Schwimmtor

Last updated

The Schwimmtor (Floating gate), also known as the Sperrschiff (Blocking ship), was a floating barrier designed to protect the areas along the Donaukanal in Vienna from flooding and ice. It was built by Wilhelm von Engerth, entered service on 13 December 1873, and was scrapped following World War II.

Contents

Supports

The rounded indentation in the quay wall at Brigittenau 2006-12-01 GuentherZ Wien20 Kaimauer Nussdorfer Wehr 1149.jpg
The rounded indentation in the quay wall at Brigittenau

The Schwimmtor was located 166 metres downstream of the Brigittenauer Spitz. The site was chosen because the canal was thin enough at this point that the floating barrier could withstand the pressure which would be caused by an accumulation of floodwater or ice.

A rounded indentation was carved into the left-hand (Brigittenau) quay wall, where the Schwimmtor was to be stowed when it was not needed. Just downstream of this indentation, the quay wall jutted out into the middle of the canal, thereby forming a support against which the barrier could be placed when it was needed.

Supporting the barrier with the same sort of elongated wall on the right-hand (Nussdorf) bank, thus creating a sluice-like gate, would not have been possible, because the current would have made it impossible to remove the barrier again once it had been placed across the canal. For this reason, a niche was carved into this quay wall. The niche was capped and housed two moveable steel barriers (the Stemmtor and the Anlagetor).

These moveable steel barriers could be brought into position by turning a capstan located above the niche. This was connected to the barriers by a rack and pinion, which turned the Stemmtor outward and moved the Anlagetor out of the niche in the wall to form the second support for the floating barrier.

Both the Stemmtor and the Anlagetor were steel truss constructions designed to absorb pressure placed on the floating barrier and to transfer these to the quay wall, to which the Stemmtor was attached.

In order to open the Schwimmtor, the moveable steel barriers were wound back into the niche in the wall using the capstan. The current in the canal would then naturally push the floating barrier back to the Brigittenau quay.

The Schwimmtor could be made to sit lower in the water if loaded with ballast. However, in order to prevent it from blocking the bottom of the canal, four struts made of cast iron and filled with concrete were produced. These ensured that an opening 95 centimetres tall was kept free. The small size of this opening resulted in a very rapid passage of water with great destructive force. The struts were therefore placed on a concrete plate 126 centimetres thick and 30 metres long.

The Schwimmtor

The Schwimmtor in 1873 Sperrschiff 1873.jpg
The Schwimmtor in 1873

The Schwimmtor was a symmetrical-shaped barge without any means of propulsion. It could only be brought into place by means of man-powered winches and the natural current of the canal. Wilhelm von Engerth had not approved the construction of a steam-powered winch because it would have been too expensive.

The Schwimmtor was produced in the John Cockerill’s steel factory in Seraing (Belgium) under the Austrian chief engineer J. Ritter von Kraft. It was assembled in the shipyard in Linz (Upper Austria).

Length: 48.6 metres
Width in the middle: 9.5 metres
Width at the tips: 1.0 metres
Height: 5.7 metres
Weight: 440 tonnes

The Schwimmtor was coated with steel sheets on its sides and on the bottom. These were 10-12 millimetres thick and riveted in place.

Boiler with 30 m² heated surface
Two centrifugal pumps (each of which could shift 165 cubic metres of water per hour)
Two manual pumps
A manual device for loading ballast (which could load 1000 stones per hour or unload 600 stones per hour)
Steam heating, which was designed to prevent the valves and pipes connecting the pumps from freezing.

2000 kilograms of cast iron were kept on board as ballast. Up to 1200 granite stone blocks weighing 17.5 kilograms each could also be loaded as required. The Schwimmtor’s water tanks could also be flooded to make the barrier sit deeper in the water.

The decision to employ the Schwimmtor depended on the level of the water at the Ferdinandsbrücke (today the Schwedenbrücke). When the Danube flooded, ballast was loaded onto the barrier to make it sit deeper in the water, although it was essential that it never completely blocked the flow of the canal. The amount of ballast on board therefore had to be constantly adjusted as the level of the water in the Danube rose and fell.

In order to guard against ice being driven downstream in winter, it was sufficient to place the barrier across the surface of the canal. The Schwimmtor’s straight sides meant that very little ice was pushed beneath it. It was however important that the barrier could rise and fall with the level of water in the canal.

The Schwimmtor was later fitted out with “ice needles”. These were steel spikes that could be attached to the sides of the barrier. They reached to the bottom of the canal and served to catch ice chunks before these could pass underneath the blockade.

The weir and lock in Nussdorf

The Schwimmtor remained in service even after the construction of a weir and lock in Nussdorf, but fell out of use during World War I and was finally scrapped after World War II.

The rounded indentation in the quay wall on the Brigittenau bank, the supporting wall jutting out into the canal, and the niche in the wall on the Nussdorf side of the canal have all survived to the modern day. The capstan which was used to move the Stemmtor and Anlagetor has also been preserved.

Related Research Articles

Oil platform Large offshore structure with oil drilling and related facilities

An oil platform, oil rig, offshore platform, or oil and/or gas production platform is a large structure with facilities to extract, and process petroleum and natural gas that lie in rock formations beneath the seabed. Many oil platforms will also contain facilities to accommodate their workforce, although it is also common for there to be a separate accommodation platform bridge linked to the production platform. Most commonly, oil platforms engage in activities on the continental shelf, though they can also be used in lakes, inshore waters, and inland seas. Depending on the circumstances, the platform may be fixed to the ocean floor, consist of an artificial island, or float. In some arrangements the main facility may have storage facilities for the processed oil. Remote subsea wells may also be connected to a platform by flow lines and by umbilical connections. These sub-sea solutions may consist of one or more subsea wells or of one or more manifold centres for multiple wells.

Lock (water navigation) Device for raising and lowering boats or ships

A lock is a device used for raising and lowering boats, ships and other watercraft between stretches of water of different levels on river and canal waterways. The distinguishing feature of a lock is a fixed chamber in which the water level can be varied; whereas in a caisson lock, a boat lift, or on a canal inclined plane, it is the chamber itself that rises and falls.

Bristol Harbour Harbour in Bristol, England

Bristol Harbour is the harbour in the city of Bristol, England. The harbour covers an area of 70 acres. It is the former natural tidal river Avon through the city but was made into its current form in 1809 when the tide was prevented from going out permanently. A tidal by-pass was dug for 2 miles through the fields of Bedminster for the river, known as the "River Avon New Cut", "New Cut", or simply "The Cut". It is often called the Floating Harbour as the water level remains constant and it is not affected by the state of the tide on the river in the Avon Gorge, The New Cut or the natural river southeast of Temple Meads to its source.

Caisson (engineering) Rigid structure to provide workers with a dry working environment below water level

In geotechnical engineering, a caisson is a watertight retaining structure used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, or for the repair of ships. Caissons are constructed in such a way that the water can be pumped out, keeping the work environment dry. When piers are being built using an open caisson, and it is not practical to reach suitable soil, friction pilings may be driven to form a suitable sub-foundation. These piles are connected by a foundation pad upon which the column pier is erected.

Döbling 19th District of Vienna in Austria

Döbling is the 19th District in the city of Vienna, Austria. It is located on the north end from the central districts, north of the districts Alsergrund and Währing. Döbling has some heavily populated urban areas with many residential buildings, and borders the Vienna Woods. It hosts some of the most expensive residential areas such as Grinzing, Sievering, Neustift am Walde and Kaasgraben and is also the site of many Heurigen restaurants. There are also some large Gemeindebauten, including Vienna's most famous, the Karl-Marx-Hof.

Brigittenau 20th District of Vienna in Austria

Brigittenau is the 20th district of Vienna. It is located north of the central districts, north of Leopoldstadt on the same island area between the Danube and the Danube Canal. Brigittenau is a heavily populated urban area with many residential buildings.

Donaukanal Waterway in Vienna

The Donaukanal is a former arm of the river Danube, now regulated as a water channel, within the city of Vienna, Austria. It is 17.3 kilometres (10.7 mi) long and, unlike the Danube itself, it borders Vienna's city centre, Innere Stadt, where the Wien River (Wienfluss) flows into it.

Karl Johansslussen

Karl Johanslussen is a lock and a sluice, along the Söderström river connecting and controlling the flood discharge between Riddarfjärden, the easternmost part of Lake Mälaren, and Saltsjön, the section of the Baltic Sea reaching into central Stockholm, Sweden. The lock is 75 metres long, 10 metres wide and 3.90 metres deep. The maximum height is 3.8 metres. The lock is closed from 2016 to 2021 due to large reconstruction works in the area.

LNG carrier

An LNG carrier is a tank ship designed for transporting liquefied natural gas (LNG).

Wilhelm Engerth

Wilhelm Freiherr von Engerth was an Austrian architect and engineer, known for being the designer of the first practical mountain locomotive. For his services he was elevated in 1875 to the baronetcy.

Harbours in Vienna

For a long time, it was not necessary to build a Harbour in Vienna, because the existing natural landing points were sufficient for the level of trade on the Danube. It was only when steamships began to arrive in great numbers that a harbour offering safe berths became essential. Even then however, goods were for the most part loaded and unloaded at an unenclosed river harbour that was established at the end of the 19th century.

Nussdorf weir and lock

The Nussdorf weir and lock are works of hydraulic engineering located in the Viennese suburb of Nussdorf at the point where the Donaukanal leaves the Danube. The weir and lock were built following the adoption of a new law in July 1892, which also authorised the construction of the Vienna Stadtbahn and the transformation of the Donaukanal into a winter harbour.

Riet is a village in the town of Vaihingen an der Enz, Germany. The population is around 900, and it is about 5 kilometres (3.1 mi) south of central Vaihingen.

Caisson (lock gate) Form of lock gate consisting of a large floating iron or steel box

A caisson is a form of lock gate. It consists of a large floating iron or steel box. This can be flooded to seat the caisson in the opening of the dock to close it, or pumped dry to float it and allow it to be towed clear of the dock.

USS <i>AFDB-2</i> Large auxiliary floating drydock of the US Navy

USS ABSD-2, later redesignated as AFDB-2, was a ten-section, non-self-propelled, large auxiliary floating drydock of the US Navy. Advance Base Sectional Dock-2 was constructed in sections during 1942 and 1943 by the Mare Island Naval Shipyard in Vallejo, California for World War II. Her official commissioning ceremony took place on 14 August 1943 with CDR. Joseph J. Rochefort in command. With all ten sections joined, she was 927 feet long, 28 feet tall, and with an inside clear width of 133 feet 7 inches. ABSD-2 had a traveling 15-ton capacity crane with an 85-foot radius and two or more support barges. The two side walls were folded down under tow to reduce wind resistance and lower the center of gravity. ABSD-2 had 6 capstans for pulling, each rated at 24,000 lbf (110,000 N) at 30 ft/min (0.15 m/s), 4 of the capstans were reversible. There were also 4 ballast compartments in each section.

USS <i>ABSD-6</i> WWII American floating drydock

ABSD-6 is an advanced base sectional dock which was constructed of nine advance base docks (ABD) sections for the US Navy as an auxiliary floating drydock for World War II. ABSD-6 was built by Mare Island Naval Shipyard at Vallejo, California. ABSD-6 was commissioned on 28 September 1944. Advance Base Sectional Dock-6 was constructed in sections during 1942 and 1943. Each section are 3,850 tons and are 93 feet long each. Each Section had a 165 feet beam, a 75 feet molded depth and had 10,000 tons lifting capacity each. There were 4 ballast compartments in each section. With all nine sections joined, she was 825 feet long, 28 feet tall, and with an inside clear width of 133 feet 7 inches. ABSD-2 had a traveling 15-ton capacity crane with an 85-foot radius and two or more support barges. The two side walls were folded down under tow to reduce wind resistance and lower the center of gravity. ABSD-6 had 6 capstans for pulling, each rated at 24,000 lbf (110,000 N) at 30 ft/min (0.15 m/s), 4 of the capstans were reversible.

USS <i>ABSD-4</i> Large auxiliary floating drydock of the US Navy

USS ABSD-4, later redesignated as AFDB-4, was a nine-section, non-self-propelled, large auxiliary floating drydock of the US Navy. Advance Base Sectional Dock-4 was constructed in sections during 1942 and 1943 by the Mare Island Naval Shipyard in Vallejo, California for World War II. With all ten sections joined, she was 927 feet long, 28 feet tall, and with an inside clear width of 133 feet 7 inches. ABSD-4 had a traveling 15-ton capacity crane with an 85-foot radius and two or more support barges. The two side walls were folded down under tow to reduce wind resistance and lower the center of gravity. ABSD-4 had 6 capstans for pulling, each rated at 24,000 lbf (110,000 N) at 30 ft/min (0.15 m/s), 4 of the capstans were reversible. There were also 4 ballast compartments in each section.

USS <i>ABSD-5</i> WWII American floating drydock

USS ABSD-5, later redesignated as AFDB-5, was a nine-section, non-self-propelled, large auxiliary floating drydock of the US Navy. Advance Base Sectional Dock-5 was constructed in sections during 1943 and 1944 by the Chicago Bridge & Iron Company in Morgan City, Louisiana for World War II. With all nine sections joined, she was 825 feet long, 28 feet tall, and with an inside clear width of 133 feet 7 inches. ABSD-5 had two traveling 15-ton capacity crane with an 85-foot radius and two or more support barges. The two side walls were folded down under tow to reduce wind resistance and lower the center of gravity. ABSD-5 had 6 capstans for pulling, each rated at 24,000 lbf (110,000 N) at 30 ft/min (0.15 m/s), 4 of the capstans were reversible. There were also 4 ballast compartments in each section.

Jedlesee

Jedlesee is a suburb of Floridsdorf, the 21st district of Vienna. An independent community until 1894, it was joined along with Leopoldau, Donaufeld, Floridsdorf and Neu Jedlesdorf to the greater Floridsdorf municipality, becoming part of Vienna in 1904. Jedlesee is most notable for being the site of the estate of Countess Anna Maria Erdődy, close friend and patron of Beethoven, who stayed there with her on numerous occasions between 1805 and 1818.

Tilting weir Type of weir

A tilting weir or tilting gate is a moveable weir being a type of weir used for raising and lowering a head of water by controlling the flow of water to a lower catchment area or drainage basin. Typically the plate or paddle of the tilting weir moves up and down in a narrow duct by titling, pivoting or rotating on its bottom horizontal axis - which opens or closes the tilting weir thus controlling the flow of water out of the higher drainage basin. For example, a reservoir, lake, duct, channel, river, pond, dyke or ditch to a lower lying area or catchment or drainage basin.

References