The Rankine Generating Station is a former hydro-electric generating station along the Canadian side of the Niagara River in Niagara Falls, Ontario, slightly downstream from the older Toronto Power Generating Station. It was built in for the Canadian Niagara Power Company and named for company's founder William Birch Rankine (b. 1858), a New York City (and later of Niagara Falls) lawyer originally from Geneva, New York who died three days after (in Grafton, New Hampshire) the station opened in 1905 and renamed in 1927. [1] Acquired by Niagara Mohawk Power Corporation in 1950 and in 2002, [2] the station became a wholly owned subsidiary of FortisOntario (and part of Canadian owned Fortis Inc.). [3] It was decommissioned in 2006.

Contents

It reopened in July 2021 as a tourist site. [4]

Generating capacity

The facility, also known as The Canadian Niagara Power Generating Station, contained eleven vertical axle, 25 Hertz generators rated at 8320 kVA each for a total generating capacity of 100 MVA. When opening in 1905, the plant was equipped with only five turbines and generators. The generators were based on a design by Nikola Tesla. Peak capacity was achieved in 1924 when additional 25-cycle generator units were installed. The mechanism consisted of "11 vertical steel shafts, each running from a turbine in the deep pit to a generator 130 feet above". Power was transmitted to a transformer station in another Niagara Falls, Ontario location via underground cables. [5] [6]

A September 2019 report provided these additional specifics: [7]

Housing 11 vertical penstocks, water from the Niagara River would enter through the forebay and drop 180 ft (54.8 metres) before being expelled into a 2,000 ft (609.6 metres) tunnel that emptied into the lower Niagara River, right at the base of the Horseshoe Falls.

The station was licensed to generate a maximum of 76.4MW of 25 Hz AC current using its eleven generators. By the 1950s, most other Ontario power plants were producing 60 Hz power but this station was allowed to continue at 25 Hz since there was adequate demand. [8]

Station closure

By 2003, the plant was no longer used constantly and was providing power on demand, typically on week days. In 2005, the station ceased operation and was officially decommissioned the following year. [9]  The Beaux-Arts architecture station was handed over to the Niagara Parks Commission in 2009. [10] Reasons for the closure were:

In 2009 Rankine station's water rights, along with those of two other nearby generating stations, were reallocated to the Sir Adam Beck stations a few kilometres downstream (see also Niagara Tunnel Project). [11]

Re-opening as a tourism site

Photographs and video clips published in 2012 indicated that much of the interior of the plant was in excellent condition. [12] [13] In October 2019, the Niagara Parks Commission publicized plans to re-open the facility in 2021 as a historic industrial site for the purposes of tourism. A report by a journalist who visited the station indicated that the interior remained pristine, with generators painted blue and "doors and enormous hinges made of copper, mosaic tile floors, a beautiful clock at one end of the main hall, marble control panels with old school switches that date to the 1920s, and fittings and other instruments". [14]

William B. Rankine Generating Station Bridge

William B. Rankine Generating Station Bridge is a five span stone arch bridge that cross the water inlet to the power station north of Fraser Hill. The main bridge carries traffic on Niagara Parkway and smaller pedestrian bridge is located at the mouth of the outlet on the shores of the Niagara River. The bridge was rehabilitated in a project that ran from 2012 to 2014; it now has four wide traffic lanes and a separate pedestrian lane. [15]

Related Research Articles

<span class="mw-page-title-main">Niagara Falls</span> Waterfalls between New York, United States and Ontario, Canada

Niagara Falls is a group of three waterfalls at the southern end of Niagara Gorge, spanning the border between the province of Ontario in Canada and the state of New York in the United States. The largest of the three is Horseshoe Falls, which straddles the international border of the two countries. It is also known as the Canadian Falls. The smaller American Falls and Bridal Veil Falls lie within the United States. Bridal Veil Falls is separated from Horseshoe Falls by Goat Island and from American Falls by Luna Island, with both islands situated in New York.

<span class="mw-page-title-main">Northeast blackout of 1965</span> Major power outage in Northeastern U.S. and Canada

The northeast blackout of 1965 was a significant disruption in the supply of electricity on Tuesday, November 9, 1965, affecting parts of Ontario in Canada and Connecticut, Delaware, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, and Vermont in the United States. Over 30 million people and 80,000 square miles (207,000 km2) were left without electricity for up to 13 hours.

<span class="mw-page-title-main">Ontario Hydro</span> Defunct Canadian provincial utility corporation, 1906–2015

Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls, and soon developed its own generation resources by buying private generation stations and becoming a major designer and builder of new stations. As most of the readily developed hydroelectric sites became exploited, the corporation expanded into building coal-fired generation and then nuclear-powered facilities. Renamed as "Ontario Hydro" in 1974, by the 1990s it had become one of the largest, fully integrated electricity corporations in North America.

<span class="mw-page-title-main">Newfoundland Power</span>

Newfoundland Power Inc. is an electric utility owned by Fortis Inc. which is the primary retailer of electric power in the Canadian province of Newfoundland and Labrador. The company was formed by the Royal Securities Corporation of Montreal in 1924 as the Newfoundland Light & Power Company.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

<span class="mw-page-title-main">Falls of Foyers</span> Waterfall in Highland, Scotland

The Falls of Foyers are two waterfalls on the River Foyers, which feeds Loch Ness, in Highland, Scotland, United Kingdom. They are located on the lower portion of the River Foyers, and consist of the upper falls, with a drop of 46 feet (14 m) and the lower falls, which drop 98 feet (30 m).

<span class="mw-page-title-main">Sir Adam Beck Hydroelectric Generating Stations</span>

Sir Adam Beck Hydroelectric Generating Stations are two hydroelectric generating stations in Niagara Falls, Ontario, Canada. Sir Adam Beck Generating Station I, Sir Adam Beck Generating Station II and the Sir Adam Beck Pump Generating Station are all owned by Ontario Power Generation. Following the development of several smaller generating stations around Niagara Falls in the late 19th and early 20th centuries, the Province of Ontario authorized the construction of the first major publicly owned generating station in the province. At the time it was built, it was the largest hydroelectric generating station in the world.

<span class="mw-page-title-main">Robert Moses Niagara Power Plant</span> Niagara River dam in New York State

The Robert Moses Niagara Hydroelectric Power Station is a hydroelectric power station in Lewiston, New York, near Niagara Falls. Owned and operated by the New York Power Authority (NYPA), the plant diverts water from the Niagara River above Niagara Falls and returns the water into the lower portion of the river near Lake Ontario. It uses 13 generators at an installed capacity of 2,525 MW (3,386,000 hp).

<span class="mw-page-title-main">Adams Power Plant Transformer House</span> United States historic place

Adams Power Plant Transformer House in Niagara Falls, New York is a National Historic Landmarked building constructed in 1895. It is the only remaining structure that was part of the historic Edward Dean Adams Power Plant, the first large-scale, alternating current electric generating plant in the world, built in 1895. The building's eponym was Edward Dean Adams, a businessman and entrepreneur in the electrical field.

<span class="mw-page-title-main">Toronto Power Generating Station</span> Abandoned power plant in Canada

The Toronto Power Generating Station is a former generating station located along the Niagara River in Niagara Falls, Ontario, Canada, slightly upstream from the newer Rankine power station. Completed in 1906 in the Beaux-Arts-style, the station was designed by architect E. J. Lennox and was built by the Electrical Development Company of Ontario (owned by William Mackenzie, Frederic Thomas Nicholls, and Henry Mill Pellatt) under supervision of Hugh L. Cooper to supply hydro-electric power to nearby Toronto, Ontario.

<span class="mw-page-title-main">Mechanicville Hydroelectric Plant</span> United States historic place

Mechanicville Hydroelectric Plant is a 18.3-acre (7.4 ha) national historic district located at Mechanicville in Saratoga County, New York. The listing included one contributing building and three contributing structures. The district dates to 1897 and includes notable Queen Anne architecture.

Niagara Falls Hydraulic Power & Manufacturing Company was an American company, based in Niagara Falls, New York that was the first company to generate hydroelectric power from Niagara Falls in 1882. The company built upon several predecessor companies efforts to construct a canal used for hydraulic mill power. In 1918, the company merged with Niagara Falls Power Company, which later became Niagara Mohawk and in 2002 was acquired by National Grid plc.

Niagara Mohawk Power Corporation was a New York State utility company, which was acquired in 2000 by National Grid plc. The Niagara Mohawk Power Corporation designation was retired, using variations of NationalGridUS, though its official designation on annual reports is still Niagara Mohawk Power Corporation.

<span class="mw-page-title-main">Schoellkopf Power Station</span> United States historic place

The Schoellkopf Power Station was built on land owned by Jacob F. Schoellkopf above the Niagara Gorge near the American Falls, 1,600 feet (490 m) downriver from Rainbow Bridge. Understanding the growing need for electricity and the role of harnessing the Falls, Schoellkopf purchased the land for the hydraulic canal on May 1, 1877 for $71,000. After Schoellkopf Sr.'s death in 1903, his sons took over the operation of the power business. In 1918, Schoellkopf's Niagara Falls Hydraulic Power and Manufacturing Company merged with the Niagara Falls Power Company, which was owned by Edward Dean Adams. Much of the site is, as of 2014, occupied by the Maid of the Mist tour boat company as a maintenance area and off-season boat storage yard. The power station remains form a part of a fully accessible tourist attraction associated with Niagara Falls State Park and is connected with its Niagara Gorge hiking trail system.

<span class="mw-page-title-main">Snoqualmie Falls Hydroelectric Plant</span>

The Snoqualmie Falls Hydroelectric Plant is located just north of Snoqualmie in King County, Washington state, US. It is situated about 22 mi (35 km) east of Seattle. Located just below the Snoqualmie Falls, the power plant consists of two power houses, Plant 1 and Plant 2. Plant 1 was completed in 1899 and is located underground. It is the first completely underground hydroelectric power plant ever built in the world. Plant 2 was built in 1910 and is located along the right bank of the Snoqualmie River. Both plants receive water from a small reservoir created by a weir atop the falls. Plant 1 has an installed capacity of 13.7 MW and Plant 2 a capacity of 40.2 MW for a total installed capacity of 53.9 MW, enough to power 40,000 homes.

The Ontario Power Company Generating Station is a former generating station located along the Niagara River in Niagara Falls, Ontario, Canada, just below the Horseshoe Falls.

St. Anthony Falls in Minneapolis, Minnesota, is the only natural falls on the Mississippi River. Since almost the beginning of settlement in the area by European descendants, the St. Anthony Falls have been used for waterpower. The first allowed settlers were at Ft. Snelling, where construction began in 1820. A sawmill was operating 1821 and a flour mill in 1823. As soon as the land at the sides of the falls became available it was purchased with the intent of using the waterpower of the falls. First lumber mills covered the falls, cutting lumber floated down the Mississippi. After 1870 flour mills started to dominate the area. From 1880 to 1930 the area was the number one flour producer in the US. In later years, some of the power came from steam, but in 1923 half of the waterpower used was for flour milling. Other industries have also used the waterpower.

Canadian Niagara Power Inc. is an electricity transmission and distribution utility servicing Fort Erie and Port Colborne, Ontario. Founded in 1892 as the Canadian Niagara Power Company, it operated the Rankine Generating Station from 1905 to 2006.

References

  1. "Niagara Falls - William Birch Rankine Power Station".
  2. FortisOntario, Historical Background , retrieved 2010-12-28
  3. FortisOntario, http://www.fortisontario.com/services_cnp.asp , retrieved 2010-12-28{{citation}}: Missing or empty |title= (help)
  4. Greenwood Davis, Heather (19 May 2021). "Niagara Falls' newest attraction, Niagara Parks Power Station, offers visitors a closer look at its historical power". The Globe and Mail . Retrieved 20 May 2021.
  5. "William Birch Rankine Generating Station - Powerhouse in the Park" (PDF). Hydro Review. 1 July 2004. Retrieved 26 October 2019.
  6. "A relic of Ontario's hydro glory days is about to open to the public". Toronto Star. 26 October 2019. Retrieved 26 October 2019.
  7. "Doors Open Ontario Featured Event at the Canadian Niagara Power Generating Station". Newswire/Ontario Heritage Trust. Retrieved 26 October 2019.
  8. "Rankine Generating Station". Technology Niagara. 1 March 2009. Retrieved 26 October 2019.
  9. "Rankine Generating Station". Technology Niagara. 1 March 2009. Retrieved 26 October 2019.
  10. Fortis Ontario (2005-07-27), Historic Niagara Electrical Generating Station celebrates 100 years of generating power (PDF), archived from the original (PDF) on 2011-07-11, retrieved 2010-12-28
  11. "Preserving Niagara's power history". Niagara Falls Review. 14 January 2013. Retrieved 26 October 2019.
  12. "RANKINE STATION - Step Into The Past". Youtube. 12 December 2012. Archived from the original on 2021-12-19. Retrieved 26 October 2019.
  13. "Derelict Power Stations Photo Essay". James Sarner. 15 July 2012. Retrieved 26 October 2019.
  14. "A relic of Ontario's hydro glory days is about to open to the public". Toronto Star. 26 October 2019. Retrieved 26 October 2019.
  15. "Modern concrete gives bridge a second life". Daily Commercial News. 1 January 2014. Retrieved 26 October 2019.

Coordinates: 43°04′28″N79°04′43″W / 43.0745°N 79.0787°W / 43.0745; -79.0787