Salt River Project

Last updated
Salt River Project
TypeAssociation: Utility cooperative
District: Government-owned corporation
Industry Public utility
FoundedFebruary 7, 1903
Headquarters Tempe, Arizona, United States
Products Electricity
Water
RevenueIncrease2.svg US$4.02 billion (FY2023) [1]
Decrease2.svg US$292 million (FY2023) [1]
Decrease2.svg US$362 million (FY2023) [1]
Number of employees
5,123 (FY2023) [1]
Website www.srpnet.com

The Salt River Project (SRP) encompasses two separate entities: the Salt River Project Agricultural Improvement and Power District, an agency of the state of Arizona that serves as an electrical utility for the Phoenix metropolitan area, and the Salt River Valley Water Users' Association, a utility cooperative that serves as the primary water provider for much of central Arizona. It is one of the primary public utility companies in Arizona.

Contents

SRP is not related to the Rio Salado Project (Rio Salado is Spanish for Salt River), a series of improvement projects along the Salt River through the Phoenix Metropolitan Area.

Service territory

SRP serves nearly all of the Phoenix metropolitan area. A large portion of its electric service territory is shared with Arizona Public Service.

Governance

Each company of SRP is governed separately.

For the Association, landowners elect a president, a vice president, a 10-member board of governors and 30 council members.

For the District, landowners elect a president, a vice president, a 14-member board of directors and 30 council members.

The officials of each organization are elected on the first Tuesday in April of even-numbered years. The last scheduled Association and District elections were held on April 7, 2020.[ needs update ] Both are elected by all landowners in the SRP service area through a "debt-proportionate" system. For instance, a person who owns five acres casts five votes.

History

The Hohokam, the ancestors of the Salt River Pima-Maricopa Indian and Gila River Indian communities, built canals spanning nearly 500 miles. The SRP canal system follows much of the ancient canal network. [2]

Early settlers in Phoenix and nearby areas were forced to rely on the flow of the Salt River to sustain agricultural activities. The river was prone to both floods and droughts and proved to be a less than reliable resource for the settlers. Failed plans to build a dam on the river in 1897, [3] combined with a series of droughts, heightened the need for controlling the river.

With the passage of the National Reclamation Act of 1902, funding for reclamation projects with low-interest government loans paved the way for the creation of the Salt River Valley Water Users' Association the following year. Over 200,000 acres (81,000 ha) of private land belonging to the ranchers and farmers in the association were pledged for collateral and the association was officially incorporated February 7, 1903, becoming the first multipurpose project started under the reclamation act. [4] Following on March 14, 1903, this project was one of the first five reclamation projects approved, under the Act, by the Secretary of the Interior. [5] Construction on the Roosevelt Dam would commence the following year.

The original Roosevelt Dam, completed in 1911 was, at that time, the highest masonry dam ever built. In 1996, it was upgraded by encasing the original construction in new concrete (shown). Roosevelt Dam.jpg
The original Roosevelt Dam, completed in 1911 was, at that time, the highest masonry dam ever built. In 1996, it was upgraded by encasing the original construction in new concrete (shown).

Although the construction of dams was the association's most visible and costly project, an integral part of the effort was also the construction and improvement of a system of canals designed to distribute the water from the Salt River among the various members living in the valley.

Hydroelectricity was produced at the dam site during construction, and used for the manufacture of cement and other purposes. In 1906 (before the dam was completed) electricity began to be produced from a hydroelectric generator within the dam. Almost all of the electricity not needed for agriculture, including the majority of that used in Phoenix, was sold to PG&E under an agreement that prohibited the United States Bureau of Reclamation from selling retail electricity within the city. [6]

In 1936, the Arizona Legislature allowed for the creation of governmental districts that could finance large-scale agricultural projects with tax-free bonds. [7] Shortly thereafter, the Salt River Project Agricultural Improvement and Power District was created, the second half of SRP as it exists today. Over the next several decades, a series of major improvements along the Salt and Verde rivers would raise the number of reservoirs in the district to six, and at the same time SRP was constructing and maintaining a number of other electrical generating stations throughout the state.

As of 2007, SRP owns or operates eleven electrical generating stations, seven hydroelectric plants, and has energy purchasing agreements with four major hydroelectric stations along the Colorado River, making them a major provider of electric service in the Phoenix area. Along with the six reservoirs along the Salt and Verde rivers, SRP operates dams at the Blue Ridge Reservoir as well as the Granite Reef Diversion Dam and a number of canals, making the SRP a major provider of water to the Phoenix area.

Salt River reservoirs

SRP owns and operates four reservoirs along the Salt River east of Phoenix. The main function of these reservoirs is to serve as water storage for the Phoenix metropolitan area, with a total capacity of 3,292,054 acre feet.

These reservoirs also serve as important recreational centers. The lakes are regularly stocked with fish, and are supplied with boat ramps for both angling and other watersports.

Theodore Roosevelt Lake

Dedication ceremonies of Roosevelt Dam (Arizona Territory), Col. Roosevelt speaking, March 18, 1911. Roosevelt dam 1911.jpg
Dedication ceremonies of Roosevelt Dam (Arizona Territory), Col. Roosevelt speaking, March 18, 1911.
Lake Roosevelt, Arizona Roosevelt Lake5.jpg
Lake Roosevelt, Arizona

Theodore Roosevelt Dam and the Roosevelt Lake it forms are considered perhaps the crowning achievements of SRP. With the initial funds raised by the association in 1903, an ambitious project was begun several miles east of Phoenix in the Tonto Valley, at the confluence of the Tonto Creek and the Salt River. At its completion in 1911, Roosevelt Dam was the tallest masonry dam in the world at 280 feet (85 m). [8] It was dedicated by U.S. President Theodore Roosevelt, for whom the dam and the reservoir are named. [9]

In 1996, a massive expansion project aimed at increasing the capacity of the lake was finished. The dam was resurfaced with concrete and raised an additional 77 feet (23 m), which had the effect of increasing the lake's capacity by over 20%, and providing much needed flood control space on the Salt River. Shortly after completion, however, the area entered into a prolonged period of drought, and it would be some time before the new capacity was used, with the lake finally reaching historic levels of 90% capacity in early 2005. [10]

With an at-capacity surface area of nearly 21,500 acres (8,700 ha), Roosevelt is the largest lake that is wholly inside the state of Arizona. It can store 2,910,200 acre-feet (3.5897×109 m3) of water at capacity. [11]

Apache Lake

Horse Mesa Dam and Apache Lake Horse Mesa Dam.jpg
Horse Mesa Dam and Apache Lake

Apache Lake was formed by the construction of the Horse Mesa Dam, finished in 1927. Several miles downstream from Roosevelt, the dam stands 300 feet (91 m) high. The lake itself is considerably smaller than Roosevelt at only 2,600 acres (1,100 ha) of surface area at full capacity, and can store 254,138 acre-feet (313,475,000 m3) of water. [12]

Like the rest of the Salt River lakes downstream from Roosevelt, Apache Lake is long and narrow, filling the bottom of the canyon it resides in. It does have a hydroelectric generating station.

Canyon Lake

Canyon Lake, the third lake on the Salt River, is created by the Mormon Flat Dam. The dam was completed in 1925, being the second of the dams to be completed. The dam is named for a nearby geographical feature, a flat campground where Mormon pioneers from Utah would often stop on their journey to the Phoenix area. Downstream from Apache Lake, it is considerably smaller with only 950 acres (380 ha) of surface area when full, holding 57,852 acre-feet (71,359,000 m3). Like the other Salt River dams, it is equipped with hydroelectric generators. [13]

Saguaro Lake

Stewart Mountain Dam and Saguaro Lake Stewart Mountain Dam.jpg
Stewart Mountain Dam and Saguaro Lake

Saguaro Lake is formed by the Stewart Mountain Dam, downstream from Canyon Lake. Completed in 1930, it was the last of the reservoirs to be built on the Salt River. It is somewhat larger than Canyon but smaller than the others, having a surface area of 1,280 acres (520 ha) when full, holding 69,765 acre-feet (86,054,000 m3). The dam is equipped with hydroelectric generators. [14]

Verde River reservoirs and other dams

After completion of the four dams on the Salt River, SRP turned to the smaller Verde River for further expansion of the project. Like the reservoirs on the Salt, the Verde reservoirs are used for recreational purposes as well as water storage and flood control.

Bartlett Lake

The first of the lakes on the Verde River was created with the construction of the Bartlett Dam, finishing in 1939. At 308.5 feet (94 m) tall, the multiple-arch dam is lacking in hydroelectric generating capabilities, unlike most dams on the Salt River. Bartlett Lake, with 2,700 acres (1,100 ha) of surface area at capacity, is larger than all the Salt River reservoirs save Roosevelt. When full the lake can hold 178,186 acre-feet (219,789,000 m3) of water.

Horseshoe Lake

Horseshoe Lake is formed by Horseshoe Dam and was finished in 1946, upstream from Lake Bartlett. Unlike the other dams built to this point, the construction was done by the Phelps Dodge Corporation as part of a water exchange agreement. In 1949, the city of Phoenix funded the construction of spillway gates for the dam in exchange for water rights for city users. Like Bartlett, this dam does not have hydroelectric generating capabilities. At 2,800 acres (1,100 ha) in surface area when full it is slightly larger than Bartlett but has a smaller total capacity, holding only 131,427 acre-feet (162,113,000 m3) at maximum.

C.C. Cragin Dam and Reservoir

Phelps Dodge, Inc., a large mining company in Arizona, constructed the Blue Ridge Dam (now named C.C. Cragin) in 1965 to help meet its water needs. A water exchange agreement penned three years earlier promised the facilities to SRP, and in 2005 SRP took possession of the dam and water production facilities. Located on the Mogollon Rim, C.C. Cragin is not on the Salt or Verde rivers but is a part of the general watershed covered in the SRP area. The small lake has a storage capacity of only 15,000 acre-feet (19,000,000 m3) of water and is used to augment the water supply for the Gila River Indian Community, northern Gila County and the town of Payson.

Granite Reef Dam

The Granite Reef Diversion Dam, constructed near the confluence of the Salt and Verde rivers, does not actually hold back a reservoir but is used to divert water from those rivers into the system of canals feeding into the Phoenix area. It was actually the first of the dams constructed, finished in 1906 to replace the Arizona Dam, which had been washed away by floods the previous year.

Canal system

SRP operates canals running in a network through much of the southern half of the Phoenix metropolitan area that distributes water from the Salt River system. Major canals operated by SRP are:

SRP also operates flood control canals throughout the Phoenix area.

Power generation

Besides the power generated at several of the dams along the Salt River, SRP owns or operates, in part, several power generating stations throughout the state:

Membership in organizations

Public Affairs Council

Renee Eastman, representing Salt River Project, is on the 2013-2014 Board of Directors for the Public Affairs Council (PAC). [15] [16]

National Conference of State Legislatures

Salt River Project is a Gold Sponsor for the National Conference of State Legislatures (NCSL). [17]

Greater Phoenix Chamber of Commerce

Peter Hayes, an Associate General Manager at SRP, is on the board of directors of the Greater Phoenix Chamber of Commerce (GPCC). [18]

Salt River Project has been a member of the Greater Phoenix Chamber of Commerce (GPCC) since 1940. [19]

Arizona Chamber of Commerce and Industry

Molly Greene, is on the board of directors of the Arizona Chamber of Commerce and Industry serving as the Chair of Public Affairs Committee. [20]

Salt River Project is an "Arizona Trustee" member of the Arizona Chamber of Commerce and Industry. [21]

Greater Phoenix Urban League

Russell Smoldon, representing Salt River Project, is on the board of directors for the Greater Phoenix Urban League [22]

Electric Power Research Institute

Salt River Project is a member of the Electric Power Research Institute (EPRI). [23]

Large Public Power Council

Salt River Project is a member of the Large Public Power Council (LPPC). [24]

American Public Power Association

Salt River Project is a member of the American Public Power Association (APPA). [25]

Labor and Management Public Affairs Committee

Salt River Project is a member of the Labor and Management Public Affairs Committee (LAMPAC), a utility labor organization. [26]

Democratic Attorneys General Association

Salt River Project sponsored programming on the order of $15,000 between 2006 and 2009 to the Democratic Attorneys General Association. [27]

Western Governors Association

Salt River Project took part in several energy-related initiatives for and through the Western Governors Association (WGA). [28]

Council of State Governments

Salt River Project is a member of the Associates program of the Council of State Governments (CSG). [29]

American Legislative Exchange Council

Russell Smolden, representing Salt River Project, sits on the Private Enterprise Board of the American Legislative Exchange Council (ALEC). [30]

Related Research Articles

<span class="mw-page-title-main">Grand Coulee Dam</span> Dam in Grant and Okanogan counties, near Coulee Dam and Grand Coulee, Washington, US

Grand Coulee Dam is a concrete gravity dam on the Columbia River in the U.S. state of Washington, built to produce hydroelectric power and provide irrigation water. Constructed between 1933 and 1942, Grand Coulee originally had two powerhouses. The third powerhouse ("Nat"), completed in 1974 to increase energy production, makes Grand Coulee the largest power station in the United States by nameplate capacity at 6,809 MW.

<span class="mw-page-title-main">Salt River (Arizona)</span> River in Gila and Maricopa counties in Arizona, United States

The Salt River is a river in Gila and Maricopa counties in Arizona, United States, that is the largest tributary of the Gila River. The river is about 200 miles (320 km) long. Its drainage basin covers about 13,700 square miles (35,000 km2). The longest of the Salt River's many tributaries is the 195-mile (314 km) Verde River. The Salt's headwaters tributaries, the Black River and East Fork, increase the river's total length to about 300 miles (480 km). The name Salt River comes from the river's course over large salt deposits shortly after the merging of the White and Black Rivers.

<span class="mw-page-title-main">Columbia Basin Project</span> American irrigation project

The Columbia Basin Project in Central Washington, United States, is the irrigation network that the Grand Coulee Dam makes possible. It is the largest water reclamation project in the United States, supplying irrigation water to over 670,000 acres (2,700 km2) of the 1,100,000 acres (4,500 km2) large project area, all of which was originally intended to be supplied and is still classified irrigable and open for the possible enlargement of the system. Water pumped from the Columbia River is carried over 331 miles (533 km) of main canals, stored in a number of reservoirs, then fed into 1,339 miles (2,155 km) of lateral irrigation canals, and out into 3,500 miles (5,600 km) of drains and wasteways. The Grand Coulee Dam, powerplant, and various other parts of the CBP are operated by the Bureau of Reclamation. There are three irrigation districts in the project area, which operate additional local facilities.

<span class="mw-page-title-main">Parker Dam</span> Colorado River dam between Arizona and California

Parker Dam is a concrete arch-gravity dam that crosses the Colorado River 155 miles (249 km) downstream of Hoover Dam. Built between 1934 and 1938 by the Bureau of Reclamation, it is 320 feet (98 m) high, 235 feet (72 m) of which are below the riverbed (the deep excavation was necessary in order to reach the bedrock on which the foundation of the dam was built), making it the deepest dam in the world. The portion of the dam above the foundation stands 85 feet (25.9 m) tall, making it the only dam in the world that stands more underground than above ground. The dam's primary functions are to create a reservoir, and to generate hydroelectric power. The reservoir behind the dam is called Lake Havasu and can store 647,000 acre⋅ft (798,000,000 m3; 2.11×1011 US gal; 1.76×1011 imp gal). The dam straddles the Arizona-California state border at the narrows the river passes through between the Whipple Mountains in San Bernardino County, California and the Buckskin Mountains in La Paz County, Arizona.

<span class="mw-page-title-main">Pineview Dam</span> Dam in Utah, United States

Pineview Dam is located in Ogden Canyon, 7 miles (11 km) east of Ogden, Utah, United States.

<span class="mw-page-title-main">Theodore Roosevelt Dam</span> Dam in Gila and Maricopa Counties, Arizona

Theodore Roosevelt Dam is a dam on the Salt River located northeast of Phoenix, Arizona. The dam is 357 feet (109 m) high and forms Theodore Roosevelt Lake as it impounds the Salt River. Originally built between 1905 and 1911, the dam was renovated and expanded in 1989–1996. The dam is named after President Theodore Roosevelt. Serving mainly for irrigation, water supply, and flood control, the dam also has a hydroelectric generating capacity of 36 megawatts.

<span class="mw-page-title-main">New Waddell Dam</span> Dam in Maricopa County, Arizona

The New Waddell Dam is an embankment dam on the Agua Fria River in Maricopa County, Arizona, 35 miles (56 km) northwest of Phoenix. It serves as part of the Central Arizona Project (CAP) while also providing water for the Maricopa Water District. The dam creates Lake Pleasant with water from the Agua Fria and also the CAP aqueduct. In addition, it affords flood protection, hydroelectric power production and recreational opportunities. Construction on the dam began in 1985 and ended in 1994. Its reservoir submerged the Old Waddell Dam which was completed in 1927 after decades of planning.

<span class="mw-page-title-main">Stewart Mountain Dam</span> Dam in Maricopa County, Arizona

The Stewart Mountain Dam is a concrete thin arch dam located 41 miles northeast of Phoenix, Arizona. The dam is 1,260 feet (380 m) long, 207 feet (63 m) high, and was built between 1928 and 1930. The dam includes a 13,000 kilowatt (kW) hydroelectric generating unit that is operated by SRP, an Arizona public utility. It is primarily operated during the summer months. The dam forms Saguaro Lake as it slows the passage of the Salt River in Maricopa County, Arizona. It was named after a ranch that used to be located nearby known as the Old Stewart Ranch.

<span class="mw-page-title-main">Childs-Irving Hydroelectric Facilities</span> United States historic place

Childs-Irving Hydroelectric Facilities consisted of two 20th-century power plants, a dam, and related infrastructure along or near Fossil Creek in the U.S. state of Arizona. The complex was named an Historic Mechanical Engineering Landmark in 1971 and was added to the National Register of Historic Places 20 years later. Decommissioned in 2005, the plants no longer produce electricity, and much of the infrastructure—including the dam, the Irving Power Plant, and thousands of feet of concrete flumes—have been removed, and the creek's original flow has been restored.

<span class="mw-page-title-main">Theodore Roosevelt Lake</span> Reservoir on the Salt River, Gila County, Arizona, US

Theodore Roosevelt Lake is a large reservoir formed by Theodore Roosevelt Dam on the Salt River in Arizona as part of the Salt River Project (SRP). Located roughly 80 miles (130 km) northeast of Phoenix in the Salt River Valley, Theodore Roosevelt is the largest lake or reservoir located entirely within the state of Arizona. The reservoir and the masonry dam that created it, Roosevelt Dam, were both named after U.S. President Theodore Roosevelt who dedicated the dam himself on March 18, 1911. Roosevelt Lake is a popular recreation destination within the Tonto National Forest; the facilities located at this lake are managed by that authority.

<span class="mw-page-title-main">Hungry Horse Dam</span> Dam in Montana

Hungry Horse Dam is an arch dam in the Western United States, on the South Fork Flathead River in the Rocky Mountains of northwest Montana. It is located in Flathead National Forest in Flathead County, about fifteen miles (24 km) south of the west entrance to Glacier National Park, nine miles (14 km) southeast of Columbia Falls, and twenty miles (32 km) northeast of Kalispell. The Hungry Horse project, dam, and powerplant are operated by the U.S. Bureau of Reclamation. The entrance road leading to the dam is located in Hungry Horse.

<span class="mw-page-title-main">Granite Reef Diversion Dam</span> Dam located northeast of Phoenix, Arizona, United States

The Granite Reef Diversion Dam is a concrete diversion dam located 22 miles (35 km) Northeast of Phoenix, Arizona. It impounds the Salt River for irrigation purposes.

<span class="mw-page-title-main">Mormon Flat Dam</span> Dam on the Salt River in Arizona

The Mormon Flat Dam is a dam on the Salt River located Northeast of Phoenix, Arizona.

<span class="mw-page-title-main">Horse Mesa Dam</span> Dam in Maricopa County, Arizona

The Horse Mesa Dam is a concrete thin arch dam located in the Superstition Mountains, northeast of Phoenix in Maricopa County, Arizona.

<span class="mw-page-title-main">Horseshoe Dam</span> Dam near Phoenix, Arizona

The Horseshoe Dam is a dam located North of Phoenix, Arizona. The dam is 1,500 feet (460 m) long, 144 feet high and was built between 1944–1946. The dam forms the Horseshoe Lake as it slows the passage of the Verde River. The dam was listed on the National Register of Historic Places in 2017.

<span class="mw-page-title-main">Bartlett Dam</span> Dam in near Phoenix, Arizona

The Bartlett Dam is a concrete multiple-arch buttress dam on the Verde River, located 50 km northeast of Phoenix, Arizona. The dam creates Bartlett Lake and its primary purpose is irrigation water supply. It was the first dam constructed on the Verde River and the first of its type constructed by the U.S. Bureau of Reclamation. It was built between 1936 and 1939. It was named after Bill Bartlett, a government surveyor. It was listed on the National Register of Historic Places in 2017.

The Central Utah Project is a US federal water project that was authorized for construction under the Colorado River Storage Project Act of April 11, 1956, as a participating project. In general, the Central Utah Project develops a portion of Utah's share of the yield of the Colorado River, as set out in the Colorado River Compact of 1922.

<span class="mw-page-title-main">East Verde River</span> River in Arizona, United States

The East Verde River is a tributary of the Verde River in the U.S. state of Arizona. Beginning on the Mogollon Rim near Washington Park, it flows generally southwest through Gila County and the Tonto National Forest northeast of Phoenix. Near the middle of its course, it passes to within about 5 miles (8 km) of Payson, which is southeast of the river. The East Verde River flows through parts of the Mazatzal Wilderness west of Payson.


Picacho Reservoir is just 11 miles (18 km) south of Coolidge in central Arizona. The reservoir was built in the 1920s as part of the San Carlos Irrigation Project. The reservoir's original purpose was water storage and flow regulation for the Florence-Casa Grande and Casa Grande Canals. The lake's design capacity was 24,500 acre-feet (30,200,000 m3) of water, with a surface area of over 2 square miles (5.2 km2). Over the years, siltation and vegetation have reduced the capacity and surface area, so that much of the reservoir is a shallow marsh with extensive stands of cattails and rushes. Water level is highly variable, and the lake is completely dry in some years.

<span class="mw-page-title-main">Big Creek Hydroelectric Project</span> Hydroelectric Power Scheme on upper San Joaquin River System, Sierra Nevada, Central California

The Big Creek Hydroelectric Project is an extensive hydroelectric power scheme on the upper San Joaquin River system, in the Sierra Nevada of central California. The project is owned and operated by Southern California Edison (SCE). The use and reuse of the waters of the San Joaquin River, its South Fork, and the namesake of the project, Big Creek – over a vertical drop of 6,200 ft (1,900 m) – have over the years inspired a nickname, "The Hardest Working Water in the World".

References

  1. 1 2 3 4 "2023 SRP Annual Report" (PDF). Salt River Project. Archived from the original (PDF) on 10 August 2023. Retrieved 9 August 2023.
  2. "A history of canals in Arizona".
  3. "Roosevelt Dam" (PDF). Archived from the original (PDF) on 2011-07-22.
  4. "SRP: Historical timeline". Archived from the original on 2011-05-25. Retrieved 2012-01-11.
  5. http://www.waterhistory.org/histories/reclamation/ Overview of the first 5 Reclamation Projects Retrieved on 2015-1-21
  6. Pisani, Donald (2002). Water and American Government: The Reclamation Bureau, National Water Policy, and the West, 1902-1935. University of California Press. pp. 215–217.
  7. "scr1005s". Arizona State Legislature.
  8. "Roosevelt Lake and Dam". National Park Service. Archived from the original on January 11, 2007.
  9. Earl A. Zarbin (1984). Roosevelt Dam: A History to 1911 (PDF). Retrieved 2012-01-11.
  10. Allen, Lee (9 June 2005). "Roosevelt Lake Renewed". Tucson Weekly. Archived from the original on 2011-06-29.
  11. "Theodore Roosevelt Dam". Bureau of Reclamation. Archived from the original on 2011-06-14.
  12. "Horse Mesa Dam". Bureau of Reclamation. Archived from the original on 2012-01-11. Retrieved 2012-01-11.
  13. "Mormon Flat Dam". Bureau of Reclamation. Archived from the original on 2010-03-18.
  14. "Stewart Mountain Dam". Bureau of Reclamation. Archived from the original on 2012-01-11. Retrieved 2012-01-11.
  15. "2011-2012 Board of Directors | Public Affairs Council". Archived from the original on 2012-05-29. Retrieved 2012-07-02.
  16. Note: Eastman was also on the PAC board in the 2011-2012 term
  17. "NCSL Foundation for State Legislatures | Sponsor List". www.ncsl.org.
  18. "About | Board of Directors of the Greater Phoenix Chamber of Commerce | Greater Phoenix Chamber of Commerce". Archived from the original on 2012-07-23. Retrieved 2012-07-23.
  19. "You searched for node/Salt River Project".
  20. "Molly Greene" . Retrieved 2021-04-22.
  21. "Arizona Chamber of Commerce and Industry - Arizona Trustee Level". Archived from the original on 2011-10-06. Retrieved 2012-07-23.
  22. "Board of Directors | Greater Phoenix Urban League". Archived from the original on 2012-07-01. Retrieved 2012-07-23.
  23. "Archived copy" (PDF). Archived from the original (PDF) on 2014-02-22. Retrieved 2012-07-23.{{cite web}}: CS1 maint: archived copy as title (link)
  24. "LPPC - Members". Archived from the original on 2012-01-22. Retrieved 2012-07-23.
  25. American Public Power Association
  26. http://westernlampac.org/uploads/Western_LAMPAC_descriptor.pdf%5B%5D
  27. "Democratic Attorneys General Association, Inc. - Political 527 Group, Democratic Attorneys General Association, Inc". www.campaignmoney.com.
  28. "Archived copy" (PDF). Archived from the original (PDF) on 2014-02-21. Retrieved 2012-07-23.{{cite web}}: CS1 maint: archived copy as title (link)
  29. "Archived copy" (PDF). Archived from the original (PDF) on 2012-11-02. Retrieved 2012-07-23.{{cite web}}: CS1 maint: archived copy as title (link)
  30. "Private Enterprise Board | ALEC – American Legislative Exchange Council". Archived from the original on 2012-05-11. Retrieved 2012-05-11.