Toronto Power Generating Station

Last updated

Toronto Power Generating Station
Toronto Power Generating Station Niagara 2010.jpg
Location Ontario, Canada
Nearest city Niagara Falls
Built1906
Original use Hydro generating station
Current useNone (vacant)
Architect E. J. Lennox
Governing body Niagara Parks Commission
Designated1983
An early photograph of the station Exterior of Toronto Power Generating Station.jpg
An early photograph of the station

The Toronto Power Generating Station is a former generating station located along the Niagara River in Niagara Falls, Ontario, Canada, slightly upstream from the newer Rankine power station. Completed in 1906 in the Beaux-Arts-style, the station was designed by architect E. J. Lennox and was built by the Electrical Development Company of Ontario (owned by William Mackenzie, Frederic Thomas Nicholls, and Henry Mill Pellatt) under supervision of Hugh L. Cooper to supply hydro-electric power to nearby Toronto, Ontario. [1] [2]

Contents

The plant is built on top of a deep wheel pit, with turbines at the bottom of the pit, turning generators at the top by means of long vertical shafts. The water from the turbines runs out through a brick-lined tailrace which eventually comes out at the base of the falls. In its prime, it had a generating capacity of 137,500 horsepower (102,500 kW). [3] [4]

The plant ceased operations on February 15, 1974 as Ontario Hydro looked to make better use of the available water downriver at the Sir Adam Beck Hydroelectric Power Stations in Queenston. In addition, the plant produced electricity at a frequency of 25 Hertz, now largely unused. [2] [5] The vacant plant was designated a National Historic Site of Canada in 1983, due to its importance in the development of business, industry and technology in Ontario, its status as the first wholly Canadian-owned hydro-electric facility at Niagara Falls, and the unusual application of Beaux-Arts design to an industrial plant. [1] [6]

Ownership of the Toronto Power Generating Station was transferred to the Niagara Parks Commission in 2007. Structural assessments were subsequently undertaken in order to consider future adaptive reuse options for the facility. [2] In its current empty state, the plant has been the subject of urban exploration activities. [3] [7]

See also

Related Research Articles

<span class="mw-page-title-main">Ontario Hydro</span> Defunct Canadian provincial utility corporation, 1906–2015

Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls, and soon developed its own generation resources by buying private generation stations and becoming a major designer and builder of new stations. As most of the readily developed hydroelectric sites became exploited, the corporation expanded into building coal-fired generation and then nuclear-powered facilities. Renamed as "Ontario Hydro" in 1974, by the 1990s it had become one of the largest, fully integrated electricity corporations in North America.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

<span class="mw-page-title-main">Sir Adam Beck Hydroelectric Generating Stations</span> Hydroelectric dam in Ontario, Canada

Sir Adam Beck Hydroelectric Generating Stations are two hydroelectric generating stations in Niagara Falls, Ontario, Canada. Sir Adam Beck Generating Station I, Sir Adam Beck Generating Station II and the Sir Adam Beck Pump Generating Station are all owned by Ontario Power Generation. Following the development of several smaller generating stations around Niagara Falls in the late 19th and early 20th centuries, the Province of Ontario authorized the construction of the first major publicly owned generating station in the province. At the time it was built, it was the largest hydroelectric generating station in the world.

<span class="mw-page-title-main">Robert Moses Niagara Power Plant</span> Niagara River dam in New York State

The Robert Moses Niagara Hydroelectric Power Station is a hydroelectric power station in Lewiston, New York, near Niagara Falls. Owned and operated by the New York Power Authority (NYPA), the plant diverts water from the Niagara River above Niagara Falls and returns the water into the lower portion of the river near Lake Ontario. It uses 13 generators at an installed capacity of 2,525 MW (3,386,000 hp) with an average annual net generation of 15,897,000 MWh between 2014 and 2023, and a capacity factor of 71.9%.

<span class="mw-page-title-main">Niagara Tunnel Project</span>

The Niagara Tunnel Project was part of a series of major additions to the Sir Adam Beck hydroelectric generation complex in Niagara Falls, Ontario, Canada.

<span class="mw-page-title-main">Rankine Generating Station</span> Historic site in Ontario, Canada

The Rankine Generating Station is a former hydro-electric generating station along the Canadian side of the Niagara River in Niagara Falls, Ontario, slightly downstream from the older Toronto Power Generating Station. It was built in for the Canadian Niagara Power Company and named for company's founder William Birch Rankine, a New York City lawyer originally from Geneva, New York who died three days after the station opened in 1905 and renamed in 1927. Acquired by Niagara Mohawk Power Corporation in 1950 and in 2002, the station became a wholly owned subsidiary of FortisOntario. It was decommissioned in 2006.

<span class="mw-page-title-main">Frederic Thomas Nicholls</span> Canadian politician

Frederic Thomas Nicholls was a Canadian businessman, electrical engineer and politician. He was a Conservative senator representing the senatorial division of Toronto, Ontario from 1917 to 1921.

<span class="mw-page-title-main">Adams Power Plant Transformer House</span> United States historic place

Adams Power Plant Transformer House in Niagara Falls, New York is a National Historic Landmarked building constructed in 1895. It is the only remaining structure that was part of the historic Edward Dean Adams Power Plant, the first large-scale, alternating current electric generating plant in the world, built in 1895. The building's eponym was Edward Dean Adams, a businessman and entrepreneur in the electrical field.

<span class="mw-page-title-main">Ontario Power Generation</span> Electric utility company in Canada

Ontario Power Generation Inc. (OPG) is a Crown corporation and "government business enterprise" that is responsible for approximately half of the electricity generation in the province of Ontario, Canada. It is wholly owned by the government of Ontario. Sources of electricity include nuclear, hydroelectric, wind, gas and biomass. Although Ontario has an open electricity market, the provincial government, as OPG's sole shareholder, regulates the price the company receives for its electricity to be less than the market average, in an attempt to stabilize prices. Since 1 April 2008, the company's rates have been regulated by the Ontario Energy Board.

<span class="mw-page-title-main">Forks of the Credit Provincial Park</span> Provincial park in Ontario, Canada

Forks of the Credit Provincial Park, located in Caledon, Ontario, Canada, is part of the Ontario Parks system and is part of the Niagara Escarpment biosphere. The park is on the Bruce Trail. The Credit River runs through the park. Other notable features of the park include a kettle lake and talus slope.

Niagara Falls Hydraulic Power & Manufacturing Company was an American company, based in Niagara Falls, New York that was the first company to generate hydroelectric power from Niagara Falls in 1882. The company built upon several predecessor companies efforts to construct a canal used for hydraulic mill power. In 1918, the company merged with Niagara Falls Power Company, which later became Niagara Mohawk and in 2002 was acquired by National Grid plc.

<span class="mw-page-title-main">Stave Falls Dam and Powerhouse</span> Dam in Stave Falls

Stave Falls Dam is a dual-dam power complex on the Stave River in Stave Falls, British Columbia, Canada. The dam was completed in 1912 for the primary purpose of hydroelectric power production. To increase the capacity of Stave Lake, the dam was raised in 1925 and the Blind Slough Dam constructed in an adjacent watercourse 500 m (1,600 ft) to the north, which was the site of the eponymous Stave Falls. In 2000, the dam's powerhouse was replaced after a four-year upgrade. The original Stave Falls powerhouse was once British Columbia's largest hydroelectric power source, and is a National Historic Site of Canada.

Niagara Mohawk Power Corporation was a New York State utility company, which was acquired in 2000 by National Grid plc. The Niagara Mohawk Power Corporation designation was retired, using variations of NationalGridUS, though its official designation on annual reports is still Niagara Mohawk Power Corporation.

<span class="mw-page-title-main">Snoqualmie Falls Hydroelectric Plant</span>

The Snoqualmie Falls Hydroelectric Plant is located just north of Snoqualmie in King County, Washington state, US. It is situated about 22 mi (35 km) east of Seattle. Located just below the Snoqualmie Falls, the power plant consists of two power houses, Plant 1 and Plant 2. Plant 1 was completed in 1899 and is located underground. It is the first completely underground hydroelectric power plant ever built in the world. Plant 2 was built in 1910 and is located along the right bank of the Snoqualmie River. Both plants receive water from a small reservoir created by a weir atop the falls. Plant 1 has an installed capacity of 13.7 MW and Plant 2 a capacity of 40.2 MW for a total installed capacity of 53.9 MW, enough to power 40,000 homes.

Smoky Falls Generating Station is one of four stations in the Lower Mattagami River Hydroelectric Complex owned by Ontario Power Generation (OPG) and the Moose Cree First Nation. The station is approximately 85 km (53 mi) northeast of Kapuskasing in the Cochrane District of Northern Ontario. Smoky Falls was originally commissioned as a 54 MW generating station in 1931 by the Spruce Falls Power and Paper Company but it was sold to OPG's predecessor, Ontario Hydro, in 1991. OPG completed a $2.6 billion upgrade of the four Lower Mattagami dams in 2014 and 2015. The new Smoky Falls was commissioned in late 2014 with a 267.9 MW installed capacity.

The Ontario Power Company Generating Station is a former generating station located along the Niagara River in Niagara Falls, Ontario, Canada, just below the Horseshoe Falls.

<span class="mw-page-title-main">Seven Sisters Generating Station</span> Dam in near Seven Sisters Falls, Manitoba

The Seven Sisters Generating Station is a hydroelectric generating station located on the Winnipeg River, in eastern Manitoba near Seven Sisters Falls, Manitoba. The reservoir is called Natalie Lake and is used for recreational boating and fishing.

St. Anthony Falls in Minneapolis, Minnesota, is the only natural falls on the Mississippi River. Since almost the beginning of settlement in the area by European descendants, the St. Anthony Falls have been used for waterpower. The first allowed settlers were at Ft. Snelling, where construction began in 1820. A sawmill was operating 1821 and a flour mill in 1823. As soon as the land at the sides of the falls became available it was purchased with the intent of using the waterpower of the falls. First lumber mills covered the falls, cutting lumber floated down the Mississippi. After 1870 flour mills started to dominate the area. From 1880 to 1930 the area was the number one flour producer in the US. In later years, some of the power came from steam, but in 1923 half of the waterpower used was for flour milling. Other industries have also used the waterpower.

References

  1. 1 2 "Toronto Power Generating Station". National Register of Historic Places. Retrieved 8 July 2010.
  2. 1 2 3 The Niagara Parks Commission. "Group Tour Guide Study Guide - Toronto Power Generating Station". Archived from the original on 2010-08-21. Retrieved 8 July 2010.
  3. 1 2 Cook, Michael. "Journey Behind the Falls: The Toronto Power Company tailrace". The Vanishing Point. Retrieved 8 July 2010.
  4. "Niagara Falls Historical Timeline". nyfalls.com. Retrieved 8 July 2010.
  5. Kiewit. "Toronto-Ontario Generating Station - Niagara Falls, ON". Projects. Kiewit. Archived from the original on 2011-09-27. Retrieved 8 July 2010.
  6. "Toronto Power Generating Station". Directory of Designations of National Historic Significance of Canada. Parks Canada. Retrieved 8 July 2010.
  7. "Toronto Power Company". NTROPY. Archived from the original on 2012-10-24. Retrieved 8 July 2010.

Commons-logo.svg Media related to Toronto Power Generating Station at Wikimedia Commons 43°04′19″N79°04′25″W / 43.071997°N 79.0737°W / 43.071997; -79.0737