ride center, with a 700-space parking garage, as well as an MBTA bus terminal. It is the busiest commuter rail station in the MBTA system outside of the central Boston stations, with an average of 2,326 daily boardings in a 2018 count.

<span class="mw-page-title-main">Beverly Depot</span> Train station in Beverly, Massachusetts, US

Beverly Depot is an MBTA Commuter Rail station in Beverly, Massachusetts. Located in Downtown Beverly, it serves the Newburyport/Rockport Line. It is the junction of the line's two branches to Newburyport and Rockport and is served by every train on both branches.

<span class="mw-page-title-main">Beverly Farms station</span> Railway station in Beverly, Massachusetts, US

Beverly Farms station is an MBTA Commuter Rail station in the Beverly Farms village of Beverly, Massachusetts. Located at the intersection of Oak Street and West Street, it serves the Newburyport/Rockport Line. The 1898-built station building is still present but no longer used for railroad purposes. The station has two side platforms serving the line's two tracks, each with a mini-high section to make the station accessible.

<span class="mw-page-title-main">Manchester station (MBTA)</span> Railway station in Manchester-by-the-Sea, Massachusetts

Manchester station is an MBTA Commuter Rail Newburyport/Rockport Line station in Manchester-by-the-Sea, Massachusetts. The station is accessible, with mini-high platforms at the outbound end of the platform.

<span class="mw-page-title-main">West Gloucester station</span>

West Gloucester station is an MBTA Commuter Rail station on the Newburyport/Rockport Line, located off Massachusetts Route 133 in the west part of Gloucester, Massachusetts.

<span class="mw-page-title-main">Gloucester station (MBTA)</span>

Gloucester station is an MBTA Commuter Rail station in Gloucester, Massachusetts. Located off Railroad Avenue and Washington Street in downtown Gloucester, it serves the Rockport branch of the Newburyport/Rockport Line. The station consists of a single side platform serving the line's single track. The station has a mini-high platform, making it accessible.

<span class="mw-page-title-main">Rockport station</span>

Rockport station is an MBTA Commuter Rail station in Rockport, Massachusetts. It is the terminus of the Rockport branch of the Newburyport/Rockport Line. The station complex consists of a single side platform with one revenue track plus 4 layover tracks for parked trains and a short stretch of auxiliary track.

<span class="mw-page-title-main">Windsor Gardens station</span> Railway station in Norwood, Massachusetts, US

Windsor Gardens station is a Massachusetts Bay Transportation Authority (MBTA) Franklin/Foxboro Line station in southern Norwood, Massachusetts. The station has a single side platform serving a single track; it is not accessible. The only entrance to the station is from an adjacent apartment complex; use of the station is not restricted to residents of the complex, though there is no public parking.

<span class="mw-page-title-main">Hastings station (MBTA)</span> Former railway station in Weston, Massachusetts, US

Hastings station was an MBTA Commuter Rail Fitchburg Line station in Weston, Massachusetts. The station had a small parking area but no platforms; passengers boarded trains from the Viles Street grade crossing. It was originally opened in the 1890s to serve the adjacent Hook & Hastings organ factory. The factory closed in 1935, but the station remained open with limited service. It was temporarily closed by the Massachusetts Bay Transportation Authority (MBTA) in December 2020 due to its low ridership and lack of accessibility; indefinite closure became effective in April 2021.

<span class="mw-page-title-main">Chelsea station (MBTA)</span> Intermodal transit station in Chelsea, Massachusetts, US

Chelsea station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located adjacent to the Mystic Mall in Chelsea, Massachusetts. It is the terminus of the SL3 route of the MBTA Silver Line bus rapid transit (BRT) network, and is served by the Newburyport/Rockport Line of the MBTA Commuter Rail. The accessible station has a loop with two small platforms for the Silver Line, and two full-length side platforms for commuter rail trains.

References

  1. 1 2 "NEWBURYPORT/ROCKPORT LINE effective November 20, 2017" (PDF). Massachusetts Bay Transportation Authority. November 20, 2017. Archived from the original (PDF) on February 6, 2021.
  2. 1 2 Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  3. 1 2 Held, Patrick R. (2010). "Massachusetts Bay Colony Railroad Track Charts" (PDF). Johns Hopkins Association for Computing Machinery. p. 22. Archived from the original (PDF) on 8 October 2013.
  4. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  5. 1 2 Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. p. 218. ISBN   9780942147087.
  6. 1 2 "MHC Reconnaissance Survey Town Report: Beverly" (PDF). Massachusetts Historical Commission. 1986. p. 18.
  7. Heald, Bruce D. (2005). Boston and Maine Trains and Services. Arcadia Publishing. p. 47. ISBN   9780738538754.
  8. "BFIS Donates New "Republican" and "Democrat" Benches at Train Station" (PDF). The Farms Flyer. 20. Beverly Farms Improvement Society. Summer 2015.
  9. 1 2 3 Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 75–77. ISBN   9780685412947.
  10. Bragdon, Joseph H. (1857). Seaboard towns; or, Traveller's guide book from Boston to Portland. Moulton & Clark. p.  186 via Internet Archive.
  11. Historical markers erected by Massachusetts Bay Colony Tercentenary Commission. Commonwealth of Massachusetts. 1930. p. 10 via Internet Archive.
  12. 1 2 3 Grow, Lawrence (1979). On the 8:02 – An Informal History of Commuting by Rail in America. Mayflower Books. p. 146. ISBN   9780831766078.
  13. 1 2 3 M. Hepler (March 20, 1993). "Form B – Building". Massachusetts Historical Commission via Massachusetts Cultural Resource Information System.
  14. Beverly Historical Society (2010). Images of America: Beverly Revisited. Arcadia Publishing. p. 69. ISBN   9780738573588.
  15. "One train stop to be restored". Boston Globe. January 15, 1927. p. 10 via Newspapers.com.
  16. "Memoir of Augustus Peabody Loring, Jr". Transactions of The Colonial Society of Massachusetts. Vol. 42. Colonial Society of Massachusetts. February 1952. p. 7.
  17. "Arrive in Private Car". Boston Globe. July 11, 1909. p. 4 via Newspapers.com.
  18. "How the Fricks Traveled: The Westmoreland". The Frick Pittsburgh. January 9, 2020.
  19. Pulsifer, Holly. "A Glimpse of Life Well-Lived". Drivers Digest.
  20. Atlas of the city of Beverly, Essex County, Massachusetts. Geo. H. Walker & Company. 1907. p. 17. hdl:2452/206025.
  21. Sanborn Fire Insurance Map from Beverly, Essex County, Massachusetts. Sanborn Map Company. 1958. p. 43.
  22. "Beverly". Boston Globe. April 14, 1996. p. 213 via Newspapers.com.
  23. "Real Estate". Boston Globe. April 30, 2000. p. 207 via Newspapers.com.
  24. "Railway Station Damaged". Boston Globe. November 13, 1903. p. 13 via Newspapers.com.
  25. "Prides Crossing Offer Discussed". Boston Globe. February 7, 1915. p. 17 via Newspapers.com. Open Access logo PLoS transparent.svg
  26. "Want Train Stops Retained". Boston Globe. November 9, 1926. p. 17 via Newspapers.com.
  27. "Few Trains, But Stations Still Busy". Boston Globe. February 16, 1962. p. 24 via Newspapers.com.
  28. O'Connell, Richard W. (August 18, 1968). "Old railroad depots take on new careers". Boston Globe. p. A-1 via Newspapers.com.
  29. 1 2 3 4 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  30. "T changes start today". Boston Globe. February 1, 1981. p. 24 via Newspapers.com. Open Access logo PLoS transparent.svg
  31. Eastern Line and Gloucester Branch, Massachusetts Bay Transportation Authority, May 3, 1981 via Wikimedia Commons
  32. Tlumacki, John (August 11, 1981). "John Tlumacki". Boston Globe. p. 13. Retrieved January 27, 2016.
  33. Clendinen, Dudley (August 12, 1981). "3 Men Killed in Collision of Massachusetts Trains". New York Times.
  34. "Railroad Accident Report RAR-82-01: Head On Collision of Boston & Maine Corp Extra 1731 East & MBTA Train No. 570 on Former Boston & Maine Corp. Tracks". National Transportation Safety Board. March 9, 1982.
  35. Richard, Ray (September 16, 1985). "North Shore bridge job 'on target'". Boston Globe. p. 17, 20 via Newspapers.com. Open Access logo PLoS transparent.svg
  36. Paget-Seekins, Laurel; Benesh, Kat (November 9, 2020). "Forging Ahead: Scenario and Service Planning" (PDF). Massachusetts Bay Transportation Authority. p. 21.
  37. "Commuter Rail to Temporarily Operate Reduced Service Schedule Starting December 14" (Press release). Massachusetts Bay Transportation Authority. December 10, 2021.
  38. "2020/2021 Reduced Service Schedule: Newburyport/Rockport Line" (PDF). Massachusetts Bay Transportation Authority. December 14, 2020. Archived from the original (PDF) on December 10, 2020.
  39. Enwemeka, Zeninjor (December 14, 2020). "MBTA Control Board Votes To Scale Back Bus, Train And Ferry Service". WBUR. Retrieved February 5, 2021.
  40. Paget-Seekins, Laurel; Benesh, Kat (December 14, 2020). "Forging Ahead: Service Proposal" (PDF). Massachusetts Bay Transportation Authority. p. 17.
  41. "Spring 2021 Service Changes". Massachusetts Bay Transportation Authority. February 2021. Archived from the original on February 28, 2021. Retrieved February 28, 2021.