Red Line (Montreal Metro)

Last updated
Montreal Metro 1961 project with line 3 in red and proposed extensions in yellow MetroMontreal-Projet1961-Ligne3proposee-EMDX.png
Montréal Métro 1961 project with line 3 in red and proposed extensions in yellow

The Red Line (French : Ligne rouge), also known as Line 3 (French : Ligne 3), was a proposed line of the Montreal Metro.

Contents

Proposed as part of the Metro in the early 1960s, the line would have run north–south from downtown Montreal, under Mount Royal in the Mount Royal Tunnel, using CN tracks and have ended at Cartierville (western) of Bordeaux-Cartierville. [1]

The line was cancelled because:

The line was still planned for construction as a "regional metro" line in the early 1980s, reduced to a total of 9 stations.

The tracks were used by the commuter rail Deux-Montagnes line between 1995 and 2020, and forms the central section of the Réseau express métropolitain since the completion of the Deux-Montagnes branch in November 2025. [3]

1982 list of planned stations

The following stations were planned for the line: [4]

See also

References

  1. "Why is there no line 3?". Everything about the STM. Société de transport de Montréal. Archived from the original on 10 June 2013. Retrieved 8 September 2012.
  2. 1 2 3 Magder, Jason (13 Oct 2016). "The métro at 50: Building the network". Montreal Gazette .
  3. "November 17, 2025: Scheduled Opening Date for the Deux-Montagnes Branch". 20 October 2025. Retrieved 23 October 2025.
  4. "Le Métro fait surface: La ligne 6". Quebec Science, vol. 21, no. 3, Nov. 1982. Ministere des Transports du Quebec and le Conseil des Transports de la region de Montreal.