Sheraton Centre Toronto Hotel | |
---|---|
General information | |
Location | Toronto, Ontario, Canada |
Address | 123 Queen Street West |
Coordinates | 43°39′04″N79°23′03″W / 43.65111°N 79.38417°W |
Construction started | 1970 |
Completed | 1972 |
Height | |
Roof | 135 m (443 ft) |
Technical details | |
Floor count | 43 |
The Sheraton Centre Toronto Hotel is a 1300-room, 43-story hotel in Downtown Toronto, Ontario, Canada, opened in 1972. [1] [2] It is the second-tallest all-hotel building in Toronto, after the Delta Toronto Hotel. [3] [4]
The hotel opened on October 16, 1972 [5] as the Four Seasons Sheraton Hotel, a joint venture between Sheraton and Toronto businessman Issy Sharp's Four Seasons chain. [6] At the time, it was the second-largest hotel in Toronto, behind only the Royal York Hotel. Sharp was unhappy with the partnership, and sold his 49 percent share in the hotel in 1976 for $18.5 million, and it was renamed The Sheraton Centre of Toronto. [7] The name has since been modified slightly to the Sheraton Centre Toronto Hotel. Marriott International, Sheraton's parent company, sold the hotel to Brookfield Asset Management in 2017 for $335 million. [8]
The new hotel was built as part of an urban renewal project connected to the Toronto City Hall and Nathan Phillips Square project. The site of the Sheraton was considered a "commercial slum" with two burlesque theatres, pawn shops and a cinema. [9] The site was expropriated by the Old City of Toronto in 1964 and the site cleared in 1965. The site was later sold for the construction of the Four Seasons Sheraton Hotel.[ citation needed ]
The hotel was a host venue for the World Hockey Summit in 2010. [10]
The hotel consists of three connected buildings located between Queen, York, and Richmond streets: the three-floor entrance, the eleven-floor building on Richmond Street, and the main building, which has 43 floors and faces Queen Street, looking directly at the Toronto City Hall. [11] The project was developed by John B. Parkin Associates. [12] The inner yard contains a landscaped garden with a waterfall, which was designed by a Canadian architect, J. Austin Floyd. [11] The hotel has 171,716 sq ft of total event space, [13] the largest hotel convention facilities in Toronto, [14] including a ballroom with a capacity of 3500. The hotel lobby serves as one of the nodes of the PATH network of pedestrian tunnels. There was a two screen cinema on the lower level until the 1990s. The hotel is connected to the square by a walk bridge over Queen Street West.[ citation needed ] The transmitter for CIRR-FM is located atop the hotel.[ citation needed ]
First Canadian Place is a skyscraper in the Financial District of Toronto, Ontario, at the northwest corner of King and Bay streets, and serves as the global operational executive office of the Bank of Montreal. At 298 m (978 ft), it is the tallest building in Canada, the 34th tallest building in North America, and the 243rd tallest in the world. It is also the third tallest free-standing structure in Canada, after the CN Tower and the Inco Superstack chimney in Sudbury, Ontario. The building is owned by Manulife Financial Corporation in addition to a private consortium of investors including CPP Investments. The building is managed by Brookfield Properties.
Royal Bank Plaza is a skyscraper in Toronto, Ontario, Canada that has served as the corporate headquarters for the Royal Bank of Canada since 1976. The building shares with the Fairmont Royal York Hotel the block in Toronto's financial district bordered by Bay, Front, York, and Wellington streets. It is owned by Pontegadea.
Commerce Court is an office building complex on King and Bay Streets in the financial district of Toronto, Ontario, Canada. The four-building complex is a mix of Art Deco, International, and early Modernism architectural styles. The office complex served as the corporate headquarters for the Canadian Imperial Bank of Commerce (CIBC) and its predecessor, the Canadian Bank of Commerce, from 1931 to 2021. Although CIBC relocated its headquarters to CIBC Square, the bank still maintains offices at Commerce Court.
The Bay Adelaide Centre is an office complex in the Financial District of Toronto, Ontario, Canada. The first phase, a 51-storey skyscraper known as Bay Adelaide West, was completed in July 2009. The second phase, the 44-storey Bay Adelaide East, was completed in October 2016. A third tower, Scotiabank North Tower, opened in 2022 and serves the new global head office of Canadian bank Scotiabank.
One Wall Centre, also known as the Sheraton Vancouver Wall Centre North Tower, is a 48-storey, 157.8 m (518 ft) skyscraper hotel with residential condominiums in the Wall Centre development at 1088 Burrard Street in Downtown Vancouver, British Columbia, Canada. The tower was designed by Perkins+Will Canada, and completed in 2001, and went on to win the Emporis Skyscraper Award for the Best New Skyscraper the same year. As of 2023 it is the sixth-tallest building in the city.
The Temple Building was a 12-storey, 36.93 m (121.2 ft) highrise erected at 62 Richmond Street West and Bay Street in Toronto, Ontario.
The Empire Landmark Hotel, often referred to by its original name, the Sheraton Landmark, was the tallest hotel in Vancouver, British Columbia. It was located on one of Vancouver's busiest thoroughfares at 1400 Robson Street, in the West End of Downtown Vancouver. The building was revolutionary at the time, as it had a revolving restaurant on its top floor, Cloud 9, which was one of only two revolving restaurants in Vancouver, the other being the Harbour Centre. Between its completion in 1973 and the completion of nearby Bentall Centre in 1974, the Empire Landmark Hotel was the third tallest building in Vancouver.
The Bow is a 158,000-square-metre (1,700,000 sq ft) skyscraper in downtown Calgary, Alberta, Canada. The 236 metre (774 ft) building was the tallest in Calgary between July 8, 2010, when it surpassed the Suncor Energy Centre, and May 11, 2016, when it was exceeded by Brookfield Place. The Bow is currently the second tallest office tower in Calgary and the third tallest in Canada outside Toronto. The Bow is also considered the start of redevelopment in Calgary's Downtown East Village. It was completed in 2012 and was ranked among the top 10 architectural projects in the world of that year according to Azure magazine. It was built for oil and gas company Encana, and was the headquarters of its successors Ovintiv and Cenovus.
The Sheraton Hamilton Hotel, opened on August 15, 1985, is a 19-storey, 76 metres (249 ft), 299 room hotel in downtown Hamilton, Ontario, Canada. Situated on King Street West, East of Bay Street North, the hotel is part of the Lloyd D. Jackson Square complex.
One Dallas Center is a modernist skyscraper located in the City Center District of downtown Dallas, Texas, completed in 1979. The building has 30 floors and rises 448 feet. One Dallas Center is currently tied with the Sheraton Dallas Hotel North Tower as the 25th-tallest building in the city. The building was originally planned as part of a three-building complex designed by I.M. Pei & Partners, but only one tower was constructed.
The Sheraton New York Times Square Hotel is a 501 ft (153 m), 51-story hotel located near Times Square in Midtown Manhattan, New York City. It faces 7th Avenue, 52nd Street, and 53rd Street. It is one of the world's 100 tallest hotels, and one of the tallest hotels in New York City.
The Four Seasons Hotel and Residences Toronto is a complex consisting of a 204-metre, 55-storey residential condominium tower and a 125-meter, 30-storey luxury hotel tower in the Yorkville district of Toronto, Ontario, Canada, which opened on October 5, 2012. Located at 60 Yorkville Avenue, at its intersection with Bay Street, the complex is situated one block east of the former Four Seasons Hotel Toronto building at 21 Avenue Road.
The New York Hilton Midtown is the largest hotel in New York City and world's 101st tallest hotel. The hotel is owned by Park Hotels & Resorts and managed by Hilton Worldwide. At 2,052 rooms total and over 150,000 sq ft of meeting space, the hotel is the largest Hilton in the continental U.S.
Brookfield Place is a skyscraper located in downtown Calgary, Alberta, Canada. The complex is home to Brookfield Place East, a 56-storey 247 m (810 ft) office tower, which, upon its completion in 2017, became the tallest building in Calgary, exceeding The Bow. Its anchor tenant is the oil and gas company Cenovus.
{{cite web}}
: CS1 maint: unfit URL (link){{cite web}}
: CS1 maint: unfit URL (link)