The topic of this article may not meet Wikipedia's general notability guideline .(January 2024) |
Shahpur શાહપુર | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| | |||||||||||
| General information | |||||||||||
| Location | Old City, Halim Ni Khadki, Shahpur, Ahmedabad, Gujarat 380004 | ||||||||||
| Coordinates | 23°02′21″N72°34′52″E / 23.03920°N 72.58124°E | ||||||||||
| System | | ||||||||||
| Owned by | Gujarat Metro Rail Corporation Limited | ||||||||||
| Operated by | Ahmedabad Metro | ||||||||||
| Line | Blue Line | ||||||||||
| Platforms | 2 (1 island platforms) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground, Double track | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Status | Operational | ||||||||||
| History | |||||||||||
| Opening | 30 September 2022 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Shahpur is an underground metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. This metro station consists of the main Ahmedabad Urban Healthcare Centre along with Madhupur Police station.
Phase 1 of the metro was opened to the public on 30 September 2022. [1] [2] [3] [4]
Shahpur track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/ Entrance |
| M | Mezzanine | Fare control, station agent, Ticket/token, shops |
| P | Platform 1 Eastbound | Towards → Vastral Gam Next Station: Gheekanta |
| Island platform | Doors will open on the right | ||
| Platform 2 Westbound | Towards ← Thaltej Next Station: Old High Court Change at the next station for Red Line | |