Looking east towards the portal of the Mount Royal Tunnel and Jean Talon Street at Canora station in June 2013. | |
Overview | |
---|---|
Line | Réseau express métropolitain (2025) |
Location | Montreal, Quebec, Canada |
Crosses | Mount Royal |
Operation | |
Work begun | 1911 |
Opened | 1918 |
Closed | May 11, 2020 |
Reopened | Fall 2025 [1] |
Traffic | Urban rail transit |
Technical | |
Length | 5.3 km (3.3 mi) [2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Tunnel clearance | 14 ft 6 in (4.42 m) |
The Mount Royal Tunnel (French : tunnel sous le mont Royal, tunnel du mont Royal) is a railway tunnel in Montreal, Quebec, Canada. The tunnel is the third longest in Canada, after the Mount Macdonald Tunnel and the Connaught Tunnel, and connects the city's Central Station, in Downtown Montreal, with the north side of Montreal Island and Laval and passes through Mount Royal.
The tunnel was originally proposed by the Canadian Northern Railway (CNoR) to provide access to Downtown Montreal without having to cross the already-congested area south of Mount Royal or the route around it to the east. The cost of the tunnel, along with an expansion to the west coast of Canada, caused CNoR to struggle financially before it was nationalized in 1918. Canadian National Railways (CNR), formed from CNoR and several other lines, took over the just-completed tunnel. When CNR also took over the Grand Trunk Railway (GTR) in 1923, access to Ottawa and Toronto along the GTR lines made the tunnel largely redundant, and it was limited mostly to branch lines. The structure gauge of the Mount Royal Tunnel limits the height of bilevel cars to 14 feet 6 inches (4.42 m). [3]
Until 2014, the only trains using the tunnel were commuter trains from Exo's Deux-Montagnes service. From December 2014 to May 2020, it was also used by the Mascouche line, which serves the northeastern part of Montreal Island and the suburbs of Repentigny, Terrebonne, and Mascouche. Exo also considered rerouting its Saint-Jérôme line to Central Station via the tunnel from its current termini at Parc or Lucien L'Allier to save 15 minutes.
On May 11 2020, the Mount Royal Tunnel closed for a period initially planned to be three years, [4] but is now expected to reopen fall 2025, more than five years later. [1] The reopening has been delayed due to the discovery of leftover explosives used during the original excavation of the tunnel, greater than expected deterioration at the south end of the tunnel, and various issues caused by the COVID-19 pandemic. [5] As part of the refurbishment providing exclusive use for the Réseau express métropolitain, two new stations will be added mid-tunnel.
The tunnel was conceived in 1910 by the Canadian Northern Railway (CNoR) as a means to give the company access to downtown Montreal. [7] The only easy routes along the south side of Mount Royal had long been taken by rivals Canadian Pacific Railway (CPR) and Grand Trunk Railway (GTR). CNoR wanted to avoid crossing the CPR and GTR lines. Likewise CNoR preferred a direct route as opposed to detouring the railway around the north and east sides of Mount Royal.
To finance the costly tunnel option, CNoR planned to develop the low-valued farmland north of Mount Royal into a model community which was named the Town of Mount Royal. CNoR also planned a downtown terminal and associated office and retail developments for low-priced lands at de la Gauchetière Street and McGill College Avenue. Several farms which grew the Montreal melon were bought by the builders to make way for the tracks: "There were two years of preliminary bargaining, after which currency by the satchel full was paid over to the owners of the farms which made the Montreal melons famous, in the purchase of their land. More than $1,500,000 was paid out in that way, with currency, in the rush of land speculation that followed the announcement of the plan. One farmer was paid $117,000 and another farm brought $781,783." [8]
In 1911, the Canadian Northern Montreal Tunnel and Terminal Company was incorporated to build the tunnel and terminal. It was renamed Mount Royal Tunnel and Terminal Company in 1914, and was a wholly owned subsidiary of CNoR. Construction started at the west portal on July 8, 1912. On December 10, 1913, crews from the east and west portals met beneath Mount Royal; they were out of alignment by 1 inch (2.5 cm). The bore measures approximately 5 kilometres (3.1 mi) and has an ascending grade of 0.6% westbound.
CNoR placed an order with General Electric in 1914 for 6 boxcab electric-powered locomotives for use in the tunnel; they were delivered in 1916–1917. Both the locomotives and the electrification were very similar to those of the Butte, Anaconda and Pacific Railway. Lining of the tunnel bore with concrete was completed by 1916 and the 2 parallel standard gauge tracks and 2400 V DC catenary were installed by September 1918. Progress was slowed by the First World War and CNoR's ongoing financial difficulties by the mid-1910s. The first train, with locomotive 601 leading, ran through the tunnel October 21, 1918. The event was little-noticed due to the still-ongoing war and a ban on large public gatherings due to the Spanish flu epidemic.
On September 6, 1918, the insolvent CNoR was nationalized by the federal government when its board of directors was replaced by a government appointed board of management, implemented by the Department of Railways and Canals. At the same time, the newly appointed board at CNoR was directed to take over the operation of the government-owned Canadian Government Railways (CGR). On December 20, 1918, the Privy Council issued an order creating the Canadian National Railways (CNR) to operate CNoR, CGR and eventually other bankrupt private-sector railways. Ironically, the Grand Trunk became part of CNR in 1923, giving CNR better routes to Ottawa and Toronto and relegating the tunnel line to branch-line status. Nevertheless, it still remains an essential part of Montreal's regional transport system.
CNR took over the Mount Royal Tunnel at the time of its completion, along with the virtually empty lands which CNoR's owners, Sir William Mackenzie and Sir Donald Mann, had envisioned would become a signature real estate development. CNR developed this area sporadically from the 1930s to the 1960s, interrupted by the Great Depression and the Second World War.
A new terminal, begun in 1931, opened as Central Station on July 14, 1943, resulting in the closure of the "temporary" CNoR-era Tunnel Terminal near the same location. Central Station consolidated CNR's passenger terminals in the city and also replaced Bonaventure Station which CNR had inherited from GTR. In the late 1950s, the remainder of the CNoR lands acquired in downtown Montreal during the Mount Royal Tunnel project were developed by CNR. The signature Queen Elizabeth Hotel opened in 1958, followed by the CN (name/acronym change in 1960) headquarters building in 1961 and Place Ville-Marie in 1962.
On July 1, 1982, CN signed a 10-year agreement with STCUM whereby CN operated the line under contract to STCUM's commuter rail service. On February 12, 1992, Quebec's provincial government announced a $289 million modernization of the Mount Royal Tunnel line, including $130 million awarded to Bombardier for 58 new commuter rail cars. Stations, track, electrification and signalling systems were all upgraded, in addition to the tunnel structure itself.
On June 2, 1995, the last of the GE boxcab electric-powered locomotives delivered to CNoR in 1916–1917 for use in the tunnel were retired by CN after nearly 77 years of service. Locomotive 601, which in 1918 pulled the first train into the tunnel, under its final number as Canadian National 6711 pulled the last outbound train; on the return trip it assisted sister 6710. The old rolling stock was replaced by 58 state-of-the-art MR-90 electric multiple units built by Bombardier Transportation.
On February 28, 2014, the Agence metropolitaine de transport (AMT) purchased the Deux-Montagnes line from CN for $97 million. [9] The agreement gave CN trackage rights for freight trains outside two rush-hour exclusive time windows (08:30–15:30 and 20:30–05:30). [10]
Until May 2020, commuter trains from Exo's Deux-Montagnes and Mascouche lines used the Mount-Royal Tunnel. Before 1995, Via Rail trains to/from Northern Quebec and the northern route to Quebec City (cancelled in 1990) also used the tunnel, being hauled up by boxcabs pre-1990, and coasting downhill. This practice was eliminated when the catenary and signalling were replaced in 1995. The old catenary was 3000 V DC (upgraded from the original 2400 V DC in the early 1980s) and the new catenary is 25 kV AC. The new signalling is CTC. The ventilation shaft is too small to allow the use of diesel electric locomotives in the tunnel.
As part of the change to light-rail standards of the REM, the double-tracking of the line from Bois-Franc to Roxboro-Pierrefonds took place, enabling the REM to significantly increase the number of trains on the line. There was a second track from Bois-Franc to slightly past Saraguay (about halfway between Bois-Franc and Sunnybrooke at the A13), but it was not electrified and had been used by CN freight trains serving industries along Doney spur. [6]
On December 1, 2014, the Mascouche line opened to passengers. The line used the Deux-Montagnes line until Jonction de l’Est (between the Montpellier and Mont-Royal stations), where it turned onto the St-Laurent subdivision on the way to Mascouche. Trains were operated with dual-powered ALP-45DP locomotives, and initially ran under electric power to the Ahuntsic station, where they changed over to diesel. Service through the Mount Royal Tunnel ended in May 2020.
The Réseau express métropolitain is replacing this part of the Réseau de transport métropolitain along with the entire Deux-Montagnes line as well as a part of the Mascouche line. In addition, two new stations are being constructed mid-tunnel directly below existing stations of the Montreal Metro, specifically Édouard-Montpetit and McGill stations. The new platforms will allow direct connection to the Metro from the REM, though in the case of Édouard-Montpetit this will involve a long trip by elevator; it will become Canada's deepest transit station at a depth of 75 m (246 ft 1 in).
Exo, stylized as exo and officially known as Réseau de transport métropolitain, is a public transport system in Greater Montreal, including the Island of Montreal, Laval, and communities along both the North Shore of the Mille-Îles River and the South Shore of the St. Lawrence River. It was created on June 1, 2017, taking over Montreal's commuter rail services from the former Agence métropolitaine de transport as well as bus and paratransit services from the various suburban municipal and intermunicipal transit agencies. Exo operates the second busiest such system in Canada after Toronto's GO Transit.
The Canadian Northern Railway (CNoR) was a historic Canadian transcontinental railway. At its 1923 merger into the Canadian National Railway, the CNoR owned a main line between Quebec City and Vancouver via Ottawa, Winnipeg, and Edmonton.
An electro-diesel locomotive is a type of locomotive that can be powered either from an electricity supply or by using the onboard diesel engine. For the most part, these locomotives are built to serve regional, niche markets with a very specific purpose.
Deux-Montagnes was an electrified commuter rail line in Greater Montreal, Quebec, Canada. It was owned by Exo, the organization that operates public transport services throughout the Montreal area.
Mont-Saint-Hilaire is a commuter railway line in Greater Montreal, Quebec, Canada. It is operated by Exo, the operator of public transport services across this region.
Canora station is a future station on the Réseau express métropolitain (REM), expected to open in the third quarter of 2025. It is located in the Glenmount neighbourhood of Montreal, Quebec, Canada, just east of the Town of Mount Royal. The platforms are located northwest of the west portal of the Mount Royal Tunnel.
Ville-de-Mont-Royal station is a future Réseau express métropolitain (REM) station, expected to open in 2025. It is located in Mont Royal, Quebec, about 700 metres (2,300 ft) northwest of Canora station.
Bois-Franc station is a future Réseau express métropolitain (REM) interchange station in the Bois-Franc neighbourhood of Montreal, Quebec, Canada. REM service is expected to begin at the station in the third quarter of 2025.
Deux-Montagnes station is a future terminus station of the Réseau express métropolitain (REM) in Deux-Montagnes, Quebec, Canada. REM service at the station is scheduled to begin in the fall of 2025. The station will serve as the terminus of the Deux-Montagnes branch of the REM.
Montreal Central Station is the major inter-city rail station and a major commuter rail hub in Montreal, Quebec, Canada. Nearly 11 million rail passengers use the station every year, making it the second-busiest train station in Canada, after Toronto Union Station.
Bonaventure Station was the name of a railway station in Montreal, Quebec, Canada. Its name was later adopted by a commercial development and a metro station.
Mascouche is a commuter railway line in Greater Montreal, Quebec, Canada. It is operated by Exo, the organization that operates public transport services across this region.
The Red Line, also known as Line 3, was a proposed line of the Montreal Metro.
Sunnybrooke is a future commuter rail station operated by the Réseau de transport métropolitain (RTM) in the borough of Pierrefonds-Roxboro in Montreal, Quebec, Canada.
Pierrefonds-Roxboro in the borough of Pierrefonds-Roxboro in Montreal, Quebec, Canada is a future Réseau express métropolitain station, expected to open in 2025. Until 2020, it was known as Roxboro-Pierrefonds and was served by the Deux-Montagnes line as part of the Exo network.
The MR-90 was a class of single-level electric multiple unit (EMU) railcars built in 1994–1995 by Bombardier Transportation for the Société de Transport de la Communauté Urbaine de Montreal (STCUM) and last operated by Exo. They were ordered when the Deux-Montagnes line was completely rebuilt from 1993 to 1995 and all the equipment and infrastructure was replaced.
Ahunstic station is a commuter rail station operated by Exo in the borough of Ahuntsic-Cartierville, in Montreal, Quebec, Canada. It is served by the Mascouche line.
The Réseau express métropolitain is a light metro rapid transit system in Greater Montreal, Quebec, Canada. It consists of five stations and connects Downtown Montreal with the suburb of Brossard. Extensions to the western Montreal suburbs and Montréal–Trudeau International Airport are under construction and will open in two stages in 2025 and 2027. A portion of the route was taken over from the Exo commuter rail Deux-Montagnes line and is being converted to light metro standards.
The Canadian National Class Z-1-a was a series of six electric locomotives built by General Electric for the Canadian Northern Railway in 1917. They were used in service through the Mount Royal Tunnel in Montreal until retirement in 1995, operating for 76 years, 7 months and 12 days.
Exo commuter rail is a network of five radial commuter train lines serving the Greater Montreal area, operated by Alstom, using trackage owned by Exo as well as by Canadian National and Canadian Pacific Kansas City.